Idaho Load Rating Program

Slides:



Advertisements
Similar presentations
Local Agency Bridge (LABP) Program Overview Informational Presentation – January 7, 2011 Carol Olsen, ODOT LGS Bridge Program Manager Local.
Advertisements

Executive Summary Introduction In 1988, by virtue of State Statute , the Nebraska State Legislature first assigned the Nebraska Department.
Actions and Retrofit of Post Earthquake-Damaged Bridges
MDOT Load Rating Local Agency Workshop Training Bradley M. Wagner, PE Load Rating Program Manager.
Characteristics of Three Bridge Types
SOUTHEAST PBES/ABC REGIONAL PEER EXCHANGE ARKANSAS STATE HIGHWAY & TRANSPORTATION DEPARTMENT FEBRUARY 26,
LHTAC Overview of LPA in Idaho July 24, 2013 Local Public Administration.
Brenden K. Schaefer, P.E. Principal Bridge Engineer Wyoming Department of Transportation 2011 Virtis / Opis User Group Meeting August 2, 2011 Helena, MT.
Rating of Local Bridges for SHVs Using Virtis Software Virtis/Opis User Group Meeting August 3-4, 2010 Moises C. Dimaculangan, P.E. Minnesota Department.
Micheal J. Watters, P.E. Principal Bridge Engineer Wyoming Department of Transportation Virtis / Opis Users Group Meeting August 3, 2010.
Inspect t ech Structure Inventory and Inspection Management System.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION South Cascade Drive/Miller Road (Formerly Route 219)/ Cattaraugus Creek Design-Build Project (PIN ,
Impacts of “MAP-21”on the National Bridge Inspection Program Tribal Government Coordination Meeting Date August 7, 2014 Presented by: Gary Moss, P.E. Acting.
Design and Rating for Curved Steel I- and box-girder Bridge Structures
Module 15: Railway Structures
Virtis/Opis Technical Update Virtis Opis Bridgeware User Group 2011 Conference Helena, Montana 1.
Virtis-Opis Update Virtis-Opis User Group Training Meeting Helena – August 2011.
Shear Capacity of Composite Steel Girder at Simple Support Virtis/Opis User Group Conference Nashville, TN, August 3-4, 2010 George Huang, PhD, PE California.
Project Description: The Stonelick-Williams Corner Road Covered Bridge Rehabilitation project proposes improvements to the existing structure to preserve.
Manitoba Infrastructure and Transportation RADBUG - August 2014 Water Management and Structures.
I-5, Skagit River Bridge Collapse First Annual Missouri Bridge Conference April 9, 2015 Columbia, MO Jugesh Kapur, PE, SE.
Office of Highway Safety Bridge Load Rating Dan Walsh.
Office of Highway Safety Bridge Inspections Dan Walsh.
AASHTO Subcommittee on Construction
Design Standards For Local Agency Bridges Statewide Local Agency Project Delivery Conference May, 2006 Design Standards For Local Agency Bridges Statewide.
2013 Design Rating User Group Presentation Virginia Beach, Virginia August 8, 2013.
Overview of Bridge Inspections in Missouri David Koenig Bridge Management Engineer Missouri Department of Transportation Missouri Bridge Conference April.
1of 27 GUSSET PLATE EVALUATION Tom Macioce, P.E. Chief Bridge Engineer April 2009 PennDOT Load Rating of Gusset Plates.
LRFR vs. LFR Virtis Opis User Group Meeting, August 2, 2011
I. Truss Bridge Gussets Background
1 AASHTOWare Bridge Technical Update AASHTOWare Bridge Rating/Design User Group Training Meeting Traverse City – August 2014.
Virtis-Opis Beta Testing Todd S. Thompson, PE South Dakota DOT Office of Bridge Design August 3, 2011.
Superload Move April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Inspection Policies and Procedures INSPECTION POLICIES.
New Jersey Turnpike Next Generation Bridge Inspection Software
Bridge Design Implementation Jeff Olsen, PE – MT DOT AASHTOWare Bridge Task Force
C. C. Fu, Ph.D., P.E. The BEST Center
Design and Rating for Curved Steel I- and box-girder Bridge Structures
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Posting and Utilities Technical Standards Branch Class.
1 Virtis/Opis Technical Update Virtis Opis BRIDGEWare Users Group Meeting 2010 Nashville, Tennessee.
There are 2 Types of Bridge Inspectors – Class B and Class A.
BIM Bridge Inspection and Maintenance Technical Standards Branch Class B Bridge Inspection Course Bridge Inventory Information Technical Standards Branch.
Sign Structures Updates: Helpful Tips for Inspectors
Row No. Des # Sponsor Route Work Category Work Type Location County Des Length Federal Fund Type Phase Year Total Cost Federal Funds Non-Federal Funds.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
The Highway Fund – Planning, Measuring, and Reporting Mike Holder, PE, Chief Engineer 2015 CAPA / DOT Workshop February 24, 2015.
PORT OF TACOMA. Contract Increase & Award Pier 7 Structural Repairs Request authorization to expand the scope of existing A/E Contract No and.
1 PennDOT Truss Gusset Plate Analysis and Ratings Spreadsheet Overview Karim Naji Assistant Structural Engineer FHWA PA Division
FUNDING AVAILABILITY & SAFETY PROGRAMS 3//21/2013.
Approaches to Historic Bridge Rehabilitation Case Study #2
A Paper from the Transportation Research Record
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section Girls 1.
Inventory Information
Posting Bridges for Specialized Single-Unit Trucks
Introduction Signing for Interchanges Naming Convention
There are 2 Types of Bridge Inspectors – Class B and Class A.
Engineering Terms Bridge Unit.
Approaches to Historic Bridge Rehabilitation Case Study #3
City of Milwaukee Department of Public Works
SDDOT –Load Rating & Permitting
Risk Assessment Methodology
January 10th, 2018.
BRIDGE INVENTORY INFORMATION
Bridge Construction This is the week 5 PowerPoint presentation.
Introduction to Engineering Design
What’s new in Bridges ABCD March 2019
Historical Life Cycle Costs of Steel & Concrete Girder Bridges
BRIDGE INVENTORY INFORMATION
Replacement of Vehicle Bridge over Spring Creek
Presentation transcript:

Idaho Load Rating Program Shanon Murgoitio, P.E. Idaho Transportation Department Scott Wood, P.E. HDR Engineering

State of Idaho Population of 1.5 Million 48,180 Miles of Public Roads 4,130 Bridges 1,308 State System 2,346 Local System (cities, counties, etc.) 476 Other (Forest Service, other agencies) 9% are Structurally Deficient Average Age is 39 1,100 are over 50 yrs. old. Simply go over information. Highlight roughly 70% of bridges are local. Responsible for inspection and load rating, but little or no control over maintenance or use of structure. Challenge to get plans or get information on when work is planned to be done. Point out large state in size, and small in population

Idaho Bridges

What are Load Ratings Used For? Load posting decisions Issuance of overweight permits both annual and single trip Allowing overlays (extra weight) Rehabilitation vs. replacement decisions Quickly read though bullets. Highlight the importance of getting quality load ratings due to daily use of files to control overweight permit vehicles. On average 1500 overweight vehicles are analyzed by ITD bridge per year. We do have a screening process so not every overweight vehicle request requires a bridge analysis, but that screening process is based on the ratings for our Idaho Legal trucks.

Idaho Gets Serious About Load Rating! August 2007 - Minnesota Bridge Failure December 2007 – Load rating action plan developed per direction of the FHWA 1,039 bridges identified by FHWA to be load rated over the next 3 years (1/3 of inventory) 6 month milestones were set At this time, only one load rater at ITD that had very limited time to devote to load rating due to the growth of the number of overweight vehicle analysis required. Can’t hold up commerce! ITD suffering from lack of man power. Ready – Set – Go!

Why VIRTIS? Formally used BARS Rates multiple bridge types in one program One database Ability to migrate to updated versions

Develop a Plan / Evaluate Performance Plan to meet milestones Hire load rating consultants using Federal Bridge Program money (approx. $1 million/year) First milestone 7/1/08 (60 bridges) 60+ new load ratings complete New search of database shows 1056 bridges now need to be load rated Why did number increase? New bridges built but no load ratings done Inspectors identified new bridges as “re-analysis required” due to condition change Inherited bridges from local agencies Initially encouraged, but short lived once FHWA evaluation was done. Talk about around this time ITD sole load rater / overweight vehicle bridge analyst retires and position is unmanned for 6 months. As with many retirees, they are most appreciated once they leave. Two full time load raters were eventually hired and retiree was hired back as a consultant to do overweight vehicle bridge analysis.

Contracts Started with small contracts (<$250k) with consultants off prequalified list. Pros: Large resource pool Quick to get under contract Cons: Time consuming to manage so many contracts Consistency difficult to achieve between consultants Summer of 2010 put out a request for Statement of Qualification. Awarded contract to consultant team. Talk about how things are going well. Everyone has been working together for a couple of years now and is functioning as a team. Pooling resources and solving problems together.

Detective Work Check upcoming bridge replacement/rehabilitation projects. Provide detailed information to consultants during the contract scoping phase. Design Plans Shop Drawings Inspection Reports Inspection Photos Review design calculations if needed. (consultant) Site visit if needed. (ITD) Information is provided to consultant electronically via our ITD ftp site. Talk about how consultants expected to come look for design calculation if rating results are not reasonable. Microphise machine time consuming and difficult to use. Occasionally information we have for a bridge has a discrepancy that needs to be resolved by a site visit. Ask bridge inspector to swing when they can. If this is not possible may swap out bridge.

Examples of “Surprises” Bridge has been widened. No plans for old portion. Bridge appears prestressed concrete, but is actually precast concrete that was post tensioned at the site. Deck truss with top chord acting as bending member and truss member because deck rests directly on top chord. Structure rates low per current code, but is in good condition. Bridge is replaced very soon after it is load rated. Bridge has been set on fire. Emphasize that most “surprises” come from county bridges. Little control or knowledge about their work, especially if no state or federal money is involved. Tell story about Jim here and how more than one timber bridge has been set on fire by ditch burning.

Inspection Report Notes, “County should discuss ditch burning with irrigation district, continued burning under structure will quickly decrease life of the this structure.” Bridge 28317 Sheep Camp Rd. over Grandview Irrigation Canal

Local Highway District Homemade Girders

Scope of Work & Manhours Provided by ITD: Bridge list Drawings Inspection Reports Photos

Estimating Manhours Look through design plans and shop drawings Estimate hours based on bridge type, number of spans, geometry, additional features, etc. Estimate takes 3 to 4 minutes per bridge

Remote Offices & Subconsultants Boise, Portland, Spokane, Missoula, Denver, Mesquite, Nevada

Rating Computer Programs VIRTIS LEAP CONBOX MDX LARSA Microsoft Excel Mathcad

Bridge Types Rated in VIRTIS Prestressed Concrete Reinforced Concrete Post-tensioned Concrete Straight Steel Culverts or Stifflegs Trusses

ITD Load Ratings Typically rate the girders only Vertical loads only (DL & LL) No Site Visit No distress and/or deterioration effects included in rating Load ratings deteriorated by ITD Actual wearing surface LFD / LRFR

Idaho Live Loads Design Load (H-15, HS-20, HS-25, HL-93) ITD Type 3 (27 Tons) ITD Type 3S2 (39.50 Tons) ITD Type 3-3 (39.50 Tons) Idaho 121k “Superload” (ITD considering adding)

Checking

Rating Factor Verification Required when design load 0.9< R.F. < 1.5 Done for all controlling ratings Custom Spreadsheets or STLBRIDGE Original design calculations

Independent Senior Review Required in Contract “Another Check” Not Involved in Rating or Checking Verify Check Done and Backchecked Consistency

Deliverables Load Rating Summary Form Supporting Calculations (If Req’d) VIRTIS .xml File

Truss Bridge Ratings

Truss Bridge Ratings AASHTO Guide Specifications for Strength Design of Truss Bridges FHWA Load Rating Guidance and Examples For Bolted and Riveted Gusset Plates in Truss Bridges

ITD QA Processing Checklist Consistency Assisted by Vander Boegh Engineering

Look for Ways to Improve Require all new bridge designs to be accompanied by a load rating when submitted . Do more research during the contract scoping phase to prevent “surprises” during contract. Provide flexibility in contract to accommodate any “surprises” that may arise. Make sure Q/A and Q/C policies are well developed and strictly followed. At the completion of every contract have a brainstorming session on how to improve the next contract. Rework FHWA load rating plan. Now we have people to manage contracts. Promoting consistency and emphasizing quality was a big focus and a big job. Not many firms can do 300 load ratings in 6 months. Many firms were used and many of them utilized more than one office. Surprises came up and had to be dealt with. Revised load rating plan in November of 2009. Agreed to more overall bridges, but postponed some of the FHWA specifically identified ones.

Task Force Trivia Identify the members of the 1995 task force shown in photo. Gerry Gingras Vermont Yavous Gonulsen Illinois Dave Ekern Minnesota Kathleen Slinger Idaho Gale Barnhill Nebraska