THE REACTIVE STREAM STABILIZATION (RS2) RESEARCH Knowledge by Dr. Chester Watson, Dr. David Biedenharn, & Dr. Ken Carlson. Drawings by Dave Derrick.
1 Hurunui River Dissolved Reactive Phosphorus Concentrations and Loads A tool to manage periphyton growth ? Review of Ecan & NIWA Dataset of DRP measurements.
Soil-choked Riprap covered with Erosion Control Blanket (ECB), & planted with native trees & shrubs through the ECB.
DINGMANS CREEK RIGHT BANK RIPARIAN VEGETATION PLANTINGS, WITH SOME SOIL CHOKE & PLANTING OF EXISTING Rt. 209 DELAWARE WATER GAP NATIONAL RECREATION.
Landscape Pitfalls Myths, Mistakes, and Misconceptions.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
Help your local watershed By creating a rain garden Presented by OOB/Saco Alternative Education.
Wetlands for Acid Mine and Livestock Drainage Treatment By: Gabe Jenkins April 18 th 2005.
BUSTING MYTHS. BUSTING MYTHS ADVENTITIOUS ROOTING PLANTS CANNOT BE PLANTED DEEP Onondaga Nichol Road Bridge, Lafayette, NY.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
Estimating Site work. Major Components Erosion & Sediment Control Fencing Clearing and grubbing Excavation Backfill Grading Trucking.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
BUILDING YOUR RAIN GARDEN. Garden Location Where does water flow from? Where does water travel or collect? Observe your yard during a rainfall event.
What’s a “Basin”? A depression that holds water A bird bath What holds the water of Lake Michigan What contains the water of an ephemeral pond Does it.
Changes in Spoil Electrical Conductivity (EC) and Sodium Adsorption Ratio (SAR) Following Irrigation at a Mine Site in Northwestern New Mexico Steven Perkins,
Temperature of Stream Site (upstream to downstream) Temperature ( °C )Average ( °C ) °C °C °C °C °C °C According to.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
TRADITIONAL WINDROW & TRENCH-FILL REVETMENTS, & A NEW INVENTION, VEGETATED TRENCH-FILL REVETMENT {All 3 are classified as “Setback Revetments”}
SITE 6 – DELAWARE RIVER RIGHT BANK BLOW-OUT UP THE HILL FROM THE DELAWARE RIVER (SWIRLING RIVER EROSION & GROUNDWATER PIPING) DELAWARE WATER GAP NATIONAL.
BEE–WARE OF THE BEES-ELTON 7 BRIDGE Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007.
A Case Study of Loch Vale Watershed (LVWS): Exploring Scientific Process Using Excel, Field Studies and Internet Research AP Environmental Science Class,
GOODWIN MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 - MAR 2, 2007 The final design was based on the landowner’s required stream and.
OSBORNE HOLLOW CREEK ROAD PROTECTION PROJECT. Gravel-Cobble Bed Stream – Rural, Pool-Riffle-Pool, Stream Slope 2-3% Goals: Halt bank erosion to protect.
The Slit Brush Layering Method. THIS METHOD IS A DAVE DERRICK DISCOVERY (DDD)
INVOLVING UNDERGRADUATES IN THE DETERMINATION OF THE RELATIONSHIP BETWEEN SURFACE WATER AND GROUNDWATER by ISIORHO, Solomon A. (PhD) Dept. of Geosciences.
1 Questions Addressed What are the options for reducing pollutant inputs to Lake Tahoe? Pollutant Reduction Opportunities.
Small Grain Water Use Montana Small Grain Guide. Water - Nitrogen Relationship u Studies show that without adequate Nitrogen, wheat & barley yields increase.
POPLAR RIVER, LUTSEN, MN. SEPARATING THE MEGA-SLIDE FROM THE RIVER (AND MORE) By the stream dream team.
AT-GRADE, HINGED, & UNDERGROUND GRADE CONTROL. AT-GRADE & HINGED GRADE CONTROL STRUCTURE ON HICKAHALLA CREEK NEAR SENATOBIA, MS. Constructed in 1989 to.
Woody Plant Installations to Ensure Survival Lync Training (12 March 2013) Dr. William M. Fountain Extension Professor of Arboriculture UK College of Agriculture.
Biogeochemical And Hydrologic Processes of Tempe Town Lake Marissa Raleigh.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
Inland Wetlands Alternate Names: Marshes, bogs, swamps Presented by: VC and AMB.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
A Chemical and Vegetative Characterization of the Ichetucknee River Sky K. Notestein and Thomas K. Frazer.
ICE DAMAGE REDUCTION PROJECT- CHAUTAUQUA MOUTH (LAKE ERIE) WESTFIELD, NY Pix by Dave Spann.
Two Union Square Union Street, Suite 601 Seattle, WA (206) Field testing and modeling of in situ groundwater.
Soil conservation practices Contents Soil conservation practices Soil conservation practices Crop rotation Crop rotation Wind break Wind break Cover.
CASE STUDY- West Fork Beaver River, West Point, OH. Constructed Sept
DUCK CREEK EAST OF EASTERN AVENUE DAMAGED BY THE BIG RAIN ON JUNE 12, 2008 (7 inches in an hour, Q-75 year flow) PROJECT CONSTRUCTED BY CITY OF DAVINPORT,
Sarah Brunsvold and Kasey Marley Faculty Mentor: Dr. Zuhdi Aljobeh Department of Civil Engineering Valparaiso University.
Little Blue River, Kansas: Over Nine Miles of River Stabilization & 166 Acres of Riparian Corridor Establishment By Phil Balch, with a little help from.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
Earth Day Award Nomination by Utah School and Institutional Trust Lands Administration and the Division of Wildlife Resources.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
THE STEP- BY STEPS: as posted on the FTP site. Cross-section of Eroded Bank.
NITROGEN & PHOSPHORUS REMOVAL FROM GROUNDWATER LITTLE BOGUE, MS. CONSTRUCTED NOVEMBER 2009.
Bioengineering & “Funnel” Strategy Nichols Road Bridge, Onondaga Creek, NY A completed project needed some “tweaking” and veg. Top bank stone.
North Creek Water Quality Prepared by Jon Rogers and Carie McCoy.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
VINES & LOW GROWING GROUNDCOVERS: OVERLOOKED RESTORATION TECHNIQUES.
CASE STUDY:Grand River at Route “A” 100 miles north of Kansas City, MO. Constructed June 2001 False Banklines using LPSTP (medium-sized river)
 Holds water in the landscape so it infiltrates (drain) into the ground.
Check out the bingo sign! CAZENOVIA STEPHENSON ST. BRIDGE.
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY WEIRS; & A RANDOM.
ACCOTINK AIRFIELD RUNWAY & RECHLORINATION PLANT PROJECTS GARRISON FORT BELVOIR, FAIRFAX, VA CONSTRUCTED Dec 2-5, 2008.
HAW CREEK, PIKE COUNTY, MISSOURI-TRIB TO SALT RIVER ERODING STREAM THREATHENING COUNTY ROAD #107, FOURTEEN FT TALL ERODING BANK WITHIN 4 FT OF THE ROAD,
 Water Quality Variability in a Bioswell and Concrete Drainage Pipe, Southwest Lincoln, Nebraska Jessica Shortino, B.S. University of Nebraska-Lincoln.
August 2008 Preparing the Planting Site Developed by: Dr. Teri Hamlin Georgia Department of Education.
Half-Drowned Bushes with Traffic Control Stones & additional plantings.
ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share.
GOODWIN WARNER MCBRIDE PROPERTY, NEAR BATESVILLE, MS. CONSTRUCTED FEB 26 – MAR 2, 2007 The final design was based on the landowner’s required stream.
Riparian Buffers for Water Resource Protection Michael R. Burchell II Associate Professor and Extension Specialist Department of Biological and Agricultural.
Garden design and layout
VEGETATION DOES NOT TAKE A LONG TIME TO GET ESTABLISHED GOODWIN CREEK, MS. CONSTRUCTED AS A HANDS-ON WORKSHOP, MARCH 2007.
Hydrogeologic Investigations of the Silver Lake Wetland
Little River Ditches Watershed Monitoring
DINGMANS CREEK, SITE 4, SMALL SLIDE, DELAWARE WATER GAP PROJECT VEGETATED KEYS; TRAFFIC CONTROL STONES; PLANTINGS; SINGLE STONE BENDWAY.
Presentation transcript:

NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER

NITROGEN & PHOSPHORUS REMOVAL FROM SHALLOW GROUNDWATER LITTLE BOGUE, ELLIOTT, MS. CONSTRUCTED NOVEMBER 2009

Research Monitoring & Analysis Hydrolab used to measure DO, ORP, temp, conductivity, turbidity & pH Lab measurement of ortho-P, NO 3 -N, TOC, alkalinity and NH 3 -N

Colorado State Field Lab Nitrogen Removal Results

Colorado State Field Lab Phosphorus Removal Results

LITTLE BOGUE, ELLIOTT, MS. FULL-SIZED TEST SITE –CONSTRUCTED FALL 2008 Drawings by Dave Derrick

Aerial view with approximate research project trench location in yellow & control section (trench not dug) in pink. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE FROM RED HEN VIDEO

RS2 Test Site: Little Bogue, Elliott, MS On the narrow mid-bank bench (average width ft, approx. 8 ft above the streamside floodplain bench), a trench a bucket wide (1.0 ft) was dug to a depth of 4 ft. This should intercept a large amount of shallow groundwater.

RS2 Test Site: Little Bogue, Elliott, MS There is a 75 ft long control section (nothing done, no trench, just monitoring instruments), and a 150 ft long test trench section. Within the downstream 75 ft of the test trench, three 25 ft-long test plots of adventitious rooting poles of Black Willow, Sycamore, & River Birch were placed, spacing varied from 1 to 2 ft.

RS2 Test Site: Little Bogue, Elliott, MS For the test section shovels were used to backfill the trench with a mix of 20% (by volume) Aluminum Sulfate, xx% mulch, and the remainder native soil from the trench. This effectively planted the live poles to a depth of 4 ft.

RS2 Test Site: Little Bogue, Elliott, MS Monitoring instruments determine performance of the control and planted & not planted test sections. Instruments at different depths will determine if some groundwater is bypassing the test trench.

RS2 Test Site: Little Bogue, Elliott, MS According to the CSU laboratory tests, the Aluminum Sulfide and carbon (mulch) should greatly reduce the Nitrogen & Phosphorus load to the stream.

Install instrumentation as required. Monitor for long-term project performance. 200 ft RS2 Test Site: Little Bogue, Elliott, MS - aerial view

Looking entrance conditions into project bend. Note floodplain bench & mid-bank bench where the test will occur. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK

Looking the mid-bank bench where the test will be conducted. Control area in pink, test trench location in black. PRE-PROJECT - RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK

LET’S DO SOME RESEARCH !!

1ft 4ft Design concept of Reactive Stream Stabilization (RS2) on Little Bogue From Drs. Dave Biedenharn & Chester Watson

Two bags of Aluminum Sulfate for each bag of Eucalyptus mulch CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK

Hand labor is used to mix Aluminum Sulfate & mulch into backfill. Next time an excavator will be used to mix and backfill, we are learning!! No plantings in this first 75 ft. CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK

Trench was dug to a consistent depth of 4 ft for entire length CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK John McCullah says, “Dig a hole, plant a pole!!”

Looking seeded & mulched trench, berm, & plantings. CONSTRUCTION-RS2 PROJECT-LITTLE BOGUE PIX BY DAVE DERRICK

Water & soil samples taken in May and July Monitoring wells installed January From Drs. Dave Biedenharn & Chester Watson

7 MONTHS AFTER PROJECT COMPLETION TAKING SOIL SAMPLES Photos by Derrick JULY 3, 2009

Looking the test site. Excellent planted grass coverage. All planted poles died except for a few willows!!! 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Close-up of one of the willows that lived. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Looking downhill at one of the monitoring wells. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Ground water & soil sampling protocol from Dr. Ken Carlson, Colorado State University.

Tools used to take a soil sample 16 inches below the surface. 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Very dry for the top 7 inches or so in each of the 15 soil sample holes 7 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Soil Sample Results Total phosphorus reduced by about 44% through RS2. Increased by Total phosphorus reduced by about 44% through RS2. Increased by about 58% through control section. The bio-available phosphorus was decreased by about 55% through RS2, and by about 20% through control section From Drs. Dave Biedenharn & Chester Watson

Well Sample Results Total nitrogen (TN) reduced by 40% Nitrate (NO3 - ) reduced by 51% Aqueous phase Total Phosphorus (TP) reduced by 31% Aqueous phase Dissolved Reactive Phosphorus (DRP) reduced by 14% Total Organic Carbon increased by 590% (most likely due to mulch amendment to barrier) From Drs. Dave Biedenharn & Chester Watson

17 MONTHS AFTER PROJECT COMPLETION Photos by Derrick April 5, 2010

Looking US. Nature has taken over the test site 17 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Several planted willows were growing thriving. Most of the other plants probably died due to the poisonous to plants natural chemical found in the eucalyptus bark mulch that was used. 17 MONTHS AFTER TRENCHING-LITTLE BOGUE PIX DERRICK

Summary The initial results from the Little Bogue Reactive Stream Stabilization project are very encouraging. The design objectives of installing a reactive barrier with significantly elevated concentrations of aluminum for P adsorption and bio-available organic matter for enhanced nitrogen removal appear to have been achieved. Based on sampling data from 5 and 7 months after construction, the RS2 structure appears to be removing significant amounts of N and P from agricultural runoff that would normally enter the creek. From Drs. Dave Biedenharn & Chester Watson