Study Committee SC B3 CIGRE – CNC Toronto, October 2, 2009 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of substations.

Slides:



Advertisements
Similar presentations
CIGRE Study Committee B3 “Substations”
Advertisements

0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Albuquerque,
1 The mission of Study Committee A3 is to facilitate and promote the progress of engineering and the international exchange of information and knowledge.
Study Committee Representatives Annual Report December, 2012
WG B4.62 Connection of Wind Farms to Weak AC Networks Working Group Meeting – June 2013, ERCOT Office, Taylor, Texas.
CIGRE Paris Session Sunday 24 th – Friday 29 th August, 2014 Monday 25 th … General Assembly Tuesday 26 th … SC A3 meeting Wednesday 27 th AM …
AG.03: CIGRE SC A3 Green Book planning
International Symposium on Standards for UHV Transmission System Impacts on UHV Substation Equipment On behalf of CIGRE WG A January 2009,
1 AG.03: CIGRE SC A3 Green Book proposal (based on experience of Brazilian NC to publish CIGRE textbooks) CIGRE SC A3 Green Book Project Team Paulo Fernandez.
Green Roof Action Project 綠頂行動 Our scheme is not just about physical implementation of green features on top of school buildings, it is about the knowledge.
Mr. Harethe El Ouadhane IEC member for IEC MT14. |Infrastructure Business | Germany | Test Engineer & Expert (Internal Arc, Making, Breaking.
1 60 th CIGRE Technical Committee meeting Paris France, 1 September th informal CIGRE Technical Committee meeting Montreal Canada, 3-4 October 2012.
1 Study Committee Representatives Annual Meeting October 4, 2009 Toronto SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
Authorities role in the assessment of energy efficiency Marianne Lindström, Conference on Energy Efficiency in IPPC Installations, Vienna
IB HL2 BUSINESS & MANAGEMENT COURSE OVERVIEW Academic Year.
ISO/IEC Software Testing
INTERNATIONAL ELECTROTECHNICAL COMMISSION Report on SC 17A Activity HV switchgear & controlgear Denis Dufournet Anne Bosma A3-14 (AG 01 ) 013 IWD.
Standardization Aspects in UHV Networks New Delhi, January 2009 Denis Dufournet Chairman IEC TC17 Member CIGRE WG A3-22.
Jeju, 13 – 16 May 2013Standards for Shared ICT HIS – Smart Grid Karen Bartleson, President, IEEE Standards Association Document No: GSC17-PLEN-72 Source:
Amantegui Javier (SP) CIGRE Study Committee B5 1 CIGRE STUDY COMMITTEE B5: MISSION AND CHALLENGES Javier Amantegui (Spain) Chairman of CIGRE-SC-B5 “Protection.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
1 CONSEIL INTERNATIONAL DES GRANDS RESEAUX ELECTRIQUES INTERNATIONAL COUNCIL ON LARGE ELECTRIC SYSTEMS STUDY COMMITTEE A2 TRANSFORMERS Presentation of.
Environmental Impact Assessment (EIA): Overview
Europe goes Offshore with Wind Farms Hermann J. Koch Senior Member IEEE Substations Committee Vice Chairman Siemens Energy Sector Transmission Erlangen,
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B2 “Overhead Lines” Activity Report Presented by: Zibby Kieloch (Manitoba.
Review of Draft AC 021 – Maintenance Contracting Draft AC 022 – Task and Shift Handovers Nie Junjian Airworthiness Inspector COSCAP-NA.
Study Committee SC B3 CIGRE - CNC Winnipeg, October 19, 2008 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of.
Chapter 13: Developing and Implementing Effective Accounting Information Systems
CERTIFICATION In the Electronics Recycling Industry © 2007 IAER Web Site - -
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
The IPPC Directive and its implementation Alexandre Paquot European Commission Environment Directorate-General Phare Capacity.
1/20 ea technology MicroCHeaP: Month 24 meeting Athens Work Package 4 presentation 21 September 2006 Presented by Yvonne Dickson Partners in power asset.
QAA Summative Review Staff Briefing Leeds College of Art 8 September 2010.
Halifax, 31 Oct – 3 Nov 2011ICT Accessibility For All SMART GRID ICT: SECURITY, INTEROPERABILITY & NEXT STEPS John O’Neill, Senior Project Manager CSA.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.32 AR 2014Page No.: 1 Activity Report 2014 WG A3.32 Non Intrusive methods.
Discussion of Market Participant Choice for Transmission Connections Stakeholder Session October 14, 2011.
Toronto, Ontario - Cigre Canada Annual Membership meeting, October 4, 2009 CIGRÉ – 2009 Activity Report for SC C6 DISTRIBUTION SYSTEMS AND DISPERSED GENERATION.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A Page No.: 1 Activity Report 2014 WG A3.33 Experience with equipment.
Pilot Projects on Strengthening Inventory Development and Risk Management-Decision Making for Mercury: A Contribution to the Global Mercury Partnership.
1 Study Committee Representatives Annual Meeting October 19, 2008 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
SUBSTATIONS SESSION Chairman: Ernst GOCKENBACH Reporter: Mark WALDRON.
Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportWG A3.27 AR 2014Page No.: 1 Activity Report 2013 WG A3.27 The Impact of the Application.
HAPUA WG No.5 (ESI Services) Updates The WG2, 5, 6 and Chairman of APGCC Meeting Jakarta, Indonesia ● 26 February 2009 By WG 5 Project Coordinator: MR.
SC B5 - Protection and Automation Report to the Canadian National Committee of CIGRÉ 2009 Simon R. Chano Protection Specialist Hydro Québec TransÉnergie.
Frankfurt (Germany), 6-9 June 2011 SmartLife Guillaume & SmartLife Core Group – France – S1 – Paper SmartLife initiative in Focus.
Cigre / IEC UHV Symposium, New Delhi Strategic Agenda for CIGRE‘s Technical Activities Klaus Fröhlich.
Regional Seminar on Promotion and Utilization of Census Results and on the Revision on the United Nations Principles and Recommendations for Population.
Draft of Terms Of Reference For Hiring a Consultant “Study for establishing the regulation and tools in implementing of DG connection to distribution network”
Working Group on the Value and Benefits Chair´s Report 7th Meeting of the Steering Committee of the INTOSAI Committee on the Knowledge Sharing and Knowledge.
Session 2 (System Aspects) Rapporteur: Hiroshi Okamoto (JP) 2 nd International Symposium on International Standards for Ultra High Voltage, New Delhi,
HEALTH WORKFORCE HEALTH SYSTEM TRANSFORMATION Oklahoma State Innovation Model.
Green Jobs, Sustainable Development and Decent Work G20 Mexico Presidency G20 Labour Employment Preparatory Meeting 14 February 2012, Mexico City.
August 22nd/23rd 2014 WG B3.32 Saving through Optimized Maintenance in Air Insulated Substations 2014 Session – Paris, France.
1 Pacini IT Barcelona May 2003 Improvement in the Distribution Assets Management by the Exploitation of the Innovative Component Technology.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Coordination Activities by JICCG for UHV technology standardization Hisatoshi Ikeda Co-Chairman of IEC/JICCG Toshiba Co. & Kyushu Institute o f Technology.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
INTERNATIONAL ELECTROTECHNICAL COMMISSION «Harmonization of the national accreditation system of Eurasian countries» 23 December 2013 Moscow World Trade.
Integration of Demand Side Management, Distributed Generation, Renewable Energy Sources and Energy Storages Task status report, Task XVII EXCO meeting.
59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012 SC A1 PREFERENTIAL SUBJECTS FOR 2014 SESSION DRAFT PS1: Developments in Rotating Electrical.
ISO/IEC Software Testing The New International Software Testing Standard By Tafline Murnane and Stuart Reid ISO/IEC JTC1/SC7 WG26 Software Testing.
ISO/IEC Software Testing
Protection Specialist
Study Committee Representatives Annual Meeting October 18, 2010 Winnipeg SC B4 “HVDC and Power Electronics” Activity Report Presented by: John McNichol.
REWG activities in LILIIA MALON REWG Chair Prague
Evolution of HV Cable Systems
Karen Bartleson, President, IEEE Standards Association
WORKSHOP 17th Sept 2008 EUROPEAN COMMISSION
Informal document GRVA nd GRVA, 28 Jan Feb. 2019
g3 Alternative Gas Solutions
Presentation transcript:

Study Committee SC B3 CIGRE – CNC Toronto, October 2, 2009 Slide 1 SC - B3 “Substations” Design, construction, maintenance and ongoing management of substations and electrical installations in power stations (excluding generators) CNC CIGRE MEETING SC - B3 “Substations” October 2, 2009 Toronto Presented by: Toly Messinger

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 2 Study Committee B3 - Organization

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 3 AA 1: Advisory Area “Concepts and Developments” AA 1: Advisory Area “Concepts and Developments”  WG B Combining Innovation with Standardisation (Convener: John Finn - UK) Objective: l To investigate benefits of innovative (new technologies and arrangements) and conservative (proved standardized designs) approaches and to try to find ways in which the benefits of these two apparently contradictory philosophies can be combined for future, l Identification of benefits from innovation and benefits from standardization (questionnaire), l Analysis of commonality and conflict between the two philosophies l Recommendation on combination of the two philosophies and on methods for dealing with the perceived conflicts. Analysis of the areas of commonality and conflict between the two philosophies Recommend ways in which the benefits of both approaches may be combined and methods for dealing with the perceived conflicts. Disseminate the results through a report and/or papers and through presentation during relevant events Activities: An ELECTRA report has been published in the October 2006 issue. A questionnaire has been prepared and issued. Replies have been collected and they are being analysed. Combining Innovation with Standardization – brochure – December 2009, Canadian Participation: Mr. Serge Fortin - Hydro-Québec TransÉnergie Ms. Anne-Marie Sahazizian - HydroOne

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 4 AA 1: Advisory Area “Concepts and Developments” AA 1: Advisory Area “Concepts and Developments”  WG B Obtaining Value from Substation Condition Monitoring (Convener: Arthur J Mackrell - UK) Objective: l Identify available condition monitoring devices, detail benefits claimed for these, identify factors to be considered in answering the question ‘will this device be cost-effective?’, derive algorithms to facilitate decision and what aspects of condition monitoring will provide real benefits l Investigate condition monitoring systems currently available (stand alone as well as integrated in protection and control systems) and analyze factors for optimum solution for an individual utility, Attempt to derive an algorithm combining the various factors to assist utilities in making the decision on which aspects of condition monitoring will provide real benefits as opposed to those which simply can be monitored. Disseminate the results through a report and/or paper(s) and through presentation during relevant events Activities: Questionnaires analyzed and incorporated into chapters of Technical Brochure. 75% complete, publication in Electra scheduled for end-of Brochure scheduled for end-of Difficulties: Traveling approvals for members from their companies. Canadian participation: unknown.

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 5 AA 1: Advisory Area “Concepts and Developments” AA 1: Advisory Area “Concepts and Developments”  WG B3.13: Reducing replacement time of HV Equipment (Convener: François Gallon - France) Objective: l To investigate engineering concepts, equipment assemblies and working methods to reduce considerably outages for HV equipment replacement (de-regulated market requirements), Identify the trends of the replacement policies, taking into account the life cycle of HV equipment presently on the market, skills of the workforce and comparative cost for repair versus replacement Identify engineering concepts which may facilitate the replacement in the future, Identify working methods (for example live working, by-passes..) in order to optimize the outage time and the associated intervention cost. Activities : Meetings in Dublin (Apr 2006), Paris (Aug 2006), Milan (Mar 2007), Berlin (Sep 2007), Paris (Aug 2008). Questionnaire has been prepared and released in summer 2007, 35 replies obtained. Results, structure and presentation discussed during last meeting. Some sections and study cases available. Electra report – late Reducing replacement time of HV equipment – brochure – late Canadian participation: unknown

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 6 AA 1: Advisory Area “Concepts and Developments” AA 1: Advisory Area “Concepts and Developments”  WG B3.26: Guidelines for the Design and Construction of AC Offshore Substations for Wind Farms (Convener: John Finn - UK) Objective: Identify key issues which impact on design and construction of AC offshore substations Provide constructive guidelines to designers, developers and constructors to assist them with these issues. Activities : First meeting in Malaga (Mar 2009). Structure of brochure completed, initial chapters in progress. Electra article scheduled for summer Brochure – mid Canadian participation: unknown

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 7 AA 2 : Advisory Area “Gas Insulated Substations” The advisory area covers all aspects of design, construction, operation, maintenance and life- cycle management of the primary installations of gas insulated substations and gas insulated lines.  WG B3-17 Residual life concepts HV GIS (Convener - Chris Jones) New task on “Guide for the preparation of residual life concepts” has been completed, Working draft has been prepared, Canadian Participation: Toly Messinger – BCTC - corresponding member. Publications: Evolution of GIS into 21st century – final version – September 2006, Residual Life Concepts – brochure - May 2007 GIS – State of the Art 2008 – September 2009 ready for submission to SC.

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 8 AA 2 : Advisory Area “Gas Insulated Substations”  WG B SF6 Tightness Guide (Convener: Peter Glaubitz, Germany) This WG has close cooperation with IEC and IEEE: Contributions to IEC and , as well as IEEE P1712/D1 “Guide for SF6 Handling for HV Equipment. New working items: SF6 analysis for equipment condition assessment, Extension and maintenance issues on existing SF6 equipment, Direct connection between GIS and Transformer/cable, Use of alternative gases in factory tests to reduce SF6 emissions. End of life treatment of SF6 electric power equipment Activities: SF6 tightness guide – latest draft September Meetings: Erlangen (Germany) - Sep.2008, Lodi (Italy) – Nov. 2008, Baden-Daettwil (Switzerland) – Jan.2009, Berlin – March 2009, Oslo – May  WG B Mixed Technologies Switchgear (Convener: Wolfgang Degen, Germany) Study and comparison of advantages/disadvantages of MTS with AIS and GIS. Canadian Participation: Two Canadian Representative in this WG – Ms. A.M. Sahazizian, HydroOne, Mr. Toly Messinger, BCTC. Activities: Last meeting in Italy (Nov 2008). The brochure was published in Aug 2009 MTS Information – paper Electra – 2006/2007 AIS/MTS/GIS Comparison – paper Electra Aug 2009,

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 10 AA 2 : Advisory Area “Gas Insulated Substations”  WG B3-22 – Technical Requirements for Substations Exceeding 800 kV (Convener: Takeshi Yokota - Japan) This WG started in 2008 Objective: Review current knowledge and experience for UHV technology Cooperate with other CIGRE SC’s on AIS, GIS and MTS apparatus in UHV substations. Identify points of agreement between UHV substation and apparatus design. Identify and document best practices for maintenance of UHV substations. Canadian Participation: Unknown Activities: Meetings: Paris – Aug 2008, Gurgan (India) - Sep 2008, Sunninghill (South Africa) Dec 2008, Gurgan (India) - Jan 2009, Tokyo (Japan) Mar Deliverables: Brochure ready, to be published by Dec Electra paper published in Sep Slide 10

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 11 AA 2 : Advisory Area “Gas Insulated Substations”  WG B SF6 analysis for AIS, GIS and MTS condition assessment (Convener: Eamonn Duggan, Ireland) This WG has been started very recently Objective: Study of insulating gas analysis to identify clues regarding location of internal flashover faults, wear of contacts or Teflon cones, avoidance of unnecessary internal inspection of HV switchgear equipment. Determine the characteristics of the GIS that influence the content of gas samples and which gas components are most relevant in the insulating gas analysis. Recommend the most appropriate test methods and instruments to use in insualting gas analysis. Canadian Participation: Two Canadian Representative in this WG – Mr. Toly Messinger, BCTC., Mr. Nobby Fujimoto, Kinectrics. Activities: First meeting: Dublin (Ireland) - Jun Next meeting: Babenhausen (Germany) – Nov. 2009, Baden (Switzerland) - Apr Deliverables: Brochure and short report in Electra paper by end of 2011

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 12 AA 3 : Advisory Area “AIS Substations” This advisory area covers all aspects of design, operation, maintenance and life- cycle management of the primary installations of air insulated substations Specific subjects of expertise of this AA include: Design philosophy, Physical security, Environmental aspects, Renewal of existing AIS‘s, Management of shared substations, Mixed technology substations, in cooperation with AA2, Commissioning, Design quality control, Cost efficiencies of AIS The following WG/TF’s operate under the guidance of AA3:  WG B Cost Reductions of AIS (Convener: Koji Kawakita - Japan) Canadian Participation: Three Canadian Representatives in this WG Mrs. Anne-Marie Sahazizian – Hydro One, Mr. Toly Messinger – BCTC, Mr. Tibor Kertesz – Hydro One, Objective: To produce a set of guidelines for effective and efficient design, construction, and commissioning processes to minimize re-designs, re-works, and multiple checks and to present cost reduction opportunities achieved by using pre-engineered, pre-fabricated, pre- tested integrated equipment and installations typical for AIS, Activities: Brochure was published in 2009.

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 14 AA 3 : Advisory Area “AIS Substations”  WG B3-21 – Turnkey Substations (Convener: Tibor Kertesz - Canada) Canadian Participation: Three Canadian Representatives in this WG Mrs. Anne-Marie Sahazizian – Hydro One, Mr. Toly Messinger – BCTC, Mr. Tibor Kertesz – Hydro One, Objective: Development of guidelines for turnkey air-insulated substation projects involving construction of new substations, refurbishment and/or replacement of existing ones, focusing on increased availability and optimum project schedule. Contractor qualification/certification requirements. Review of experience with turnkey projects for AIS, documenting do’s and don’ts in case studies. Activities: Started in Berlin in Sep 2007, Draft was discussed in Prague (May 2007) and revised by the Canadian representatives during summer. Meeting in Paris (Aug 2008), Nagoya (Apr 2009) and Madrid (Aug 2009) reviewed latest draft. Minor clarifications outstanding. Deliverables: Electra paper and brochure will be published before 2010 Paris meeting,

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 15 AA 3 : Advisory Area “AIS Substations”  WG B3-23 – Guidelines for Uprating and Upgrading of Substations (Convener: Hiroshi Imagawa - Japan) Canadian Participation: Two Canadian Representatives in this WG, Mr. Toly Messinger – BCTC, Mr. Tibor Kertesz – Hydro One, Objective: Development of guidelines for uprating and upgrading air-insulated substations at each stage of planning, engineering, basic design, detailed design and project execution. Activities: Started in Paris in Aug 2008, Draft submissions were discussed in Nagoya (Apr 2009) and Madrid (Aug 2009). Case studies assigned. Next meeting in Dublin (May 2010). Deliverables: Electra paper scheduled before Paris meeting in Aug 2010 Technical brochure will be published by end of 2011,

Study Committee SC B3 CIGRE - CNC Toronto, October 2, 2009 Slide 16 My activities as SC B3 Canadian Representative  Active participation in the following WG’s: SC B3.15 – Cost Reductions in AIS substations – in addition to providing several chapters of the brochure and case studies, I and the other Canadian Representative (Mr. Tibor Kertesz – Hydro One), edited the entire brochure before publication. SC B3.20 – Evaluation of Different Switchgear Technologies (MTS, GIS, AIS) for Voltages > 52kV- in addition to providing a chapter of the brochure and case studies, I edited the entire brochure before publication. SC B3.21 – Turnkey Substations – in addition to providing several chapters of the brochure and case studies, I and the other Canadian Representative, edited the entire brochure before publication. SC B3.23 – Uprating and Upgrading Air-insulated substations – in addition to providing a chapter of the brochure and case studies, I and the other Canadian Representative, will edited the entire brochure before publication. SC B3.25 – SF6 Gas Analysis – corresponding member. Due to restraints imposed by my employer paid my own way to participate to the last two WG meetings  Contacts with other Canadian CIGRE members: Disseminating information on CIGRE WG’s to other members. Recommending new Canadian members to WG’s. Providing comments on ToR’s for new WG’s to the SC B3 Chairman and other Study C-tee members.  Published brochures/Electra articles with my name as contributor: Brochure # 390 – Evaluation of Different Switchgear Technologies. Brochure # 354 – Guidelines to Cost Reductions in AIS. Electra issue of Aug Evaluation of Different Switchgear Technologies. Brochure on Turnkey Substations – by end of Slide 16

Study Committee SC B3 CIGRE – CNC Toronto, October 2, 2009 Slide 17 CIGRE SC-B3 Paris Session 2010 – Preferential Subjects  New techniques/new design in substations Substations under strong constraints due to footprint and environment (severe climatic conditions). EHV/UHV substations Design and construction of substations for off-shore wind farms GIL as solution for mega-cities, off-shore connections and large structures (bridges and tunnels) Benefits of condition monitoring for decision support  Existing substations, new challenges Residual life estimation – risk assessment, replacement, refurbishment options Uprating of substations and existing equipment to increase network capacity Technical solutions for extension of substations on existing footprint Reducing the impact of substations on the environment and vice versa  New secondary system challenges in substations Experience with the shorter lifetime of secondary equipment compared with primary equipment Impact of “smart-grids” on substation design Practical experience with IEC as process bus in relation to life time issues