Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved SDR Forum Document Development Process.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Advertisements

Ensuring that building products meet code requirements ICC Evaluation Service, Inc. The ICC-ES Evaluation Committee conducts open public hearings on proposed.
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
TETF Workshop. Agenda Eligibility Applying for the Award Application process and submission guidelines.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
LIGO-G R LSC Presentations Policy: a proposal for procedures David Shoemaker and Peter Saulson LSC, Livingston 14 March 2001.
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE /0036r0 Submission Sept 2005 Tom Siep, Cambridge Silicon Radio PlcSlide 1 Matthew Sherman’s Comments to P&P Notice: This document.
Proposal to Amend Bylaws Senate Meeting Bernice Brody, Speaker of the Senate Helen Patricia, Deputy Speaker of the Senate.
Doc.: IEEE /0748r2 Submission May 2011 Tom Siep, CSRSlide 1 Process for Creating TGai Draft Date: Authors:
3GPP2 Publication Process Training TSG-S PMT. December Presentation Overview Background OP Input and Intent Publication Process Overview The Revised.
Doc.: IEEE /0240r1 Submission November 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – November 2006 IEEE P
Doc.: IEEE /0034r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 March Plenary Closing Report IEEE P Wireless RANs Date: Authors:
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
Report of the Technical Subcommittee Mario Bergeron, Technical Subcommittee Chair/NGEC Vice Chair.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Doc.: IEEE /0712r0 Submission May 2007 Lee Armstrong, Armstrong Consulting, Inc.Slide 1 TGp Opening Notice: This document has been prepared to.
Doc.: IEEE /0010r0 Submission March 2006 Steve Shellhammer, QualcommSlide 1 Overview of the TAG Notice: This document has been prepared.
SECTION BYLAWS APROVAL PROCESS Five Easy Steps. Step 1: Collect Data Obtain Template from SWE Communities Professional Section Bylaws Community Collegiate.
Doc.: IEEE /0804r0 Submission May 2007 Al Petrick, WiDeFiSlide 1 TGmb – Closing Report Notice: This document has been prepared to assist IEEE.
Doc.: IEEE /1936r0 Submission December 2006 Bruce Kraemer, Marvell Adrian Stephens, IntelSlide 1 TGn Proposed Draft Revision Notice Notice: This.
Doc.: IEEE /1218r0 SubmissionBruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company Address Phone.
IEEE /r5 Submission November 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Doc.: IEEE RR-TAG_Nov05_Liaison_Report.ppt Submission November 2005 Peter Murray, MotorolaSlide 1 RR-TAG Liaison Report IEEE
November 2005 doc.: IEEE /1051r0 09/06/2018
TGp Opening Date: Authors: July 2007 Month Year
11k London Closing Plenary
IEEE WG Closing Report – July 2006
TGp Opening Date: Authors: January 2007 Month Year
IEEE 1914 NGFI IEEE RoE TF Opening Report
11k Seattle 3 Agendas Date: Authors: September 2005
IEEE P Motions at the July Plenary EC Meeting
Indian Policies and Procedures (IPPs) OASIS December 7, 2017
doc.: IEEE <doc#>
TGp September Opening Presentation
IEEE WG Closing Report – July 2006
IEEE WG Closing Report – March 2006
TGp Closing Report Date: Authors: July 2005 Month Year
Introduction to Sponsor Balloting using the myBallot™ system
JTC1 Chair’s Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
January Opening Report
RTA TIG Agenda Date: Authors: March 2019
TGp Closing Report Date: Authors: March 2006 Month Year
IEEE IMT-Advanced Review Process
IEEE White Space Radio Draft Development Procedure
Sponsor Ballot Comment Resolution
IEEE IMT-Advanced Review Process
IEEE IMT-Advanced Review Process
Comments on IMT-Advanced Review Process
January Opening Report
IEEE IMT-Advanced Review Process
What is a CA document? Date: Authors: March 2005 March 2005
Overview of WG Letter Ballot Process
IEEE P Wireless RANs Date:
Matthew Sherman’s Comments to P&P
TGn Proposed Draft Revision Notice
Report and Minutes of TGm January 2007
Agenda and minutes TGn PHY ad hoc
Author’s Name Company Address Phone Oliver Holland
RR-TAG Liaison Report IEEE
IEEE r: Fast BSS Transition TG Agenda
IEEE P Motions at the July Plenary EC Meeting
IEEE MEDIA INDEPENDENT SERVICES DCN:
JTC1 Chair’s Closing Report
TGu Draft Revision Procedure
IEEE P Motions at the July Plenary EC Meeting
TGp Closing Report Date: Authors: November 2006 Month Year
July 2013 Opening Report Date: Authors: July 2013
Presentation transcript:

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved SDR Forum Document Development Process

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved What is covered in this presentation… Project Initiation Document Development Project Tracking Voting Rights

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved Project Initiation SDR Forum Policy 002

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved “Projects” in the SDR Forum are Initiated through the Project Approval Committee Regulatory Committee Reports & Recommendations Reports, Specifications & Recommendations 3 rd Party Specifications & Standards Member Project Requests Technical Committee Partner Project Requests Project Requests, Business Models, Requirements & Use Cases Project Approval Committee Projects Partner Project Requests Reports & Recommendations Market Data Regulatory Proceedings Markets Committee

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved What is a “Project” A project is defined in the SDRF Strategic Plan (see Section 2) as “an activity within a committee that develops an SDR Forum Report, an SDR Forum Recommendation or an SDR Forum Specification.” A proposal must be submitted to the PAC and approved: when a new project is initiated, or when an existing project’s scope or milestone dates change sufficiently that the approved project description becomes inaccurate. A project that does not gain PAC approval, or that loses approval due to failure to meet conditions established by the PAC, will not be supported by SDRF resources (meeting rooms, reflectors, publicity, staff time, etc.) and is not eligible for committee-level or forum-level ballot.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Key players in the project approval process Project Champion – Representative of a member organization who wishes to initiate a project PAC Representative – Person on the PAC assigned to help the Project Champion in preparing the proposal and gaining approval

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved The PAC Process Occurs in 4 Stages Proposal introduction Champion contacts the PAC with project title and states intent to propose project. PAC assigns a disposition date for the proposal. PAC assigns a representative to the proposal. Proposal preparation Champion prepares the proposal with the help of the PAC representative. All persons listed as committed contributors in the proposal must approve it before submission. The proposal is due to the PAC chair 2 weeks before the disposition date. Proposal Consideration Proposal Disposition

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved What is Considered in Evaluating a Proposal Is the proposal well defined What is the expected impact of the proposed project What is the probability of success What will be the impact of this project on other projects within the Forum Is there evidence of committed participation by Forum members Is the project relevant to the SDR Forum Strategic Plan

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Proposal Distribution PAC discusses and votes for one of the following options. Approval Approval contingent on specified conditions Request for modification and resubmission Disapproval Two types of conditions may be attached to a contingent approval: 1.Initiation conditions – conditions that must be met before the project can be initiated. 2.Execution conditions – conditions that must be met during execution of the project.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved More Information The PAC procedures policy can be found at: ACprocedures pdf For additional discussion, Contact John Chapin, Chair of the SDR Forum Project Approval Committee, or Lee Pucker, CEO of the SDR Forum

Copyright © 2008 Software Defined Radio Forum, Inc. All Rights Reserved Document Development Process SDR Forum Policy 001

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved The Document Process Occurs in 3 stages Work Group Develops Proposed Document (Minimum time 3 Weeks) Committee Balloting And Approval (Minimum Time 4 Weeks) SDR Forum Balloting And Approval (Minimum Time 24 Hours) Document Contributions Document returned work group with comments Key Point – the term “Work Group here refers to any individual or group developing a document for SDR Forum approval Work Group, Task Group, SIG, etc.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Task Group Develops Document Work Group Chair Initiates Ballot Work Group Chair Reviews Comments Document Contributions Ballot Successful? Last Call and Balloting (3 Weeks) If No, Document is returned to task group with comments Document Sent to Committee “Work Group” Develops Proposed Document

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved SDR Forum Document Types Specifications (S) Documents designed to provide an SDRF-supported definition of a specific architectural element or interface within a software defined radio system. Specifications represent voluntary standards with respect to an SDR application or operation. Reports (P) Formally present the current state of some relevant topic with the Software Defined Radio community (regulations, markets, business, etc.) Recommendations (R) Documents provided by the Forum to other organizations, such as the FCC or the JPEO, to provide guidelines or opinions. Information (I) Documents that act as inputs to the Forum from member companies or other organizations, and may include reports, articles, specifications, etc. that are considered important to the SDR Forum and its members. Historical (H) Documents that have lost their value to the SDR Forum. They are documents that were previously determined to be Specification, Reports, or Information documents.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Solicited Submissions The process supports 3 types of submission solicitations Request for Market Information (RMI) Request for Information (RFI) Request for Proposal (RFP) A Key point – RMI, RFI, and RFP’s of this type do not require full SDR Forum approval But they do require committee approval

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Control Points in the Work Group Development Stage Control Point 1 Submission is made by the Document Champion Sponsoring “Work Group” evaluates the Submission Submission is accepted as input in support of an approved project Committee Chair is notified in writing Control Point 2 Project is initiated by the Sponsor Chair Policies and Procedures are Established Document is “Registered” with Publications Manager Document number “V0.2.0” assigned (used for new document) Control Point 3 Development work complete, document is stable Voted for promotion by the “work group” sponsoring development Document number “0.3.0” assigned Control Point 4 Three weeks elapsed since Last Call “Work Group” Chair initiates ballot Successful ballot at “work group” level Document number “0.4.0” assigned Document Configuration Management transferred to the Publications Manager

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Rights and Privileges at the Group Level Representative of SDR Forum Member Organizations Non-Members Can hold leadership position YesNo Can participate in meetings and discussions YesYes, if invited by the group chair Can make input contributions YesNo Can voteYes, if meets eligibility requirements set by the chair No

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Coordination with Committee’s Chairs Committee Chair Initiates Ballot Committee Chair Reviews Comments Proposed Document submitted to Committee Chair Ballot Successful? Balloting (4 Weeks) If No, Document is returned to work group with comments Document Sent to SDR Forum Chair Committee Balloting and Approval Document Accepted? Review by Committee Chair

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Control Points in the Committee Balloting Stage Control Point 5 Accepted by Committee Chair Document number “0.5.0” assigned Control Point 6 Committee Balloting complete Document number “0.6.0” assigned (may not have 0’s if not a new document) Forum Chair notified that the document is ready for Plenary Ballot

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Forum Chair Reviews Comments Forum Chair Initiates Ballot Plenary Presentation Document Received by Forum Chair Ballot Successful? Balloting is Eligible Members Only, 1 Vote per Company Appeals go to the board of directors, who can advance the document to an approved state, reject the document, or return it to any control point within the process Document is Promoted to Approved SDR Forum Balloting and Approval Appeal??

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Control Points in the SDR Forum Balloting Stage Control Point 7 Plenary Presentation made 24 hours since Last Call Successful Plenary ballot Document number “1” assigned

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Plenary Approval Requires a “Quorum” Section 5.6 of the bylaws states: One-third (1/3) of the voting power of all members shall constitute a quorum for the transaction of business at any meeting of members.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Fast Track Process Allows Quick Turn Around on Time Critical Recommendations Committee Balloting And Approval (Minimum time unspecified) SDR Forum Board of Directors Balloting And Approval (Minimum time unspecified) Document Contributions Document returned to committee with comments

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Document Numbers Document numbers will be in the following format: SDRF-YY-C- NNNN-V.J.K.L SDRF - The letters SDRF, a designator that this is an SDRF document number. YY - Last two digits of the year of submission. C - Document Category Identifier I Input/Information documents R Recommendations H Historical documents P Reports S Specifications NNNN – Document serial number, a unique number for each year assigned by the Publications Manager V.J.K.L - The Version number. V = the letter V J = 0 until the document is first released (passes control point 7); after that, it is incremented each time is has been revised and that revision has been approved for release. K = the control point the document has passed L= incremented for each new draft at the current control point J, K, and L are separated by a decimal point (aka period). Each J, K, and L may be single or double digits.

Copyright © 2009 Software Defined Radio Forum, Inc. All Rights Reserved Where to find out more The document process can be found at: umentProcess.asp For more information, please see Lee Pucker or Al Margulies