Presents Autoconer Automation System

Slides:



Advertisements
Similar presentations
Airbus Production System
Advertisements

MicroDot Softwares Welcome to the Presentation of MicroDot Deckle Planner.
System Developed By Srijan Software Services, Dehradun Are you associated with Multiple Companies ? Are you facing problems ? Service industry is the largest.
Sliver Information system KITMaster. Sliver Information System KIT Real time production and quality monitoring –sliver count –sliver evenness –spectrogram.
Are your CNC machines making money, or just chips ?
A presentation by Werardt Systemss P Ltd An Online Machine Monitoring System.
W e l c o m e t o. Asset Tracking System Thousands of satisfied customersThousands of satisfied customers Customer feedback and enhancements since 2000Customer.
Confidential - All Rights Reserved - © Capacity Analysis Fill in Supplier Name and Supplier Location (Address) Fill in Part Name (Ex: Bush, Button,
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Decomposition Method.
Welcome to a tour of Limb Volumes Professional 6.0 LVP6.0 is the latest version of the world famous and widely used lymphedema tracking and reporting software.
A new standard in Enterprise File Backup. Contents 1.Comparison with current backup methods 2.Introducing Snapshot EFB 3.Snapshot EFB features 4.Organization.
New Horizons Cybersoft Limited. CONTENTS Concept Behind Spot Billing Benefits of SBM(GPRS) GPRS enabled SBM advantages. SBM(GPRS) Billing Process Data.
The Components There are three main components of inDepth Lite, inDepth and inDepth+ Real Time Component Reporting Package Configuration Tools.
Ventura Automation Services Inc.  Loop Length/Production DAQ System  Server  RS-485 to RS-232 Converters  KnitForce  KnitForce Software.
Asset Optimization Solutions. Asset Optimization Solutions Will Help to identify and Improve the true Potential of existing Plant and Machinery.
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Wonderware Performance Software 3.5 “Real-time Visibility into Equipment Performance” Alex Chia Solution Sales Manager.
CONTACTLESS Advanced punch-card system SYCAPS – Proximity Time Recorder.
Chapter 7: Project Cost Management
MEDICAL RECORDS MANAGEMENT IN EYE CARE SERVICES
Zircon InfoTech Presents Autocoro Automation System.
AASMIS – S (Autoconer Automation (Savio) MIS System )
Reduce your costs Without reducing your effectiveness.
In today’s world technological advances are taking place at a rapid pace. One of the goals of everyone is working towards is to satisfy customer needs.
Doc Document Management Systems For Manufacturing Industry Infocrew Solutions Pvt.Ltd.
Computerised Maintenance Management Systems
Completions Safety, Speed, Efficiency, Real Time Statistics and Progress.
Final presentation. Ammar Latif Zaheer u din (01141) Tufail Khalid (1047) Tufail Khalid (1047) M. Sufian (01157) M. Sufian (01157) Bilal Nazir (01229)
Computerized Maintenance Management Solutions (CMMS)
1//hw Cherniak Software Development Corporation ARM Features Presentation Alacrity Results Management (ARM) Major Feature Description.
Background on USPS mail forwarding operations Overview of PARS
WHAT Exam Practice WHY All MUST Most SHOULD Some COULD Be able to understand the requirements of the exam to achieve a grade D Be able to understand the.
1 Work Sampling Can provide information about men and machines in less time and lower cost. It has three main uses: 1.Activity and delay sampling To measure.
How FACILITY CMIS and E-Portal are used within the organisation
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Kautilya Manufacturing Efficiency Measurer.
To enhance learning, service, and research through an advanced information technology environment. Our Mission:To enhance learning, service,and research.
Today  Table/List operations  Parallel Arrays  Efficiency and Big ‘O’  Searching.
Document Management System for Construction Industry From Crystal Infosystems & Services.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
© 2006 Prentice Hall, Inc.S6 – 1 Operations Management Supplement 6 – Statistical Process Control © 2006 Prentice Hall, Inc. PowerPoint presentation to.
Touchstone Automation’s DART ™ (Data Analysis and Reporting Tool)
Copyright © 1994 Carnegie Mellon University Disciplined Software Engineering - Lecture 3 1 Software Size Estimation I Material adapted from: Disciplined.
Affordable Computerized Maintenance Management Solutions (CMMS) Gabi Miles Hach Company May 22, 2009.
Disciplined Software Engineering Lecture #3 Software Engineering Institute Carnegie Mellon University Pittsburgh, PA Sponsored by the U.S. Department.
An Overview by.
Manufacturing Solutions- Weaving TexManage. Modules TexManage Manufacturing Solutions- Weaving Manufacturing Modules Production Management Grey Ware House.
CAG - The influence of CAG Systems on Industry and Society Graphic Communication Knowledge & Understanding.
Capacity Plan
Manufacturing Solutions- Knitting TexManage. Knitting Functional Flow Receipt of Orders Generation of Internal Order Yarn Requirement Allocation of Machinery.
BY Sajan Moharana Ashwani Rao. Problems……………… Checks is that the repeating size is not constant but variable. If the repeat is not constant, we cannot.
KANZEN INSTITUTE ASIA PACIFIC 1 What is OEE ? OEE Overall Equipment Effectiveness Why is a high OEE important for the department ? OEE Calculation How.
Manufacturing Productivity Solutions Management Metrics for Lean Manufacturing Companies Total Productive Maintenance (T.P.M.) Overall Equipment Effectivity.
Manufacturing Productivity Solutions
Chapter 19 Manufacturing Overhead Standard Costs: Completing the Accounting Cycle for Standards costs.
Seminar On Energy Audit Submitted To: Submitted By:
3.2 Your strategic MES partner.
Network Configurations
WSAS WORK STATION ANALYSIS SYSTEM
Attacking waste in manufacturing
DepEd e-FORMS Automated Form Templates in Excel for Elementary and High School Alfonso C. Corpuz, Physics Teacher September 10, :00 pm.
How to improve production efficiency
Luxfer Gas Cylinders – S&OP Process Improvement
Luxfer Gas Cylinders – S&OP Process Improvement
Operations Management
Welcome to a tour of Limb Volumes Professional 6.0
WSAS WORK STATION ANALYSIS SYSTEM
Presentation transcript:

Presents Autoconer Automation System Zircon InfoTech Presents Autoconer Automation System

Present Working Each Autoconer gives an Automatic Report at each shift end. It prints report on thermal printer. If all the 30 items are printed (i.e. drum no, red light, yellow right, cycle % etc) the length of report is 3 meters. The style of report like this : -

SCHLAFHORST AUTOCONER 238 * Machine 205 (14604891663 ) USTER RoundMag R D2******* SHIFT REPORT *******D2 TH-02.01.03 14:45 A 480 Group 1 P Sec 1-1 W 1-10 A******* LOT PARAMETERS *******A LName P22325 Lot ID 100 Yarn gauge NE 17.7/1 Target yarn speed m/min 1400 Target package diam. mm 230 B******* LOT PRODUCTION *******B Production duration 468 % Efficiency Machine 80.2 Shift 75.4 kg Production total 160 /W * hour 2.13 Doffed packages 40 nDelPac Lot 253 Clearer cuts /100km 22.6 Clearer cuts /bobbin 0.39 Clearer cuts /kg 6.79 Thread breaks /100km 26.0 Yarn joints /100km 72.7 Duration / red light 1.72 % Red light / joint 3.21 % Repeaters / joint 19.8 G**** DETAILED PRODUCTION *****G W %MA tRL tYL tCY tOFF %SF 1 75.7 43 2 67 3 1.90 2 78.0 27 1 58 78 1.63 3 77.5 27 8 60 44 2.11 4 81.8 17 8 59 6 2.30 5 80.1 14 13 65 5 2.62 6 81.3 12 14 61 5 1.50 7 82.6 10 19 51 4 1.22 8 81.9 9 17 58 5 0.55 9 82.0 20 2 60 9 1.11 10 80.4 13 13 64 8 1.90 -------------------------------- 80.2 9.64 16.6 19.3 60.3 1.69 W nBC nCC nTB/ nCS nCL nCT 1 316 119 0.86 45 44 30 2 278 74 1.75 21 26 27 3 272 114 2.07 34 62 18 4 301 92 1.00 21 42 29 5 278 128 1.43 43 42 43 6 259 89 1.19 47 18 24 7 251 95 0.59 40 35 20 8 247 119 1.19 42 50 27 9 278 124 0.80 42 56 26 10 279 132 1.23 52 49 31 2759 1.19 424 1086 387 275

PROBLEMS FACED BY WINDING DEPARTMENT Compilation of voluminous data for long period is tedious. Loss of production in bad drums due to delayed reporting. Identifying abnormal drums failing in any of the multiple items. Limitations due to expensive thermal paper & thermal printer repairs. Focusing on abnormal drums with periodic failure tendency. Repetitive & boring manual calculation for statistical analysis. Frustration due to lack of previous day’s/week’s/month’s data.  

General Practice Adopted Either do not print report at shift end or print a very small report (i.e. limited 6 or 12 items). Do not analyze all items for all machines at a glance.

What is Automation Personal Computer captures data from Autoconer machines at every shift end automatically. No need to print 3 meter long report. Analyze all the data within half an hour. Analyze all the 30 items. View different types of report.

System Architecture A/c - 1 A/c - 2 A/c - 3 A/c - 4 A/c - 5 Interface Box - 1 Interface Box - 2 LAN LAN File Server LAN Application Server

Benefits of Automations Highlights Abnormal/Rouge drums. Increased efficiency due to reduced drum down–time and hard waste. Achieve better quality due to reduced number of cuts. Eliminates expensive thermal paper and printers. Lot to Lot comparisons. Reduced typing & processing manpower. Long term storage & easy recall of data. Easy & faster reporting. Faster decision making. Elimination of duplicity. Unlimited intangible benefits of computerization.

REPORTS Production : This report shows production duration, speed, M/c efficiency, shift efficiency, Efficiency losses (Red & yellow lights, suction failure and cycling losses), Breakup of cycling losses, no. of cuts, yarn contents, total production, rate of production on the basis of standard production. etc. on a single sheet. View report in different ways Lot wise Machine wise Machine wise Lot wise Lot wise Clearer wise Clearer wise Lot wise Winding Register

REPORTS…. Abnormal Drum : This report shows machine wise lot wise abnormal drums for a shift/day based on sigma value (select by user). Standard Abnormal drum report checks 12 items (i.e. toff, tRL, tYL, tCY, %SF, %CP, %AO, nTB/, nCC/, nCL, nCT, nCS) while periodical report shows report for a selected item for fortnight/month. View report in different ways General Abnormal Drum for a Shift/Day Abnormal Drum Report for a Item for a Period With Average Value Without Average Value

REPORTS…. Drum wise Day wise Original Values : This report shows machine wise drum wise actual value for a selected item for a month. This report allows you to select the normal value for the selected item and print report only either for normal value or abnormal values. Drum wise Machine wise Values : This report shows drum wise machines wise actual value for a selected item for a given period. This report allows you to select the normal value for the selected item and print report only either for normal value or abnormal values.

REPORTS…. Summary : This report shows Cuts/100 Km and shift efficiency for a given period. View report in different ways Count wise Lot wise Count wise Machine wise Machine wise Count wise Lot wise Machine wise Machine wise Lot wise Lot wise Clearer wise

REPORTS…. Daily Productivity Index : This report shows Lot wise M/c efficiency, shift efficiency, Cuts/100 Km, standard production per drum, rate of production, production in kg, % of losses, capacity utilization and productivity index for a shift/day for a given period.

REPORTS…. Machine wise Breakup : In this report user can divide all the drums in any machine into four groups based on their performance in a selected item. This helps to set and achieve the performance target. Drum wise Analysis : in this user can apply his own conditions on 8 selected items on selected groups of a machine for a period/day. If the value of drums does not fulfill the defined conditions, it will highlights the values.

REPORTS…. Informator : This report shows the drum wise MIC report for all 30 items on a single line.. View report in different ways For a shift for a Machine Day wise Average values Week wise Average values Fortnight wise Average Values Month wise Average values

COST BENEFITS Saving in Thermal Paper Cost Increased Earning due to Increase in efficiency Reduction in Hard Waste Reduction in Manpower Costs

Saving in Thermal Paper Cost COST BENEFITS…. Saving in Thermal Paper Cost Every Autoconer prints data for 60 drums for all 30 parameters per shift and it takes 3 meters of roll. It costs Rs. 3 per meter. The total paper cost for 11 11 Autoconers x 3 shifts x 365 days x 3 meters x Rs. 3 per meter = Rs. 1,08,405

COST BENEFITS…. Increased Earning due to Increase in Efficiency Due to reduced drum down–time the expected efficiency increases by as much as 5%. Even if we expect a modest figure of 1%, which is not at all difficult to achieve, this will lead to a increased production of 1%. Each Autoconer produces 2000 Kg. of yarn @Rs. 10 per Kg i.e. Rs. 20,000 per day. The increased earning due 1% efficiency will be Rs. 200 per day per Autoconer. For 11 Autoconers and for 365 days, the additional earnings will be Rs. 200 x 11 Autoconers x 365 days = Rs. 8,03,000

COST BENEFITS…. Reduction in Hard Waste A nominal reduction of hard waste to final production ratio by 0.1 % gives us a saving as follows – Rs. 80 per Kg x 0.1% x 2000 Kg x 11 Autoconers x 365 days = Rs. 6,42,400

COST BENEFITS…. Reduction in Manpower Costs Since this automatic system saves the cost of 1 person @Rs. 10,000 per month, the annual saving is Rs. 10000 x 1 person x 12 months = Rs. 1,20,000

The Total Cost Saving Saving in Thermal Paper cost = Rs. 1,08,405 Increased Earning due to Increase in Efficiency = Rs. 8,03,000 Reduction in Hard Waste = Rs. 6,42400 Reduction in Manpower cost = Rs. 1,20,000 The Grand Saving per Year = Rs. 16,73,805 (for 11 Autoconers)

For Further Details Contact : Govind Garg Zircon InfoTech 102,Trade Centre,18 South Tukoganj, Indore-452001 Tel : 731-2523954 Cell no. : 98263-85954 e-mail: zirconinfo@gmail.com

Autoconer Automation System The Beginning