CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013.

Slides:



Advertisements
Similar presentations
Install L2 Switch Head End CATV
Advertisements

Goals and status of the ATLAS VME Replacement Working Group Markus Joos, CERN Based on slides prepared by Guy Perrot, LAPP 19/09/2012.
Mr C Johnston ICT Teacher
H2 Layout for EMU a brief report of a couple of visits by Darin A., Jay R., and FG.
C. Fernández Bedoya, A. Navarro, I. Redondo. C. Fernández Bedoya November 29th, Goal: Replace SC crate with simple CuOF electronics and place TSC.
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Optical Fiber Testing Paul Minko EE 566 Oct. 22, 2003.
1 Daya Bay Muon system Installation Workshop, IHEP, July 14, Updated RPC Gas System Installation Plan Changguo Lu Princeton University.
Problems with UPS racks last week... During the DSS tests on the weekend Jun 1-2 all racks connected to „interruptable“ UPS were cut by DSS at some point.
1 Fiber Optics FIBER OPTIC PATCH PANELS. 2 Fiber Optics Just like our copper cable plant the fiber cable plant incorporates many of the same hardware.
How to Build a CAN Last Update Copyright Kenneth M. Chipps PhD 1.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky : TIM PCB1 ATLA S SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics Martin.
Electronic Systems Support Demonstrator Racks Rack coordination meeting 12 October 2004.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
Adders in drawer Test of TileCal Level 1 Interface drawer patch panel trigger cable ca 70 m receiver pre-processor TileCal patch panel RP patch panel TileCal.
Costas Foudas, The Tracker Interface to TCS, The CMS Silicon Tracker FED Crates What goes in the FED Crates ? What do we do about the VME controller.
Beam Line BPM Filter Module Nathan Eddy May 31, 2005.
October, 2009 Controls System Kevin Brown/Brian Oerter October, 2009 Internal Review.
Network infrastructure for CERN DataCenter HEPiX Fall 2015.
1 OperationsOperations CSC is stable running since HI run has started. The low CSC occupancy in HI running allows us to operate all HV channels at nominal.
Installation status Control Room PC farm room DetectorsEB Infrastructure 918 ECN3.
Expt. Area meeting – December V. Bobillier1 Cabling installation status.
ATCA cooling tests Claudio Bortolin (PH-ADO) Damian Dyngosz (PH-DT) George Glonti (PH-UAT) Julian Maxim Mendez (PH-ESE) Lukasz Zwalinski (PH-DT) xTCA IG.
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Infrastructures and Installation of the Compact Muon Solenoid Data AcQuisition at CERN on behalf of the CMS DAQ group TWEPP 2007 Prague,
Status of the NA62 network R. Fantechi 23/5/2012.
Activities of 2008) Jinsook Kim, Yongwook Baek 1.
FED optical cabling issues Matthew Pearson. Meeting with Jan and Francois at tracker week Discussed the TTC splitter and optical cabling paper design.
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
ATCA COOLING PROJECT INTERSHIP FINAL PRESENTATION Piotr Koziol.
February 26 th 2013Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
R. Fantechi 2/09/2014. Milestone table (7/2014) Week 23/6: L0TP/Torino test at least 2 primitive sources, writing to LTU, choke/error test Week.
Status of integration in USA15. Status of rack layout 20/03/2015FTK Italia - A. Lanza2 Rack Y A2 equipped with turbine cooling system and nominal.
TRD Gas System Layouts Production Readiness Review 03 – Nov F. Hahn.
Possible replacement of VME Philippe Farthouat, CERN.
Muon works in the next months. MDT Up to May 15 Commissioning of EE From May 15 for (at least) 2 moths DCS works – Installation of new hardware – New.
Detector Safety System overview DSS is a PLC based system designed to protect ATLAS detector from damages. Front end (hardware) 2 redundant PLC ~700 input.
S A Griffiths CM42 June 2015 Electrical & Control.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
Rack Design Proposal as of 01/03/2013
FTK infrastructure in USA15 Status and plans for 2015 A
ATF2 Magnet Power Supplies
Fiber Installation for RUN 3&4
TTC System Status May 2007 System overview Production Status
ACS news Circulator TCU: control tests in progress All cavity racks
SCT/Pixel Draft Rack Layout rcj
Pierluigi Paolucci - I.N.F.N. Naples
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
TileCal ROD Commissioning Counting Room Installation
Status at CERN and commissioning
Pierluigi Paolucci & Giovanni Polese
TTC Fiber Distribution
Prepared for CSC by Fred Borcherding FNAL
Presentation transcript:

CSC upgrade for LS1 USA-15 rack: layout, construction and installation 11 th February 2013

Network ports Rack Y A1 includes a 24-port switch: S IP51. The new system requires three ports: 2x TDI and shelf manager. Currently, there are six ports available. Silvia Batraneanu (net admin) carried out a survey of users of the switch to find out what their requirements are for LS1 and Phase 0. One extra port will be freed as well as the two used by the CSC sbc. Also, there is enough ports in the control and data switches for the two extra ROSes in case we need them.

Fibers Layout: – Break-out cables (SC to MPO) from chambers to patch panel in wheel structure. These cables are different in length. – 80 meter cables from patch panel to USA-15. – Extensions to make up for the different lengths of the break-out cables. – Extensions + break-out cables = 13 meters. – Total = 80 m m. = 93 meters.

Fibers The extensions will be kept so that the length from chamber to patch panel is the same across all fibers. Re-commission the existing fibers: – Borrow a light meter and optical reflectometer (OTDR) from the TTC group. – Measure length and attenuation of each fiber. If need be, terminate cables (who, where?). Buy or manufacture a patch panel and install it in Y A1.

Fibers Buy two sets of 48 cables (key/up - key/down): – Patch panel to VME crates = 10 meters. – Patch panel to ATCA shelf = 3 meters. – George Mikenberg will order fibers for RPC and MDT to Fibernet on the 18 th of Feb. Join this order. Move data/control fibers from Y A1 to Y A1. This will be done by Sergei Malyukov‘s team under our supervision. Clean up rack Y A1. Y A1 will be freed by the 22 nd of February.

TTC crate After talking to Thilo: – There is not need to acquire a new TTC crate. – Currently, TTC Ex modules are very difficult to obtain – albeit this situation will change as CMS will do without them during LS1. – We can use the available outputs in TTC Ex (8 free) to feed the COBs and the inputs in the ROD Busy module. – Both systems can run independently or together. This would be controlled by software. Thilo would help. Move TTC crate from Y A1 to Y A1.

Rack Includes: – ATCA shelf: 14U – TDI x 2: 1U x 2 = 2U – TTC crate: 6U – F/O box: 3U Heat exchangers provided by OPM. Fan tray needed? If so, we need to get one. Wiener fan trays come with the DCS interface (CAN). Blade servers do not need special cooling. Provide plan/design to Martin within the next two weeks: power consumption, power dissipation, etc.