ISE 6 Phase 2 Demo Scenario Nov 20, 2008. 2 Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat.

Slides:



Advertisements
Similar presentations
Linking Technology and Defense. Introduction It stands for Product Life Cycle Support It is an International Standard It is an information standard It.
Advertisements

27 Apr ‘06 1 STEP translator for distribution systems for ShipConstructor ISE-2 & ISE-3 follow-up CATIA V4 to ShipConstructor piping demo ShipConstructor.
AIM Toolset Interfaces with Authoritative Technical Data
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
The Experience Factory May 2004 Leonardo Vaccaro.
Copyright © 2011 Raytheon Company. All rights reserved Customer Success Is Our Mission is a registered trademark of Raytheon Company. Statement A: Approved.
WebShow_PM4D.ppt / MJo 1 Product Model Approach in Design, Construction and FM Development Project : Product Model 4D – Construction Pilot (PM4D) Pilot.
FIBER OPTIC STATUS TMDE Program Life Cycle Conference November 2003 Robert A. Throm NSWCDD Code B35.
Ship Common Information Model (SCIM)
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
NAVSEA Philadelphia Code 94 NAVSEA Philadelphia Code 94 Integrated Logistics & Fleet Maintenance Department Implementation at NAVSEA Philadelphia.
Vice President, Engineering NSRP Executive Director
Interim SCIM and STEP Implementation 2008 NSRP System Technology Panel Project Ted Briggs, Intergraph Corp. Mike Olson, Northrop Grumman Information Systems.
Reuse and Data Module Code Naming Considerations Mike Olson, Northrop Grumman IT Ted Briggs, Intergraph Integrated Shipbuilding Environment (ISE) ISE-6.
Agenda  Contract issues?  Review AP 214 Linkage mechanisms  Review external reference mechanisms  Populate PDM schema  Next Steps.
S1000D/SCORM Progress for Training Support Acquisition Data Standardization Initiative and the Pathways to Efficiencies Unpublished work © 2010 Aerospace.
Integrated Shipbuilding Environment
Integrated Logistics Environment (ILE) NSRP Joint Panel Meeting 7 – 9 December 2010 New Orleans, LA 1 Presented by: Michael Olson Northrop Grumman Technical.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Subtask 1.2 Sharing Structural Design Data with Manufacturing Systems Presented by: Michael.
LSAR – Why Bother? Value Cases For Logistics Support Analysis Records.
27 Apr ‘06 1 Integrated Shipbuilding Environment (ISE) Overview April 27, 2006.
1 ILE Project Integrated Logistics Environment Kickoff Meeting Location:Mystic Marriott Hotel Groton, CT Date:Thursday, June 17, 2010 Overview Presented.
Mega Rust 25 June 2015 RDML Larry Creevy
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
2 Apr ‘08 1 DDG 1000 Logistics Data and Structure DDG 1000 Design Data and Structure Link between design and logistic data Current Logistics data import.
Leading Edge Architecture for Prototyping Systems An Overview.
Presented by: Don Lehner NAVSEA TMDE Program Fleet Review May 2009 CNSL Consolidated TMDE Readiness Assessment (CTRA)
1 ILE Project Integrated Logistics Environment Kickoff Meeting Task 2 Completion of the Ship Common Information Model Presented by: Dr. Burton Gischner.
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
ISE6 Demo 1/9/2008 Virginia Beach Meeting Discussion.
Feb , TRANSATLANTIC ISO AP239 Product Life Cycle Support Land Systems Breakout Group Feb , 2006.
Ben Kassel NSWCCD Ted Briggs Intergraph Corporation An Alternate Approach to the Exchange of Ship Product.
Interim SCIM and STEP Implementation 2008 System Technology Panel Project Ted Briggs, Intergraph Mike Olson, Northrop Grumman Ron Wood, Northrop Grumman.
Configuration Management and Change Control Change is inevitable! So it has to be planned for and managed.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
ISE4 Alternate Demo Scenario Incorporates suggestions B. Kassel, S. Gordon, & B. Gischner with input from: T. Briggs and S. Moore May 23, 2005.
30 April Enabling Shipbuilding Interoperability ISE-6 Project Exchange of Product Models for Life Cycle Support ISE-6 Final Demonstration Overview.
Next Generation ISEA Roadmap
ISE4 Integrated Demo Ver 2 May 11, ISE4 Integrated Demo2 Revised Arrangements Demo Scenario Design agent –Export AP 216 hull form Navy –Import hull.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
Funded by: © AHDS Preservation in Institutional Repositories Preliminary conclusions of the SHERPA DP project Gareth Knight Digital Preservation Officer.
ISE6 Context Schema Overview
2014 NPMA Spring Seminar Value Through Professional Asset Management IUID Clause and Implementation from a Contractor Company Perspective Dan Tully April.
ISE 6 Phase 2 Demo Scenario Sept 11, 2008 NSWC CD.
ISE6 Demo Scenario From 8/30/2007 Telecon. 8/30/2007 ISE6 Demo Scenario 2 Demonstration Core idea: –Use of PLCS enables: Maintaining the right configuration.
ISE6 Demo 11/14/2007 Ft Lauderdale Meeting Discussion.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
November 4, An Integrated Logistics Environment for an Effective Shipbuilding & Supporting Enterprise Prepared by: Dr. Burton GischnerElectric Boat.
1 ILE Project Integrated Logistics Environment Kickoff Meeting NPDI Project & SCIM Summary & Status Presented by: Rick Lobsitz (NGTS)
Synchronise work on DEXs and reference data between PLCS pilots and OASIS/PLCS Workshop #3 10 – 11 November 2004.
DOD STANDARDIZATION CONFERENCE
Publish ISO Technical Corrigenda for ISO , and NSRP Systems Technology Panel Project Pete Lazo Product Data Services Corporation.
March 24, ISE-6 Phase 2 Demo March 24, 2009.
PLCS and S1000D Technical Issues. 2 ISE 6 Phase 2 Technical Issues S1000D PLCS DEX –Need to exchange S1000D data modules and relationships to product.
Confidential & Proprietary T AX -A IDE Site Management Training Chapter 6.
NAVAL INVENTORY CONTROL POINT 1 Naval Supply Systems Command Status of NPB Focus Item Inadequate Technical Data Elaine M. Smith NAVICP Asset Protection.
1 Long Term Retention of Product Model Data Ben Kassel Naval Surface Warfare Center Carderock Division Distribution Statement A : Approved For Public Release;
Developing an IDM Information Delivery Manual Part 1. Industry Workgroup Training, Creating IDMs Alliance NA 2010 Dianne Davis, NA-IDM Coordinator Jan.
Energy Huntsville Opportunity Report and Government Collaboration April 2016.
Making Choice Possible in the Acquisition of Machinery Control Systems Program Executive Office Integrated Warfare Systems (PEO IWS)
Setting the Standard for Product Support
Teamcenter for CAD data management
Proposed Revision of: NSTM 631 Rev
Tech Data Pitch Section
Chapter 11: Software Configuration Management
Final Design Authorization
OmegaPS/Analyzer User Group Meeting 2019
Presentation transcript:

ISE 6 Phase 2 Demo Scenario Nov 20, 2008

2 Stakeholders ISEA –NSWC PHD (Combat Systems) –NSWCCD SSES (HM&E) Program Offices –PMS 500, etc. –IWS 1 (Combat Systems) –IWS 2 (Above Water Sensors) –PEO Ships Policy Makers –NAVSEA 04L –OPNAV N40 Shipyards (Acquisition and Planning Yard)

Invitation List Jim Colson (Army LOGSA) 04L - Bernie Coval, Tim Kriegal, Bucky Buchanan ISW1 – Jolene Marshall, CAPT Mall ISW2 – Noel Smith, PMS 500 – Cheryl Smorto, –Claude Barrens (CGX ship design manager) NAVSSES – Joe Picossi PHD – Troy Sutton, Fabio Vitale, CAPT Ruehlin PEO Ships PEO Subs PEO Carriers 3

Demo Date Phillys in DC April Easter is April 12 4

5 Process Improvements Exchange of integrated design and logistics product data –Between Design and Logistics –Between ISEA, NAVSEA 05, Shipyards, and OEMs –Throughout full life cycle (currently only in acquisition) Standardized data exchange formats –Neutral format IDE data –Improved quality and reduced cost through standardized schema and automated validation/exchange –Enable data reuse Automated identification of change impacts –Reduce costs to evaluate changes –Support cost benefit analysis, design trade studies, etc. –Impact of design or logistics changes Enables Virtual Navy Enterprise

As-is Scenario OEM (RSC) ISEA (PHD) Shipyard / NAVSSES Collaboration Develop ECR Changes Revised Radar Mod 2 Radar Program Office Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Identify Changes Navy S1000D Database CDMD OA TDMIS LEAPS NAVICP WSF Authorization, Funding Program IDE LSA R Update Design and Logistics Update Design and Logistics

Demo Scenario OEM (RSC) ISEA (PHD) Shipyard / NAVSSES Collaboration Develop ECR Revised Radar Program Office(s) Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Update Design and Logistics Navy S1000D Database CDMD OA TDMIS LEAPS NAVICP WSF AP S1000D Authorization, Funding AP S1000D AP S1000D Program IDE LSA R PLCS Identify Changes Update Design and Logistics Changes AP S1000D AP S1000D

Demo Scenario by System OEM (SIR) ISEA (episTree) Shipyard / NAVSSES Collaboration Develop ECR Revised Radar Program Office(s) Authorization, Funding NDE-FMP Revised Radar Data Revised HM&E Data Update Design and Logistics Navy S1000D Database CDMD OA TDMIS LEAPS NAVICP WSF AP S1000D Authorization, Funding AP S1000D AP S1000D Program IDE (Teamcenter) LSA R PLCS Identify Changes Update Design and Logistics Changes AP S1000D AP S1000D S1000D modules Need to add S1000D repository From OEM and Shipyard

In-service Ship Alt PEO authorization SHIPMAIN coordinates development of Alt –ISEA develops Alt for radar system ISEA submits ECR to OEM Update design (drawings) Update logistics (ILS) –Planning yard / NAVSSES develop Alt for HM&E Update design (drawings) Update logistics (ILS)

10 Current Issues Investigate LOGSA LSAR DEX – Tim, Ted, Mike

Clarifciations Separate Ship Constructor demo –Maybe ShipTech –Different audiuence – 2 nd tier yards 11

Demo Data DB –John Crehan to work with Bernie –End of Jan – link from RSC is operational to deliver modules Fall back plan – manually add to Dual Band Radar –Receiver Exciter (REX) Spy 3 30 data modules Functional description, Removal, Procedure, graphics –John Crehan provide metadata by Dec 5 –Matt P. – acquire LCB data, including HSC numbers 12

Demo Data HM&E system –Use AC system (514) –Use AC Plant #1 (51421) –Change the motor ( ) and compressor ( ) –Mike talk to Harold Roll about S1000 DM for AC plant –Ben – find additional VFI tech data for motor and compressor Tim – find out who has S1000D data for LPD 17 motors –Populate data sheet –CAD model for equipment Could export from CATIA Need GUIDS for LEAPS Mike – Provide STEP files for distributed systems 13

Previous Demo Planning Slides 14

15 ISE 6 Phase 2 Demo Scenario Initial Data Exchange and Load –Export selected HVAC system from LPD IDE as PLCS data with links to S1000D data modules –Export selected Dual Band Radar (DBR) system from NSWC PHD/Raytheon (System TBD) as PLCS data with links to S1000D data modules –PLCS data modified to allow import into DDG 1000 IDE –PLCS data imported into DDG 1000 IDE –S1000D data and publication modules for HVAC and DBR delivered to Navy Common Source Data Base (CSDB) Change Management –New Mod of Dual Band Radar is developed and authorized for use –New radar cabinets generate more heat, require additional cooling in the space –New cooling requirements passed to Shipyard Engineering –HVAC system is redesigned –Affected S1000D data modules for HVAC and DBR system Technical Manuals are updated –HVAC and DBR system Technical Manuals updated –Updated design passed to LEAPS

16 PLCS & S1000D: Functional Scenario Shipyard B Design (3D CAD Data) Shipyard B IDE (Update Tech Pub) Navy IDE (Design & Analysis) Shipyard A IDE (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)

17 Shipyard B IDE Teamcenter DDG 1000 IDE Software CAD Tool Design Shipyard LEAPS Navy Design & Analysis Repository Navy IDE AIM/SIR LPD 17 IPDE Software Shipyard A IDE episTree Knowledge Management Software 3D Design New Support Requirements AP S1000D AP 214 HVAC AP S1000D Ship Alt Changes PLCS & S1000D: Exchange Scenario AP S1000D Common Source DB NAVSEA / NSWCCD NAVSEA / Navy ISEA TBD System S1000D Modules S1000D Modules Candidate Data Module Updates

18 Updated Requirements PLCS & S1000D: Data Scenario DM 1.1 DM 1.2 DM 1.3 Chillers Duct 1 Chiller 2 Duct 2 HVAC Sys Drawing2 DM 2.3 DM 2.2 HVAC Sys TM 1 HVAC Sys TM 2 ISEA IDE (Radar) DM 1.1 DM 1.2 Mod 1 Radar TM Mod 1 DM 1.3 Mod 2 DM 2.1 Mod 2 Radar TM DM 2.2 Chiller 1 HVAC Sys HVAC Ducts HVAC Sys Drawing1 Shipyard Design & IDE

19 Demo Data HVAC and DBR system PLCS data –Similar to last year’s demo –Equipment – chiller? –AP 227 implications HVAC and DBR system Tech Manual / Data Modules –Need to define minimal TM content, divide into DM –Define DMC structure –Define necessary metadata

20 Backup

21 AIM/SIR LPD 17 IPDE Software Teamcenter DDG 1000 IDE Software episTree Knowledge Management Software LEAPS Navy Design & Analysis Repository CATIA (V4 AEC) ShipConstructor 2006 ShipConstructor 2008 AP 227 AP 239 AP 214 Design Navy IDE Shipyard A-IDE Shipyard B-IDE 3D Design Design & Logistics AP 214 AP 239 Design & Logistics, including 3D Design AP 239 AP239/PLCS (ISE-6 Phase 1) Demo Scenario

22 PLCS & S1000D: Functional Scenario Shipyard A Design (3D CAD Data) Shipyard A IDE (Update Tech Pub) Navy IDE (Design & Analysis) Navy Depot (Design, Logistics, Support) Data Prep & QA (Design, Logistics, & CAD) Navy ISEA (GFE Change)