Merit Network BTOP Status Robert Duncan & Pete Miller Director of Network Operations.

Slides:



Advertisements
Similar presentations
Infrastrukturë Backbone ALBANIAN NATIONAL FIBER OPTIC NETWORK.
Advertisements

Confidential and proprietary materials for authorized Verizon personnel and outside agencies only. Use, disclosure or distribution of this material is.
EPSCoR/NSHE C2 Grant Wrap UP Las Vegas Metro Fiber Ring Upgrade Project Presented By: Ed Anderson and Stanton Gurr 1.
Massachusetts Broadband Institute Community Representative MassBroadband 123 Briefing Judy Dumont, Director September 10, 2010.
George Boersma Center for Shared Solutions and Technology Partnerships September 18, 2009 Broadband in Michigan Make the Connection!
At 4620 square miles, Lane County, Oregon is nearly as large as the State of Connecticut and is home to some 336,000 residents. Short Mountain Landfill,
Metropolitan Unified Fiber Network (MUFN) Silly name – SERIOUS fiber.
Laura Diltz Joel Bojarski.  E-Rate is a federal Education Rate program, which provides discounts to schools and libraries for telecommunications, technology.
U.S. Conference of Mayors Urban Water Council Gulf Coast Water System Disaster Recovery June 29, 2006Walter Howard, SVP This document does not constitute.
INTERCITY PASSENGER RAIL NORTHEAST UPDATE AASHTO – FEBRUARY 29,
BTOP West Virginia Broadband Infrastructure Project Administration POC Meeting WELCOME April 05, 2011.
Environmental Assessment Public Meeting
Following the BTOP Money What to do after the grant arrives Merit’s REACH-3MC Project Educause August 4, 2010.
BTOP Lessons Learned Don Welch Merit Network. Agenda l Project Review l What has worked l Lessons learned l Risk mitigation l Concluding quotes.
Passenger Rail Development Activities AASHTO Annual Meeting October 18, 2013 Serge Phillips, MnDOT Federal Relations Manager.
Louisiana SIEC 03/25/2009. WCC History State Interoperability Executive Committee - Feb / Aug 2004 State Interoperability Executive Committee -
Broadband in Yancey County Wanda J. Proffitt Jamie McMahan.
Route 364 (Page Ave. Extension) The Missouri Department of Transportation.
FRGP/UPoP/BiSON 1 Marla Meehl Manager NCAR/UCAR Network Engineering & Telecommunications Section, FRGP, UPoP, BiSON CENIC Meeting – 3/11/13.
History of US Bicycle Routes In 1970’s interest in long distance bicycle travel proliferates.
1 NG KIH / I Way UK Analytics & Technologies Service Showcase 2015 August 6, 2015 Presented by Finance and Administration Cabinet Commonwealth of Kentucky.
“High Speed Rail Implementation - An Update on Passenger Rail Planning Activities in Minnesota.” presented by: Minnesota Department of Transportation March.
BOREAS-Net : Broadband Optical Research, Education and Sciences Network Paul Lustgraaf Mike McQuiston March 30, 2007.
BOREAS-Net : Broadband Optical Research, Education and Sciences Network David Farmer Joint Techs February 12, 2007.
Passenger Rail Planning Activities in Minnesota presented by: Minnesota Department of Transportation March 15, 2011.
Introducing Connecting our communities; past, present and future. Workshop 2009.
New Mexico High Speed Networking Projects October 13, 2005 Fall 2005 CHECS Conference Gary Bauerschmidt, UNM Norma Grijalva, NMSU.
2006 Annual Report on the Status of the Implementation of Proposition 400 Management Committee 9/6/06.
Project Oasis West Des Moines, Iowa Presentation January 30, 2013.
PLANNING FOR BROADBAND Sponsored by: Broadband Communities American Planning Association Sept, 2015 Presented by: Kathleen McMahon, AICP
Case Study – Building A Regional Optical Network (RON) The Quilt Fiber Workshop June 21-23, 2004.
1 University at Buffalo Vision: Western New York Not-For-Profit Information Technology Network Spring 2005 Internet 2 Member Meeting Regional Optical Networks.
Wausau CAN: Marathon County, Wisconsin 18: Community Anchor Institutions to be connected 0: Community Anchor Institutions currently connected 0: Total.
Quilt Regional Optical Networking Workshop, June Michigan LambdaRail (MiLR) Optical Networking Project W. Scott Gerstenberger External Networking.
Quilt Optical Fiber Workshop Boulder Research and Administrative Network (BRAN) Experiences/Lessons Learned By Jim Van Dyke.
Jim Van Dyke Network Engineering & Technology Section The UCAR Physical Network Infrastructure or Why Bother to Do It Right? Presented By: James R. Van.
REACH-3MC Network Engineering Michael Milliken, Director Network Engineering and Operations MAEDS October 2011.
Illinois Century Network Illinois Broadband Opportunity Partnership – East Central Project.
I-Light Network Caroline Weilhamer Manager of Services and Support June 28, 2012.
Reviewing What We’ve Learned: chart Human Characteristics  Natural Characteristics Two Peninsulas  Mackinac Bridge Literature Connection: Mackinac Bridge:
Broadband for Louisa County Building the Future. How Rural is Louisa? Louisa County  34,000 residents  14,000 households  511 square miles  Density.
“MITI” Massachusetts Information Turnpike Initiative “New StateNets” Presentation February 13 th, 2008.
© 2015 Universal Service Administrative Company. All rights reserved E-rate Program Applicant Trainings I Fiber Options1 Fiber Options Deep Dive:
Development Authority of the North Country 317 Washington Street, Suite 414 Watertown, NY An Economic Development Initiative.
21 st Century Network Project Status Approximately 18 months ago work began on the 21st Century Network Project. This project encompasses many facets of.
Fiber Acquisition and Implementation Internet2 – Joint Techs July 17, 2006.
Kevin Harrison LTEC 4550 Assignment 3.  Ethernet Hub  An unsophisticated device that is used for connecting multiple Ethernet devices together.  Typically.
Chapel Hill Parks and Recreation. “Networks of natural spaces which provide corridors connecting areas such as neighborhoods, parks, and schools.
1 Wide Area Network Project Information Technology Advisory Committee March 21, 2007.
Run - II Networks Run-II Computing Review 9/13/04 Phil DeMar Networks Section Head.
Dig Once (with Many Partners) The Dakota County Broadband Network State Broadband Task Force June 15, 2016.
Center Point Area Fire Department SAFETY AND SUSTAINABILITY.
Laura Diltz Joel Bojarski.  Dark fiber is a term used to describe fiber optic cable that is not being used at the time  This is contrasted with active.
Phoenix Regional ITS Fiber Optic Backbone. PURPOSES  Improve agency operations by establishing a shared, regional, telecommunications network.  Create.
Copyright 2015 FairPoint Communications Municipal Broadband - Economic Development & Community Planning Bar Harbor Program Overview 1.
Network Administration and Systems Services. Dark fiber ring.
Preliminary Estimated Cost
REACH-3MC Awarded! Broadband ARRA Funding
CIRBN Central Illinois Regional Broadband Network
Eligible Services and Fiber Options for Service Providers
Information Technology Department
MINTACÍM SZERKESZTÉSE
PROJECT THOR Impact on the Region
AMERIND Critical Infrastructure Tribes Bringing Tribes Broadband
Maryland Telehealth Roundtable
How to build 2300 Miles of Fiber in Your Spare Time
New Public Transport Infrastructure
“The North Crossing” Accessible Connection from Rideau Heights to Kingscourt and the Downtown.
North Olympic Peninsula Broadband Symposium March 18th, 2019
Presentation transcript:

Merit Network BTOP Status Robert Duncan & Pete Miller Director of Network Operations

REACH-3MC Project l $130 MM Project l $102 MM Federal Government l $8 MM Merit l $20 MM Commercial Sub- recipients l ~2300 miles of backbone fiber- optic cable l Equal access to Information throughout Michigan l Over 100 schools/libraries directly connected l Fiber is a possibility for hundreds more l Homes and businesses served by sub-recipients and their customers

REACH 3MC Route Breakdown l Round I Routes are in four corridors: l Southern Corridor, Monroe to Benton Harbor l Western Corridor, Benton Harbor to Mackinaw City l Central Corridor, Mount Pleasant to Hillman l Eastern Corridor, Midland to Oscoda l Within each corridor fiber segments from city to city were defined l Intermediate cities were selected for “drive by” to allow future service to under served areas

REACH 3MC II Route Breakdown l Round II Routes are in three corridors: l Middle Corridor, Grand Rapids to Oscoda l North East Corridor, Oscoda to Mackinaw City l Northern Corridor, St. Ignace to Ironwood l Additional spurs from the main path: l Green Bay spur, connects to Wiscnet and BOREASnet l Duluth spur, connects to BOREASnet l Houghton spur, connects to MTU

REACH 3MC, II and Existing Merit Backbone l Merit’s existing 1,600 mile fiber network is shown in GREEN l Round I ARRA funded new build is shown in BLUE l Round II ARRA proposed new build is shown in RED l Both join current Merit fiber network in key locations l MonroeHillsdale l Mt. PleasantMuskegon l MidlandHillman l Big RapidsGrand Rapids

REACH 3MC Network Specifications l Backbone network varies from 60 to 156 count across the entire primary footprint l Distributed across ?? partners l Partners have ownership of various count of fiber on a per segment basis l Lateral builds into Anchor Tenants will be fewer fiber l Builds into Anchor Tenants off of the main fiber trunk are budgeted separately from the backbone l Merit is taking count across the segments l On one portion of the Southern Route Merit has 12 count l SMF-28e or equivalent fiber will be used l Low loss across DWDM bands l Reasonable price point l No special optronics required

Fiber Utilization Planning l Merit will immediately light two pair of fiber l One fiber pair will be lit with long haul DWDM 10ge electronics and connect major sites l Approximately 150 to 200 miles apart l No mid segment node insertions planned l The second fiber pair will be lit with CWDM 1ge electronics l This will be the access network l Many mid segment insertions planned l Driving signal both directions to nearest 10g node l Remaining dark fiber will be available for future network expansion and lease 10g North Node 10g South Node 1g Mid Node

Implementation Strategy l Completed Environmental Assessment For Round I l Completed Engineering For Round I l Sourced the optical networking HW to ADVA l Completed Round I Construction RFP l Will Work With 5 or 6 Construction Firms l Approximately 20 Construction Crews Running l Build Out From Existing Network

Collaboration l Duluth Spur Connecting To BOREASnet l Green Bay Spur Connecting To Wiscnet and BOREASnet l UW-Extensions (Popular Wis. To Superior) l Build Will Utilize Existing Infrastructure l 20 Miles of Manistee ISD? Conduit l Grand Haven School District Conduit l All Band/ Hillman Conduit l Bridge Authority l Build Collaborations l Bloomingdale Telephone l Northeast Co-OP Duluth

Lessons Learned l Environmental Assessment / FONSI l RFP Everything / Sole Source Justification l Documentation Docs l Governmental Regulations and Requirements l Permitting l Collaboration Is Critical

Thank You