A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning.

Slides:



Advertisements
Similar presentations
TRP Chapter Chapter 6.8 Site selection for hazardous waste treatment facilities.
Advertisements

PUBLIC MEETING May 12, 2011 P U B L I C I N V O L V E M E N T Project Status PHASE III Construction PHASE II Contract Plan Preparation & Land Acquisition.
Utility As-Built Information Value Awareness
Interim Guidance on the Application of Travel and Land Use Forecasting in NEPA Statewide Travel Demand Modeling Committee October 14, 2010.
080820_v1DP TRAVEL MANAGEMENT - PROCESS ON THE GILA NATIONAL FOREST.
ENFORCING LAKESHORE PROTECTION ORDINANCES IN A REGULATION- ADVERSE ENVIRONMENT.
Gateway National Recreation Area Jamaica Bay Transportation Studies at Floyd Bennett Field, Jacob Riis Park, Riis Landing, and the Former Pennsylvania.
Missouri Department of Transportation US Fish and Wildlife Service Squaw Creek National Wildlife Refuge Habitat Restoration Breakout Session Shannon Kusilek,
Context Sensitive Solutions Idaho Case Studies ITD Project Development Conference April 7, 2005 Dick Jacobson, P.E. Senior Project Manager CH2M HILL.
If we don’t use the Quantm system we won’t get the best alignments Queensland Department of Main Roads, Australia.
 Meeting Administration and Objectives  The Partnership  Understanding the Study Area  What We Heard  Alternatives to be Evaluated  Participant.
New I-65 Interchange at Worthsville Road Welcome!.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
Environmental Assessment Public Meeting
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
Trimble  Quantm  Haul Road Optimization Presenters Name.
EPA Region 6 GIS Screening Tool for Environmental Assessment (GISST) Sharon L. Osowski, Ph.D. Ecologist EPA Region 6.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
Consulting Trends and the Design Process. Fundamental activities conducted by consulting firms Winning work Doing work Managing work Managing business.
I n t e g r a t I n g C S S Practitioner Module 6 1 Module 6: CSS and Livability in Construction, and Maintenance.
I n t e g r a t I n g C S S Practitioner Module 4 1 Module 4: CSS in Corridor and Sub-area Planning.
Location Surveys I. Traditional Highway Location: 1. field-oriented work 2. *Procedures 1) The first step: Reconnaissance of the area using available topographic.
Practical Design in ODOT Roadway Conference April 13, 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
Planning for Travel and Transportation Management National Training Center Course # Unit Two Planning Processes.
Building Strong! 1 US Army Corps of Engineers Regulatory Program Kimberly McLaughlin Program Manager Headquarters Operations and Regulatory Community of.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Project Scoping Fundamentals Alan Lively Project Delivery Specialist Local Government Section April 6, 2010.
1 Context Sensitive Solutions For Designing Urban Thoroughfares Brian Bochner Senior Research Engineer Texas Transportation Institute Brian Bochner Senior.
1 Context Sensitive Design CE 453 Highway Design Iowa State University Howard R. Green Company.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
ENVIRONMENTAL OPPORTUNITIES AND CONSTRAINTS ARCHAEOLOGICAL - HISTORICAL INVESTIGATIONS PERMITTING FOR UNAVOIDABLE ENVIRONMENTAL IMPACT AREA ENDANGERED.
Escanaba to Hermansville Rail-Trail Forest Management Division
Secondary & Cumulative Effects Analysis Training Program Maryland State Highway Administration’s Secondary and Cumulative Effects Analysis Guidelines For.
1 Dr. Ralph R. Young Director of Software Engineering PRC, Inc. (703) DOORS USER GROUP CONFERENCE Reston, VA September 17,
1 C E T A S Triage Presentation, Date Project Name Project location (city, county) ODOT Key Number:
Technology New York State Learning Standards for Grades 7 & 8.
HIGHWAY DEPARTMENT Tim G. Schulte, P.E. Richland County Engineer.
Geospatial & Applied Technologies NEPA & Preliminary Engineering Processes working seamlessly together using web-enabled GIS GIS in Transit.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Flood Risk Management Cosgrove Creek Section 205 Planning Basics.
Phase I Engineering and Environmental Studies Project Development Flowchart US Route 45; IL Route 132 to IL Route 173 and Millburn Bypass CSS
Why Practical Design…Why NOW… 1 Practical Design in ODOT (Tab 2) ? Training ? 2010 Cathy Nelson, PE Technical Services Manager/ Chief Engineer.
East Coast Greenway Connecting Urban Centers, Train Stations and Greenways in Northern Delaware Delaware Trail Summit - February 25, 2010 On the Map: Regional.
Starter: Look at the photograph. This is the site for a proposed coal mine, providing essential fuel for the community. In pairs: Discuss whether you think.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
GIS & Quantm 2005 Statewide GIS Conference March 10, 2005.
REMOTE SENSING and the CSX RAIL RELOCATION EIS NCRST-E GICAP 2002 Workshop Session 3.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
24 August 2007 EDR Effort 1 CF&S Environmental Process for an Americas Regional Effort EDR Planning Jerry Aarons & Rod Walton.
Context Sensitive Solutions Focus Group Session Lynn Purnell Parsons Brinckerhoff Prosperity Church Road Corridor December 8, 2005.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
TRANSPORTATION ALTERNATIVES PROGRAM 2016 Project Scoring Update Workshop.
In the ideal world… Transportation planning addresses NEPA principles. Collaboration/involvement starts in transportation planning. Planning leads to early.
U.S. 20 Intersection Improvement Project at Waverly Road Porter Town Hall Thursday, August 13, 2015.
Geometric Design: General Concept CE331 Transportation Engineering.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Introductions Army Corps of Engineers Metro Parks Mayor’s Office HDR Engineering, Inc.
STAFF’S FINDINGS OF INCONSISTENCY Section 30233(a) Wetland Fill Staff’s basis for denial centers on the determination if the project meets the incidental.
Iron Range Tourism Bureau April 25, 2013 Hwy 53 Update.
PAC Meeting July 2, Agenda  Introductions and thanks  Project to date  Next steps  Questions.
Siting Updates and the CEQ Meeting March 18, 2013 Linda Davis Western Governors’ Association.
CONTEXT-SENSITIVE DESIGN 2002 Texas Department of Transportation Design Conference.
Performance (function)-based Decision Making
Draft Transportation Element September 6, 2017
Transportation Task Force Mission and Vision
S.R. 26 Road Rehabilitation in Clinton County
I-85 Corridor Light Rail Transit Feasibility Study
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
Presentation transcript:

A Highway Corridor Planning Process for NEPA Compliance Using Quantm Goose Creek Canyon Bypass Case Study A Unique Approach to Corridor Planning

Co-Authors – Dale Anderson, Karen Comings, Trevor Howard – Entranco, Inc. Len Bettess – Quantm, Inc. Jason Brinkman - ITD Acknowledgements

What are our presentation objectives? n Discuss challenges – Highway Corridor Planning for NEPA Compliance n n Present unique approach using Quantm and GIS n n Describe solutions n n Provide model for future NEPA work

What is purpose of Bypass? n n Construct safe, economical, and environmentally acceptable highway around Goose Creek Canyon. n n Why? – –Narrow 22-foot wide roadway – –Steep 7 percent grades – –Shaded areas - frequent icing – –Poor curvature, low driving speeds, – –Inadequate passing opportunities.

What is the Highway Environmental Process?

What are challenges of the Highway Environmental Process? Previously studied highway alternatives Previously studied highway alternatives Evaluate the existing highway upgrade comparably to new highway alternatives Evaluate the existing highway upgrade comparably to new highway alternatives Consider other highway alternatives with dollar and time limitations Consider other highway alternatives with dollar and time limitations

What are challenges of the Highway Environmental Process? Gain the trust and confidence of the citizens and resource agencies Gain the trust and confidence of the citizens and resource agencies Obtain concurrence on highway alternatives screening Obtain concurrence on highway alternatives screening n Agree on how much data is enough to make a screening decision

What is Quantm? n Provides a highway planning, computer-based optimization tool n Helps locate highway alternatives n Meets pre-determined engineering & environmental criteria n Staff training and support

Highway profile – cut and fills

Engineering criteria defined within the Quantm system

Quantities and Costs for Alternatives

How was Quantm Applied to the Goose Creek Project? n Develop GIS data base – Linear Features - Roads, Railroads, Utility Network (power lines and power transfer stations), Streams, Nordic and Snowmobile Trails – Special Zones - Wetlands, Lakes, northern Idaho ground squirrel habitat (surveys from the recovery team field work), bald eagle habitat, cultural areas, public land, 4(f) recreational property and historic property, private land, and land use – Additional Data - Geologic Zones

Baseline highway alternatives – no environmental constraints

Avoidance of environmental constraints

Changing roadway design – 2 to 3 lanes

Establishing highway corridors – Quantm generates array of alternatives

Establishing highway corridors – variable width corridor for detailed environmental inventory

How did our approach address challenges? Previously studied highway alternatives? Imported into Quantm – compared on equal basis for engineering and environmental Previously studied highway alternatives? Imported into Quantm – compared on equal basis for engineering and environmental Evaluate the existing highway upgrade? – Optimization for canyon route – not cost effective to meet design standards Evaluate the existing highway upgrade? – Optimization for canyon route – not cost effective to meet design standards Other alternatives with dollar and time limitations? Used existing GIS data, established design criteria, looked at new alignment within days Other alternatives with dollar and time limitations? Used existing GIS data, established design criteria, looked at new alignment within days

How did our approach address challenges? Gain the trust and confidence of the citizens and resource agencies? Timely results for skeptical stakeholders – objective – costs and environmental impacts Gain the trust and confidence of the citizens and resource agencies? Timely results for skeptical stakeholders – objective – costs and environmental impacts Obtain concurrence on screening? Collaborate with stakeholders through workshops – demonstrate Quantm attributes – work through alternatives together Obtain concurrence on screening? Collaborate with stakeholders through workshops – demonstrate Quantm attributes – work through alternatives together n How much data is enough to make a screening decision? Agree on data needs for screening and corridor inventories – maintain flexibility – provide clear documentation

Where should we go from here? n Established highway corridor planning / environmental / engineering process n Establish highway corridors n Selects alternatives n Complies with NEPA n Addresses challenges – objective, cost- effective – quicker n We believe – it is worth repeating in Idaho