Subsea Decommissioning

Slides:



Advertisements
Similar presentations
Completion Agenda At the end of this presentation, you will be able to: Define completion Describe the process of completion List and define the different.
Advertisements

FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
HMT Bulk Loading/Unloading
Energy Control Procedures Lockout/Tagout 29 CFR
Step 1: Digging a Cellar On land, a majority of wells begin with digging a cellar from three to fifteen feet in depth. The purpose of a cellar is to align.
BIDMC EH&S Dept1 Lockout/Tagout Training Proper Lockout Procedure BIDMC EC 60 Policy A teaching hospital of Harvard Medical School.
START-UP AND OPERATION OF MECHANICALLY SEALED EQUIPMENT 1:13.
Part 2.2 Well Control. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Understand well control.
Petroleum Engineering 406
Short Bolting Issues John Newhouse MidCon - Arkoma.
MWCC Overview, Well Containment Operations & SIMOPS Spill Control Association of America – Annual Meeting March 20, 2014 Carmine Dulisse.
YOU ALWAYS GET WHAT YOU ALWAYS GOT. Roles and Responsibilities Arden Delisle Chief Inspector Al-Pac March 24 th 2014.
HP Riser Disconnect Process Flow September HP Riser Disconnect Process Flow Plan to reduce the 3,500psi to 3,000psi via hot stab.
The New Low Lead Regulations 2014 AWWA Meeting February 26, 2014 LAURA A. TAYLOR (334)
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
Removing 36 hours from a workover Optimising rig time using LWIV & eRED technology Presented by: Andy Skinner Date: 9 th March 2011 Slide 1.
LOCKOUT / TAGOUT How to Effectively & Efficiently Control Hazardous Energy LOTO Presentation – Worker, 9/2004.
Lockout/Tagout (LOTO):
LOCKOUT/TAGOUT.
Introduction to Hydraulics ClassAct SRS enabled. In this presentation you will: identify the fundamental parts of a hydraulic system and safety issues.
Controlling Hazardous Energy
© 2011 Chevron API 16A 3 rd Edition Summer Conference Committee Meeting 24-June-2013 API 16A Chairman: John Busby Co-Chair: Jim McCabe.
Overview of Oil & Gas Sector The following slides are not a tutorial but merely an overview of the various phases involved in an oil & gas development.
LOCKOUT / TAGOUT Employee Training Thomas McGee, L.C. 920 Main Street, Suite 1700 Kansas City, MO (816) * Toll Free (800)
Deepwater drilling challenges Gm, Drilling – murphy malaysia
Gulf of Mexico Simultaneous Operations Safe Work Practice
OGP STANDARDS COMMITTEE MEETING Berlin, Germany Presentation of TC 23: current events and the agenda of the coming years V.V.Vernikovsky, executive.
Oklahoma State University EHS Lockout/Tagout Standard Proper Lockout Procedure.
Trindel Insurance Fund
Lockout/Tagout Standard
/0309 Copyright ©2003 Business and Legal Reports, Inc. BLR’s Safety Training Presentations Lockout/Tagout Refresher 29 CFR
CONTROL OF HAZARDOUS ENERGY LOCKOUT/ TAGOUT PROGRAM.
After Deepwater Horizon: The New Offshore Regulatory Regime 66 th annual Oil and Gas Law Conference Houston, Texas February 20, 2015 Copyright © 2015 by.
IRP21: It’s Almost Over 2010 ICoTA Roundtable. Driven by events Suggested by various regulatory bodies We did have a choice ‘We’ could write this or let.
MC 252 Junk Shot Peer Assist – 6 May 2010 Report of Findings 07 May 2010.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
MMS: Securing Ocean Energy & Economic Value for America Lake Jackson District Lake Charles District Lafayette District Houma District New Orleans District.
Risk in Well Plugging & Abandonment by Twachtman Snyder & Byrd, Inc
Isolation Valve Installation Readiness Trevor Smith/Mark Nichols 11 May 2010 MC 252 Incident Response.
OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION OVERVIEW OF OIL & GAS EXPLORATION, DEVELOPMENT and STATE REGULATION February 18, 2012.
Equipment Development for Gas-Lift in Sub-Sea Operations Roger Stinson Product Manager - Gas Lift Schlumberger Completions Systems.
March Why is MassDEP proposing new UST regulations? DFS’s regulation: standards for tanks construction, installation, O&M, decommissioning and.
2015 SAFETY SEMINAR HIGHLIGHTS OF 2014 Rick Moses Chief, Bureau of Safety Florida.
Gulf Coast Environmental Affairs Group
Energy Control Procedures Lockout/Tagout 29 CFR Paul Schlumper, PE, CSP Georgia Tech Research Institute.
HPU FILTERS LOW PRESSURE FILTER FROM APU UNIT. CLOSE APU HYDRAULIC FLUID VALVE. FILL FILTER WITH HYDRAULIC FLUID PRIO TO INSTALLATION. LUBRICATE GASKET.
1 IMPLEMENTATION OF OIL AND GAS UPSTREAM PROJECT IN MAXIMO.
Kick Submited to :- Submitted by:- Er Akash Rana Devahish Yadav B.Tech IIIrd Year Petroleum Technology 1.
Introduction to Well Completions
"Welder Certification" Weldertraining.org The purpose of this presentation is to introduce you to the various aspects of welder certification. This is.
Procedures.
150 years Non-System Lockout/Tagout BASF Requirements References: GSS01 – Non-System Lockout/Tagout & Line Breaking.
Well Control Rule Lakeisha Harrison, Chief, Regulations and Standards Branch, Office of Offshore Regulatory Programs, BSEE July 2016 “To promote safety,
The Rotation Sleeve System Triangle Equipment AS in co-operation with Ericsson Saab Avionics AB The EXPRO Group.
SCG-SH-0200 Southern Company Generation Clearance Procedure Awareness Training for Contractors and Nonlisted Personnel.
Generic GE TRS Compliance Summary
Lockout/Tagout Standard
CASING.
Potential Risks, Limitations, And Failure Mechanisms Arising From Fastener Design, Manufacture, Material, And Coating Selection Prepared for the National.
Sources of Energy ELECTRICAL MECHANICAL PNEUMATIC FLUID AND GASES
Oil-Field Hydraulics Chapter 8 Shut-in Procedures
Department of Buildings
Annual Inspection Certification Program
First Break To establish minimum safety requirements when performing a first break “First Break” – Refers to the initial opening of piping/equipment.
Energy Control Procedures Lockout/Tagout 29 CFR
Control of Hazardous Energy
Energy Control Procedures Lockout/Tagout 29 CFR
High Level Operations Transition Timeline
LOCKOUT/TAGOUT By: Kory Hildebrand.
Presentation transcript:

Subsea Decommissioning Casey Kavanaugh Workover/Decommissioning Coordinator February 10, 2015

Overview Idle Iron Statistics Subsea Well Intervention Units and What BSEE is requiring

Idle Iron

Current Regulations § 250.1703 What are the general requirements for decommissioning? When your facilities are no longer useful for operations, you must: Remove all platforms and other facilities; § 250.1711 - When will BSEE order me to permanently plug a well? BSEE will order you to permanently plug a well if that well: (a) Poses a hazard to safety or the environment; or (b) Is not useful for lease operations and is not capable of oil, gas, or sulphur production in paying quantities.

NTL 2010-G05 The NTL Defines “No longer useful for operations” which is used in the regulations for: Wells No production 5 years No plans for future operations Platforms Toppled Has not been used in past 5 years for operations associated with exploration, development or production of oil/gas

NTL Requirements Idle Wells must perform one of the following within 3 years: PA the well in accordance 250.1712 - .1717; or TA the well in accordance 250.1721; or Provide the well with downhole isolation. Within 2 years of setting downhole plugs, they must either PA/TA the well Idle platforms must be removed as soon as possible, but not longer than 5 years after it became no longer useful.

Stats BSEE is tracking companies’ compliance with their submitted idle iron abandonment plans Inventory of idle iron at time of NTL 3,233 total idle wells 617 total idle platforms Current Inventory of idle iron (as of 2/9/2015) 1,010 total idle wells (261 Newly idle since NTL) 270 total idle platforms (82 Newly idle since NTL)

Subsea Well Intervention Units

Subsea Well Intervention Well Intervention Units – any non-rig BOP subsea operation that uses riser or riserless technology to conduct well work. Three types: Intervention Riser System (IRS) Subsea Intervention Lubricator (SIL) Well Stimulation Tool (WST)

Subsea Well Intervention Intervention Riser System (IRS) This type of intervention unit has a surface BOP with a subsea emergency disconnect package (EDP) on top of the tree/wellhead connected via a riser. The EDP is a system of valves or rams that will shear and seal the wellbore in case of a well control issue or drive/drift off of the vessel. Subsea Intervention Lubricator (SIL) This type of intervention unit contains a workover package and wireline lubricator located on top the subsea tree/wellhead. The workover package is a system of valves or rams utilized for well control purposes, but the package will shear and seal the wellbore in case of a well control issue or drive/drift off of the vessel.

Subsea Well Intervention (cont.) Well Stimulation Tool (WST) This type of intervention unit is used for subsea pumping operations (i.e. acid jobs). It is usually connected to the top of the tree or through the choke. The well stimulation tool is a system of valves (with at least 2 barriers) used for well control purposes. BSEE has slightly different requirements on this system due to no pipe passing through the unit.

Subsea Intervention Units BSEE Requirements for Subsea Intervention Units Subsea Intervention Units are in retrospect considered BOPs per 250.1706(e). These units are being reviewed in accordance with the subsea BOP regulations as much as possible. The following documentations are currently being requested and reviewed by BSEE: Control system drawings Stump Test Procedures On-Bottom Procedures Third Party Shearing Verification Third Party Compatibility

Control System Drawings BSEE is requesting the following drawings: HPU Hydraulic Drawings Intervention Unit Hydraulic Drawings Pod Drawings (if applicable) From these drawings BSEE will review the following: Make sure the drawings correctly depict how the intervention system will operate. Deadman system circuitry Autoshear system circuitry (DP vessels only) Valving Types (Gate Valve versus BSR) 2 barrior rule

Third Party Shearing Verification Shearing Data that is being requested by BSEE: Actual shearing data showing that the valves or rams located on the intervention unit can shear an equal or more ridged workstring/wire than what will be across the stack during the operation you intend to perform with subsequent pressure tests. This shearing test must be third party verified. Third party verified theoretical calculations for each size pipe/wire that will be across the intervention stack calculated with a pressure equal or greater than the maximum anticipated surface pressure (MASP) must be submitted. This is to show that the valving or shear rams installed are capable of shearing any size workstring/wire across the stack under MASP. Not required for WSTs.

Third Party Compatibility Third Party must certify that the Intervention Unit: is designed for specific equipment on the rig and for the specific well design. has not been compromised or damaged from previous service. will operate in the conditions in which it will be used. This must be submitted and approved by BSEE before any well work can begin. Not Required for WSTs

Stump Test and On-Bottom Procedures A stump and on-bottom test must be reviewed and approved by BSEE. Stump Test Procedures A full pressure test is required. All ROV hot stab functions must be tested. Must function test deadman and autoshear systems. On-Bottom Test Requirements Must function test and verify closure at least one valve or set of rams with a ROV hot stab with a subsequent pressure test. Must function test the deadman system and verify closure at least one valve or set of rams with a subsequent pressure test.

Website: www.bsee.gov @BSEEgov BSEEgov Bureau of Safety and Environmental Enforcement