Presentation is loading. Please wait.

Presentation is loading. Please wait.

11k London Closing Plenary

Similar presentations


Presentation on theme: "11k London Closing Plenary"— Presentation transcript:

1 11k London Closing Plenary
Date: Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE Working Group. If you have questions, contact the IEEE Patent Committee Administrator at

2 802.11k London Closing Plenary Report
Richard Paine

3 Meeting Objectives Whole London Meeting: LB90 Comment Resolution
Last Recirculation Letter Ballot

4 Meeting Objectives Met
Whole London Meeting: 100% LB90 (199) Comments Resolved Recirculation LB

5 Accomplishments Nov-Jan reevaluated carried-forward no voter comments
campaign to carried-forward no voters Resolved the last 21 comments of LB90 Produced D7.0

6 Objectives for Mar 2007 Objectives for May 2007
Recirculation Letter Ballot Comment Resolution Sponsor Ballot Objectives for May 2007 Sponsor Ballot Comment Resolution Recirculation Sponsor Ballot

7 Plans Plan until next meeting: Weekly Teleconferences on Thu noon Eastern Time starting on Plan for start of next meeting: LB95 Comment Resolution Next major milestone: Sponsor Ballot

8 Next Telecom Meeting: LB95 Comment Resolution

9 Radio Resource Measurement
LB90 Results Radio Resource Measurement 514: Voter Pool 354: Approve 36  : Do Not Approve 39  : Abstain Return Ratio: 84% This return ratio is valid if it exceeded the 50% acceptance level (514 Voters) Ballot Approval: 91 % With this result the balloted draft passed both the 75% approval level and the 50% return ratio acceptance level per the WG and 802 LMSC P&Ps.

10 WG Motion for Recirculation LB
Believing that comment responses in 06/1739r18 and the draft mentioned below satisfy WG rules for letter ballot recirculation, Authorize a 15-day LB recirculation of k draft 7.0. Movers: TGk: Ganesh/Kwak Result:5-0-0 WG: Result: x-x-x

11 WG Motion On behalf of the TG, move to request the IEEE Assigned Number Authority (ANA) to allocate numbers for the following Element IDs: Measurement Pilot Transmission information, BSS Available Admission Capacity, and BSS AC Access Delay. Movers: TGk: Levy/Hart Result: 8-0-1 WG: x/x Result: x-x-x


Download ppt "11k London Closing Plenary"

Similar presentations


Ads by Google