Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01

Slides:



Advertisements
Similar presentations
RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
Advertisements

RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
How to apply a TXV kit to an evaporator coil – Initial installation
Instructions for making plunger fork tool. Drawing for the trigger assembly.
H.E. Anderson Company Maintenance Tip How to Replace a Chemical Side Diaphragm This presentation will show you how to change a chemical side diaphragm.
Manual Flo-tap Installation Instructions
Compression Fittings Internal nut type. Compression fittings Rugged and durable. Firm joint using all brass construction For use with plastic and metal.
Servicing Welch DRYFAST ULTRA Pump Models 2032
Waukesha Cherry-Burrell
Service Training PV Series 42 PVplus
Metering Pump Spare Parts Replacement. Pump Components (Metering Pump) Pumps are supplied with a 120VAC or 240VAC power cord. Use care to ensure pump.
AS100 Installation Air Tight Solutions The only solution AS100 Valve Stem Adapter Small O-ringLarge O-ring Standard Brass Valve Stem If you purchased your.
ZIPP 404 BEARING REPLACMENT GUIDE Tools Needed:
A Manual for Repair and Maintenance Technicians 1ST STAGE.
Pneumo Kit Manufacturing Instructions for assembling the pneumatics workshop kits Questions? Contact Will Durfee, Version:
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
RPDA 4A 2½” – 6”. Modification Overview  Production of the RPDA 4A series began in  The RPDA 4A can utilize either a Type I or Type II bypass.
Print Head Removal, Replacement and Alignment. Page 2 CONFIDENTIAL Print Head Assembly Removal  Turn off printer A.C. power  Unplug the printer from.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
Air tank installation instructions Included parts: Raw aluminum air tank bracket 5/16-18 button head bolts (qty 4) M8x1.25 button head bolts (qty 4) M8.
860 21/2”-10”. Modification Overview  Production of the 2½” – 10 sizes began in  Lead free version (LF860) was introduced in Parts do not.
Cleaning of the Optical Block, Critical Orifice, and Focusing Nozzle of the Brechtel Model 1710 Mixing CPC.
Gear Drive Flo-tap Installation Instructions Quick Installation Guides: rev. EA – 485 Flanged Flo-tap rev. DB – 485 Threaded.
994 RPDA 21/2”- 6”. Modification Overview  Production of the 994RPDA began in 1999 and is current.  The 994 RPDA currently utilizes the ¾” 009M3 for.
External nut type series 43
350, 350A 2½”-12”. Modification Overview  Production of the 2½ - 10” sizes began in  Production of the “A” models began in This Indicates.
Pneufit push-in fittings For general purpose pneumatic applications.
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
994 2½ ”- 10”. Modification Overview  Production for the 994 began in 1999 and is current.
825Y(YA) 3/4”-2”. Modification Overview  Production of the 825Y began in 1978 and is current.  The 825YR ( ) had replaceable check seats. **
375AST 21/2”-10”. Modification Overview  The stainless steel (ST) series was introduced in  This version has a stainless steel body. ***(Parts.
475, 475V 2½”-3”. Modification Overview  Production of the 2½ - 3” sizes began in  The lead free version (XL) was introduced in 2011.
LAB #9 Valve Head replacement. Insert the valve. Make sure that the cap goes on the intake valve. Insert the springs. Insert the keeper.
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”. Modification Overview  Production began in 2002 and is current.  Early versions used a ¾” Flomatic RPZE for.
LF866 2½”-10”. Product Overview  Production of the 2½” – 10” sizes began in  The LF866 utilizes a Type 2 bypass (Model LF619 single check).
Model 12 Intek Horizontal OHV
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
375, 375XL 1¼” -2”. Modification Overview  Production of the 1¼” -2” 375 began in 2004 and is current.  The lead free version 375XL was introduced in.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
Rapid Change Technology The following is a presentation to aid Technicians in the replacement of the Rapid Change Technology Block.
Ferrari Testarossa 1987 OS Giken Clutch Replacement Document Version
Annex 4 - Moving Frame and Whiffletree assembly
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Assembly Instructions:
Bilge Pump Service Project Model Service Kit
475, 475V, 475XL 4”-10”.
826YD 21/2”-10”.
Fasteners.
RPDA 4AN 21/2” – 6”.
Most Effective Procedures to Repair a Brake Booster.
¾”-2”.
Disassembly and Assembly of A900C-W Electronic Governor Actuator for P8 Fuel Injection Pump
957RPDA, 957N RPDA, 957Z RPDA 21/2”-10”.
M500, M500N, M500Z 21/2”-10”.
909 21/2”-10”.
880V 21/2”-10”.
975 2½”-10”.
C400, C400N, C400Z 21/2”-10”.
4000CIV 21/2”-10”.
375DA 2½”-10”.
Educational Power Point by D&T Within Schools
M400, M400N, M400Z 21/2”-10”.
Thank You For Purchasing Coeur Designs 11” Shower Extension
450DA 4”-10”.
909 RPDA 21/2”-10”.
Presentation transcript:

Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01 Model 2052/2054

Kit for cat. no. 2052B-01 and 2054B-01 (4 head pumps) Kit part no. 402042-US

1. Loosen four bolts using 4 mm Allen Wrench (Although the photo shows a 2 head pump, a the procedure for a 4 head pump (Model 2052/2054) is the same.

2. Remove connection head and remove two valves and two o-rings

3. Remove pump head to expose diaphragm

6. Using spanner(part no 826801-16) to loosen PTFE coated diaphragm holding plate(tightening washer) and do final loosening by hand to remove diaphragm and washer

7. Upon removal of: - diaphragm support plate (pressure washer), - diaphragm and - diaphragm holding plate (tightening washer) the connecting rod becomes visible

4. Assembly together diaphragm support plate(pressure washer), new diaphragm and tightening washer (diaphragm holding plate)

10. Apply Loctite 242 To thread

5. Use spanner to diaphragm holding plate(tighten washer). Make snug 5. Use spanner to diaphragm holding plate(tighten washer). Make snug. Alert! - Allow 3 Hrs for loctite 242 to set before turning on pump.

6. Intake Stage. Place PEEK valves on plates as indicated with “shiny” side of valves facing down. Alert – important to have “shiny” side DOWN to reach vacuum level. Align pin and hole when assembling

7. Repeat steps 2 thru 6 on the Exhaust Stage of pump 7. Repeat steps 2 thru 6 on the Exhaust Stage of pump. Place PEEK valves on plates as indicated with “shiny” side of valve facing down. Alert – important to have “shiny” side DOWN to reach vacuum level. Align hole & pin when assembling

8. Pick-up valve plate and head and place over diaphragm

9. Insert teflon tubing into fitting on head and hand tighten plastic compression nut. Thread 4 bolts to secure heads. Snug tight the 4 bolts. Snug tight the plastic compression nut with 14 mm wrench.