Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation.

Slides:



Advertisements
Similar presentations
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
Advertisements

1 Making buildings better Building Tight Chris Knights.
Thermal Bridges in new Dwellings..... Accredited details – Designing & detailing for Compliance Danny Kearney Main changes to Part F for dwellings.
Timber Framed Structures
Building Energy Rating
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Walls Ron Gatepain constructionsite.
© Stroma Development Ltd 2013 | Version 1.1 Stroma – insulation Insulation Wall insulation Cavity wall insulation / Solid wall insulation Roof insulation.
Building Drawings and Symbols
TWO POINT PERSPECTIVE procedure
After the foundations have been completed the walls are set out and construction commences. wall structures.
KILSYTH ACADEMY TECHNICAL DEPARTMENT INTERMEDIATE 2 GRAPHICS KNOWLEDGE AND INTERPRATATION REVISON BOOKLET PLANOMETRI C VIEWS Click to edit Master title.
Door Details in Masonry. Masonry Construction u Detailer needs to understand –how a door is installed –space available (Masonry Opening) u Masonry Opening.
Topic C1 Superstructures - walls
Adriana Galue Wolfgang Custom Finishes HOME ENERGY STATS Biggest energy consumers Space heating – 34% Appliances and lighting – 34% Refrigerator.
Did you know? If every house in the United Kingdom were to turn their heating down by just 1 0 C, one power station could be entirely shut down! STARTER.
Summary of Energy Star Site Inspection July 11, 2007
What You Need to Know About EPA’s ENERGY STAR Certified Homes Program Learn more at energystar.gov 1.
The Climate Challenge Matt Dobson Regional Director, Royal Institute of British Architects Opportunities for UK business.
What is Thermal Bridging? A reduction of the effectiveness of insulation to reduce conductive heat flow through the building envelope otherwise know as.
Owen Gallagher Technical Sales Manager “Promoting Traditional Build”
Ben Craig, Operations Director 25 April 2013 DECC Fuel Poverty Project The Delivery Experience.
Chapter 35 Section Layout.
1 HVACR116 – Trade Skills Plan Views Elevations Plan Views Elevations.
BPE- Maximising the Outcomes Dr Kerry J Mashford, Chief Executive, National Energy Foundation Innovate UK: BPE Outcomes - November 2014 Improving the use.
Graphic Communication
Insulation and Infiltration
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
LowCarb4Real Knowledge Exchange Plan outline. Knowledge Exchange.
EDT Elevations1 Weekend Cabin Retreat Project Elevations Sacramento City College EDT 300/ENGR 306.
67 Temple Avenue The reality of energy savings in retrofit Owen Daggett 25 th September 2012.
Wales Building Regulations 2013 Part L Existing non-domestic buildings September 2012.
HVACR116 – Trade Skills Plan Views Elevations. Plan Views.
SELECTING INSULATION MATERIALS  Insulation can serve as more than just an energy barrier, providing fire resistance, humidity control, and noise reduction.
Name ________________ Unit 6/P6 – Traditional Construction Most common foundation = strip Damp Proof Course 150mm above ground level External Walls are.
Lecture 15 - Timber Wall Framing Example
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
22 April 09 Renewable Energy Course Raising energy performance in domestic refurbishment and new built Adam Tilford Senior Energy Specialist
Choose a category. You will be given the answer. You must give the correct question. Click to begin.
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Robustdetails Feedback from Robust Details Technical Advisors.
Drafting 2 (Arch) Quiz Review #6 Quiz Review. 1.To anchor a stud wall to the subfloor, carpenters nail through the: Sole plate Header Jamb Joists Quiz.
When drawing your plan, try and add as much detail as you can, labelling different features, such as double glazed windows and cavity walls. Draw two.
Thermal Bridges peter warm AECB Conference Norwich June 2008 peter warm AECB Conference Norwich June 2008.
PRESENTED BY: Al Cobb, Founder, Sips School CHAPTER 7 OF 10 Layout & Panel Installation SPONSORED BY:
Floor Systems and Foundation Support
Introduction to Elevations
Cavity Wall Construction
Backgrounds and Plaster
Getting to Zero Carbon Heather Stamp Low Carbon R&D Manager
LEVEL 4 Air Pressure Testing
External Walls Carl James.
Timber Framed Buildings
THERMAL LOADING OF BUILDINGS
Insulation Dr. Qing Wang
Refer to slide robustdetails robustdetails.
Construction Technology
Prepared by Frank Cooney B.Arch MRIA
Progress Charts.
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Thermal Conductivity.
Introduction to Elevations
Wood Structures Topic 8 Quality Workmanship
Agree Learning Outcomes:
Section and Details Vocabulary and Basic Information
Backgrounds and plaster
Testing and Grading Materials
MATERIALS AND CONSTRUCTION I
Graphic Communication
Improving Quality – Changing the Development Process Richard John, NEF
Presentation transcript:

Tom Dollard Head of Sustainability Pollard SME Builder’s Book Consultation

How to reduce the performance gap? The Builder’s Book Question / Answer session Complete feedback form = drink!

Performance Gap The performance gap - what? The difference between the design and the completed performance of the building There are many reasons for this, stemming across design, procurement and construction The Zero Carbon Hub has produced several reports and in depth research on this subject Design, Procurement, Construction Site issues Site examples

Zero Carbon Hub – Performance Gap The government has challenged industry to reduce the gap between the design and the completed performance of buildings Many independent studies have shown this gap to be from 60%-120% more energy use than predicted. The Zero Carbon Hub has been researching this throughout , with evidence gathered from 22 sites in the UK. The end of term report was issued in July 2014, and work continues......

The evidence gathering stage A team of 4 people assessed each of the 22 sites across the UK including small, medium and large developers 5 days of evidence gathering for each site: Interviews Design Review Construction walk-through

What did we find out? There is a significant performance gap – 15% - 50% higher than asbuilt SAP No sites had the same window specification as SAP Unaccounted thermal bridging is prevalent Overheating is not considered Part L accredited details not used correctly – knowledge Gap, not robust The performance gap can be attributed to a large number of small errors throughout the design and construction process

Common issues on site Windows set too far forward with no overlap to cavity = thermal bridge Windows – incorrect specification U value and G value worse than design Gaps in insulation – poor installation of rigid board and injected insulation

LACK OF SITE TEAM ENERGY PERFORMANCE RELATED KNOWLEDGE AND SKILLS AND/OR CARE Example Windows pulled forward from their design positions Overlap with the cavity closer well below the minimum requirements Mastic or foam fill interrupted by metal fixing straps

Common issues on site Dense Blocks instead of aircrete blocks No insulation below DPC Beam and block floors - approx 20% unaccounted thermal bridges and gaps in installation

POOR INSTALLATION OF FABRIC Example Incorrectly fitted insulation Detail when constructed deviates from the design

Common issues on site Standard cavity closer on site but hi- performance insulated closer specified Cavities not consistent width so closer does not fit tightly to block Soffit not insulated – heat loss Flat roof leaves 2 bricks thermal bridge Lintels different to design

LACK IF ADEQUATE QUALITY ASSURANCE ON SITE Example Cavity insulation board stopping short of cavity closers at openings Gaps between boards leading to increased heat loss

Performance Gap(on site) Products / Materials Installation Thermal Bridging Thermal Bypass Airtightness Damp Tolerance Product checklist Design vs Site findings Linked to SAP categories Builder’s book - Installation guide How/what to check? Sequenced diagrams/photos Windows/ Doors Blocks Cavity closers/Lintels Insulation Services incorrect/damaged / substituted

Introduction (1 page) House Section drawing and sequencing (1 page) Common themes on site – top performance gap issues and how to improve (2 pages) Site Posters – Fabric and Services - 18 sheets on specific areas/ junctions (18 pages) Summary Checklist (1 page) Fabric 1.Foundation/Ground Detail 2.Beam and Block Floor 3.Solid Floor 4.Door Thresholds 5.Cavity Wall – partial fill 6.Cavity wall – full fill 7.Floor Joists – intermediate floor 8.Party wall 9.Window cavity closer, cill and lintel 10.Window installation 11.Openings – Bay, oriel windows 12.External Doors 13.Eaves 14.Roof 15.Dryline/plaster 16.Finals Builder’s Book Contents Services/Renewables 1.First fix 2.Second Fix

Improved Process on site? Copy of latest drawings/specification accessible on site Check all elements are in line with the design drawings and specification Site Manager/builder must have adequate communication with design team SAP assessor and Architect on site Hold regular toolbox talks with trades Any others??

Any questions?

Feedback Consultation sessions on site? How useful? How to improve? Please complete form and scribble comments on posters

THANKYOU!! Supported By: