Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting.

Slides:



Advertisements
Similar presentations
DOE O Changes and the CRS
Advertisements

1 Status of DOE Cleanup in Idaho Presentation to the “LINE Commission” By Rick Provencher Manager, DOE Idaho Operations Office April 7, 2012 Idaho Falls,
SECURITY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS IN THE UNITED STATES.
ACADs (08-006) Covered Keywords Byproduct material, source material, controller, custodian, ORM, sealed source, exempt source, special nuclear material.
Contractor Safety Management
BRC Storage & Distribution Safety and Quality Management System Training Guide
School for drafting regulations Nuclear Safety Decommissioning Vienna, 2-7 December 2012 Tea Bilic Zabric.
Safety  performance  cleanup  closure M E Environmental Management National Spent Nuclear Fuel Program Role in DOE’s Transformation Barb Beller, Project.
National Spent Nuclear Fuel Program Meeting April 14, 2009 Stephen O’Connor, Director Office of Packaging and Transportation.
Quality Management System
Quality control of raw materials In-process control
RESPONSIBLE CARE ® DISTRIBUTION CODE Daniel Roczniak Senior Director, Responsible Care American Chemistry Council June 2010.
EM - TRANSPORTATION. EM Office of Transportation - Organization & Responsibilities Basis of Organization & Responsibilities Basis of Organization & Responsibilities.
A SOUND INVESTMENT IN SUCCESSFUL VR OUTCOMES FINANCIAL MANAGEMENT FINANCIAL MANAGEMENT.
World Health Organization
Capabilities & Competencies An Introduction to EnergySolutions September 19, 2007 Scott Baskett Erik Vogeley.
Technical Meeting on Evaluation Methodology for Nuclear Power Infrastructure Development December, 2008 Nuclear Safety in Infrastructure Building.
Authorization and Inspection of Cyclotron Facilities Authorization for the Decommissioning of the Facility.
From Research Prototype to Production
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
TEAM 1 NONAMECOUNTRY 1SU RUI (LEADER)CHINA 2TENG IYU LIN (PRESENTER)MALAYSIA 3MUHAMMAD TARIQ AZIZ (RAPPORTEUR)PAKISTAN 4NORAISHAH PUNGUTMALAYSIA 5MOHAMMAD.
Waste Management Working Group CTMA Point Clear, AL W. T. (Sonny) Goldston EnergySolutions Working Group Chair July 6 - 9, 2015.
Transportation of Radioactive Material in the United States Earl P. Easton.
School for Drafting Regulations on Radiation Safety Vienna, November 2012 Rules and responsibilities of the regulatory body Jiří Veselý, SONS, Czech republic.
National Spent Nuclear Fuel Strategy Meeting April 15, 2009 Dawn Gillas Federal Program Manager Nuclear Material Programs Division DOE-SR SRS Spent Nuclear.
1 Idaho Cleanup Project Extension Work Transportation Accomplishments M. Shawn Tigue July 2015.
November 9, 2005 Thomas Hill, NSNFP DOE SNF Canister Planned Activities.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Inspection Part II.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.1 Steps in the Licensing Process Geoff Vaughan University.
International Atomic Energy Agency IX.4.4. Pre-disposal waste management Safety Standards.
OSU-CHS ALARA Statement The OSU-CHS radiation safety program will be conducted in such a manner so that exposure to faculty, staff, students, the public,
MODULE “PROJECT MANAGEMENT AND CONTROL” SAFETY ASSESSMENT DURING DECOMMISSIONING SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP ,
Programme Performance Criteria. Regulatory Authority Objectives To identify criteria against which the status of each element of the regulatory programme.
September TRTR Conference U.S. Domestic Reactor Conversion Programs Eric Woolstenhulme Dana Meyer.
NSNFP Technical Exchange Meeting Bethesda, MD April 14, 2005 Savannah River Site Spent Fuel Program Status.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Safety and Licensing of Spent Fuel Storage Facilities Vonna Ordaz, U.S. NRC Presented at International Conference on Management of Spent Fuel from Nuclear.
Licensing procedures for interim storage of spent fuel in Germany
MODULE “PREPARING AND MANAGEMENT OF DOCUMENTATION” SAFE DECOMMISSIONING OF NUCLEAR POWER PLANTS Project BG/04/B/F/PP , Programme “Leonardo da Vinci”
INL SNF PROGRAM presented to National Spent Nuclear Fuel Program Technical Exchange Meeting November 8 - 9, 2005 Washington, DC presented by R. O. Ramsey.
IAEA International Atomic Energy Agency School of Drafting Regulations – November 2014 Government and Regulatory Body Functions and Responsibilities IAEA.
1 ESTABLISHMENT OF REQUIREMENTS Module “DECOMMISSIONING PROCESS” Project BG/04/B/F/PP , Program “Leonardo da Vinci”
November 9, 2005 Thomas Hill, NSNFP DOE Spent Nuclear Fuel Licensing Path Forward PacTec Review of Transportation Strategy for DOE Fuel.
Developing a Data Base Supporting Very long- term Storage of Spent Nuclear Fuel R E Einziger, Ph.D., E. Benner, and C. Regan Spent Fuel Storage & Transportation.
International Atomic Energy Agency Roles and responsibilities for development of disposal facilities Phil Metcalf Workshop on Strategy and Methodologies.
Authorization Part III. Content of a license Structure of a license General elements General and specific conditions Annexes Documents attached (e.g.
International Atomic Energy Agency School for Drafting Regulations on Radiation Safety RER/9/096 Vienna, 3 May, 2010 Adriana Nicic, Regulatory Activities.
Andrew Griffith Office of Nuclear Energy, Science and Technology April 14, 2005 Andrew Griffith Office of Nuclear Energy, Science and Technology April.
 closure E M Environmental Management  cleanup  performance safety STRATEGY MEETING NATIONAL SPENT NUCLEAR FUEL PROGRAM Bringing Innovation to Spent.
 Before a company decides to close it’s power reactors the facility must be put in to a state that no longer has a residual radioactive level, clean.
Milestones for Nuclear Power Infrastructure Development Establishment of A Regulatory Framework Gustavo Caruso, Section Head, Regulatory Activities Section.
HPT Rev. 0 Page 1 of 28 TP-1 TVAN Technical Training Health Physics (RADCON) Initial Training Program Radioactive Materials Handling and Accountability.
Update to National Governors’ Association Patty Bubar Associate Deputy Assistant Secretary Office of Integration and Disposition May 16, 2002.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Duties of the Resident Inspectors at the Texas Low- Level Radioactive Waste Disposal Facility in Andrews County Diane Wakefield, Health Physicist, Resident.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Program Performance Criteria.
By Annick Carnino (former Director of IAEA Division of Nuclear Installations Safety) PIME, February , 2012.
On-site Storage of Spent Nuclear Fuel in the United States
Transportation of Radioactive Material in the United States
IRB reporting updates.
Safety and Security of Radiation Sources
Flooding Walkdown Guidance
NRC’s LLW Regulatory Program: Update of Emerging Issues
NRC Cyber Security Regulatory Overview
Waste Disposal / Zero Waste to Landfill
October 23, 2015 LLW Forum Meeting Chicago, IL Melanie Wong,
Joint WG on Guidance for an Integrated Transport and Storage Safety Case for Dual Purpose Casks TM TM to Produce Consolidated Drafts of the IAEA’s.
Decommissioning Rulemaking
Research and Test Reactor Decommissioning Inspections
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Idaho Cleanup Project _____________________ ICP Spent Nuclear Fuel Examination Barbara Beller for Kathleen Hain, PBS-12 FPD April 15, NSNFP Strategy Meeting

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 2 History of SNF Examination 1998 EM-60 memo to INL and SRS directed use of technically based criteria for receipt of FRR SNF. –EM had little experience receiving FRR SNF. –Criteria were based on National Spent Nuclear Fuel Program, Foreign Research Reactor Fuel Acceptance Criteria – Failed Fuel Report. Material control and accountability compliance requires verification of unique identifier for each SNF element. ICP cannot readily handle individual fuel elements to examine SNF at receiving/storage facility (CPP-603). ICP completes physical fuel examination at pre-loading and “accountability” at loading for both FRR and DRR SNF (2 trips). Tamper indicating device fixed, removed at receipt, buckets unloaded from cask. SNF identified as posing a potential risk to the receipt facility (at unloading or in the future i.e. 2035) is canned prior to loading.

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 3 Receipt Facility Considerations Leading to Examination Review of receipt of specific fuel against documented safety basis for fuel handling and storage at receipt facility. Evaluation of impact of (degraded) spent fuel condition on handling and interim storage at receipt facility. Planning and scheduling for fuel cask unloading, and handling for storage placement at receipt facility. Evaluation of monitoring of fuel under fuel management program for interim storage at receipt facility. Additional planning, as appropriate, for preparing fuel for ultimate disposition post-interim storage. –Source Document: Foreign Research Reactor Spent Fuel Return Program U.S. DOE Experience in Planning, Receipt and Transportation A Review and Lessons Learned October, 2008

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 4 Elements of SNF Examination for Dry Storage by ICP Contractor ICP contractor is responsible for operation of CPP-603 within the approved nuclear safety authorization basis. Required Shippers Data review and approval required. Each SNF element is videotaped and written record of the visual inspection is completed (length, instrumentation, unusual attachments, as well as any damage). The unique fuel identifier is verified in addition to verification completed by the reactor site fuel handlers; tied to the fuel fabrication data. Any questions necessary for authorization basis compliance calculations are asked. (Any unexpected condition e.g. hose clamp.) Decision is made on which elements will require canning based on storage requirements at receipt facility. Coordinate with shipper concerning fuel position in basket.

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 5 Damaged or Compromised Spent Nuclear Fuel (SNF) Normal reactor operations and fuel handling can result in damage to SNF that may cause a release of radioactive contamination or fuel handling issues at receipt facility in the future. ICP has documented damage to the aluminum and stainless steel clad TRIGA and SNF received from Foreign Research Reactors (FRR) since 1997 and Domestic Research Reactors (DRR) since 2003: –Corrosion, cuts, bulges, dents, scratches In addition, ICP requires canning of damaged SNF to prevent contamination of storage facilities, exposure to current and future workers and control during future characterization and packaging processes. On-site visual examination with the use of cameras is the method used to identify SNF that should be canned (360°, full length).

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 6 Gouge/Cut

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 7 Damage/ Gouge

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 8 Crack near Bottom of SST Element

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 9 “Bulge” Dropped? (Al)

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 10 Corrosion Suspect Dissimilar Metals of Weld Procedure (SST)

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 11 Cut /Corrosion (Al)

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 12 Dent/Corrosion/Pit (SST)

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 13 Early At Reactor Examination Pros Condition of SNF is known early enough to address any concerns. Loading issues can be resolved. –SNF is received in CPP-603 in a shipping basket and stored in the basket. –SNF is not handled again until the basket is transferred to the future Idaho Spent Fuel Facility (TBD). Special equipment can be identified. Authorization basis issues can be resolved; SAR changes made and approved. Receipt procedures can be written to account for and issues unique to this shipment. Sufficient cans can be provided. Coordination with shipper.

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 14 Early At Reactor Examination Cons Expense –EM cost of travel to reactor and time at reactor. –Reactor cost to handle SNF for examination; may be paid by NE/NNSA. –Much of the work appears to be redundant. Contract interference –NE/NNSA contracts with reactor and shipper, remember Roles and Responsibility –EM contract with receiver Political –Examination can be perceived as questioning nuclear regulation compliance

Idaho Cleanup Project U.S. Department of Energy Idaho Operations Office 15 New SNF Receipt Issue Regulatory Requirements and framework for fuel manufacturing, reactor operation and fuel storage. Documentation requirements are established – can data available fulfill our data needs? Is the paperwork available a “record” prepared under an acceptable QA program? Are the data needs different for and dependent on fuel disposition path (recycling or disposal)? References: 1) NRC Division of Spent Fuel Storage and Transportation, Interim Staff Guidance - 1, Revision 2 Classifying the Condition of Spent Nuclear Fuel for Interim Storage and Transportation Based on Function 2) IAEA-TECDOC ) FRR Spent Fuel Return Program Lessons Learned October 2008