Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005.

Slides:



Advertisements
Similar presentations
Project Management.
Advertisements

FCMAT Response & Preparation: Process Outline October 25, 2006.
PROCESS FRAMEWORK Lecture - 3. Topics covered PROCESS FRAMEWORK PROCESS MODELS DIFFERENCE.
© 2007 AT&T Knowledge Ventures. All rights reserved. AT&T and the AT&T logo are trademarks of AT&T Knowledge Ventures. Interactive Solutions & Design Group.
Trnsport Test Suite Project Tony Compton, Texas DOT Charles Engelke, Info Tech.
HP Quality Center Overview.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
<<replace with Customer Logo>>
Metrics for Process and Projects
Migration MIGR-02. David Cervelli Managing Consultant Strategic Systems Group (SSG) June 2007 Preparing for an Implementation.
GAI Proprietary Information
Stepan Potiyenko ISS Sr.SW Developer.
Improving Process for Better Software. Who We Are An experiential learning program that provides technology solutions for our partners, and real- world.
IS 214 Needs Assessment and Evaluation of Information Systems Managing Usability © Copyright 2001 Kevin McBride.
1 of 2 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Copyright  Larry Dribin, Ph.D. SE470_EngFlows_v1.ppt SE470 EngFlows - 1 Excellence in Software Engineering Repeatable Level Defined Level Manage.
Effort in hours Duration Over Weeks Or Months Inception Launch Web Lifecycle Methodology Maintenance Phases Copyright Wonderlane Studios.
Software Engineering Institute Capability Maturity Model (CMM)
Change Request Management
About Waterloo website Project report June Outline Overview of process Project deliverables Lessons learned.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) October 6, 2007.
TUG, AASHTO, TTF Primer Class Tim Lindberg (TTF Member from South Carolina) November 6, 2005.
Working with Info Tech, Inc. Teresa Franklin Trnsport Product Manager November 6, 2005 A Primer for Trnsport Users.
Release & Deployment ITIL Version 3
INDOT’s Scheduling / Project Management System (SPMS) Vision & Objectives for Next Generation SPMS Mike Jenkins, Indiana DOT Teresa Franklin, Info Tech,
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
Acquisitions, a Publisher’s Perspective Craig Duncan Development Manager External Development Studio Building the partnership between.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Web Development Process Description
International Business and Technology Consultants AMS confidential & proprietary SPS Help Desk Presentation Army User’s Conference June 2002.
The Key Process Areas for Level 2: Repeatable Ralph Covington David Wang.
Design Completion A Major Milestone System is Presented to Users and Management for Approval.
Roles and Responsibilities
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Page 1 MODEL TEST in the small GENERALIZE PROGRAM PROCESS allocated maintenance changes management documents initial requirement project infrastructure.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 26, 2006.
Understand Application Lifecycle Management
Keys to Successful Beta Testing Presented by Ron Dinwiddie, Product Director, Blackboard Commerce Suite™ Jessica Finnefrock, Product Director, Blackboard.
Team Members David Haas Yun Tang Robert Njoroge Tom Kerwin Clients Facilities Management Don Anderson Rick Klein.
Project Management Workshop Overview By Tarek Lahdhiri Region 4 PACE Chair IEEE Region 4 Meeting January 30/31, 2004.
SacProNet An Overview of Project Management Techniques.
CHECKPOINTS OF THE PROCESS Three sequences of project checkpoints are used to synchronize stakeholder expectations throughout the lifecycle: 1)Major milestones,
Georgia Institute of Technology CS 4320 Fall 2003.
TESTING LEVELS Unit Testing Integration Testing System Testing Acceptance Testing.
Quick Recap Monitoring and Controlling. Lesson 11: Monitoring and Controlling Project Work Topic 11A: Identify the Monitor and Control Project Work Process.
1 Local Readiness Team Lead Meeting June 6, 2007.
Cloverleaf and TeamTrack Teresa Franklin Trnsport Product Manager October 9, 2007.
Next Generation Trnsport Current Development Update Presented by Ian Baldwin, Info Tech, Inc. October 2006.
Trnsport Test Suite Status Presented to the AASHTOWare Trnsport IT TAG October 12, 2004.
ITC Software ITC FUNCTIONAL TESTING SERVICES.
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts Rational Unified Process Fundamentals Module 4: Core Workflows II - Concepts.
Gatekeeper Plan features that support person-centered planning.
Next Generation Trnsport Impact Assessment Sub-project Jim Johnson, Florida DOT and Pamela Barry, Info Tech, Inc.
Quality Assurance at CMM Level 2 Copyright, 2000 © Jerzy R. Nawrocki Requirements.
1 CP586 © Peter Lo 2003 Multimedia Communication Multimedia Development Team.
© 2013 Gartner, Inc. and/or its affiliates. All rights reserved. Gartner is a registered trademark of Gartner, Inc. or its affiliates. The Value Review.
Process 4 Hours.
Phase II, The Pilot Area Kick-off
Roles and Responsibilities
Software Project Configuration Management
Project Management Lifecycle Phases
Engineering Processes
System Construction and Implementation
Engineering Processes
Overview Activities from additional UP disciplines are needed to bring a system into being Implementation Testing Deployment Configuration and change management.
Speaker’s Name, SAP Month 00, 2017
Presentation transcript:

Beta Testing: The Contractor’s Perspective Trns·port User Group Meeting October 2005

Overview What is beta testing? User participation Testing standards Beta objectives Roles and responsibilities Beta support Benefits Success factors

What is Beta Testing? Product testing and assessment that is performed by real users in real environments and using real data prior to production release. Beta testing is required by AASHTOWare ® standards for all new development, unless exception is granted.

User Participation Customer input into a product is critical to building a quality system. Beta testing provides opportunity for testing in the user environment with real user data and user scenarios.

Testing Standards Unit Testing: Informal unit tests by the programmers Build Testing: Combine and test the aggregated units System Testing: Test software as a whole Alpha Testing: Contractor tries to break the product, validate against requirements, review documentation Beta Testing: Licensees use the product as a production application with real data Acceptance Testing: meet the final requirements

Beta Objectives Validate software functionality and installation in real environments Test according to agency work flows Test with high volume of data Uncover defects and assess overall quality Prepare production-ready software

Key Roles Task Force (TTF) – Oversight of all software testing phases. Approves beta test completion. Technical Review Team (TRT) – Oversight of beta progress. Guidance on issue resolution. Led by a Task Force member. Beta Sites – Conduct testing according to test plan and agency workflows. Test specific releases and platforms. End User Designee signs off at beta end. Contractor – Provides software, documentation, test plans and beta support. Resolves issues and delivers production software.

Contractor’s Responsibilities Provide installation support, on-site if needed Provide remote support Deliver software updates during the beta period, if needed Resolve all reported defects Report status to the TRT and TTF Finalize production software

Beta Site’s Responsibilities Schedule beta resources and assign test leads Establish test environment Conduct testing according to test plans Conduct testing of agency workflows Report defects to contractor Report final test results to the TRT and TTF

Beta Plan Document Beta schedule Beta release plan –Software –Test plans, data, test cases –Documentation Beta support process –Issue reporting and tracking – Collaboration site Acceptance Process

Beta Progress Flow

Beta Support Tools Project collaboration space (Groove) – Meeting agendas –Project artifacts –Prototypes and test plans Issue reporting and Tracking –Simple web forms –TeamTrack ® – a future standard Other collaboration tools –Preview web sites –List Serves and Beta Test Results Form

Groove collaboration tool is used on most projects

Beta reporting web page

TeamTrack tool will standardize beta issue reporting

Benefits of Beta Testing Validation of requirements in user environments Early detection of defects User participation and ownership Early installation and configuration Close collaboration with the TRT and project team Reduction in warranty, maintenance, and support

Success Factors Participation of agencies with the right Trnsport platforms and module versions in production Beta readiness and completion of testing Adequate duration of beta test Multiple beta participants High level of communication Effective collaboration tools

Questions ? Questions ?