SC 17A Task Force Summer Meeting Presentation June 2013.

Slides:



Advertisements
Similar presentations
Accreditation Liaison Officers (ALOs)
Advertisements

Status report for revision of API 17F (ISO )
API 17 A Winter session 2013 Report. API17A Formation of task groups WE ARE REQUEST ING VOLIUNTEERS FOR EACH TASK GROUP Task Group 1 Overview systems.
API Specification 16C Choke and Kill Systems Expro 2014 John W. McCaskill, P.E. Senior Technical Advisor Expro PowerChokes
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
Profiling Working Group 1 PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting November 6, 2007.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
Getting SMARTer: The evolution of Project Management within Victoria Police Doug Witschi.
API Subcommittee 17 Industry Standards for Subsea Equipment
API Standard 6X: Design Calculations for Pressure-Containing Equipment
Credentials Committee Orientation. Responsibilities of the Committee Review the credentials of all applicants to the Medical Staff and privileges requests.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
API RP 17 N Update Subsea System Reliability and Integrity Management Presented by: Mark Siegmund - API 17N Chairman Jan 18, 2011.
1 Update from ERCOT Retail Market Services to RMS Additional Material February 12, 2004.
Kent Grebing, API SC 16 Chair
1 TDTWG Update to RMS Tuesday January 6, Primary Activities 1.Reviewed ERCOT System Outages and Failures 2.Presented Service Availability and.
Recommendation of Informal work group for changes to Weld Overlay requirements in API Spec 6A Chairman - Mike Briggs (Cameron) Members – Tim Haeberle(GE),
SC14 Report to the SC13 Plenary Larry Schultz, Chairman Erin Cliggett Kahn, Secretary 17 June 2008.
The TNI National Environmental Laboratory Accreditation Board Update Daniel Hickman, NELAP Board Chair.
Legal Status Data Legal status project and relating developments in CWS Patentscope Users Forum June 18, 2013 Angel López Solanas.
DEX Publication Project OASIS PLCS TC Face-to-face meeting 1 October 2007 Trine Hansen.
DEX Publication Project OASIS PLCS Telecon 27 November 2007 Trine Hansen.
WG or TG # SC17 Liaison Report Mohsen Shavandi / Virgilio Garcia Soulé SC17 Liaisons Update from SC18 Summer 2013 Meeting January 2014.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
SC18:TG8 API Specification Q1 Guidance Document.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
TSG-S OMA (Open Mobile Alliance) Ad-Hoc Report Richard Robinson Chair - 3GPP2 TSG-S SC B_Eshwar Pittampalli’s (Lucent) comments/concerns embedded.
LCG CERN David Foster LCG WP4 Meeting 20 th June 2002 LCG Project Status WP4 Meeting Presentation David Foster IT/LCG 20 June 2002.
Status: Draft Status report for revision of ISO (API 17F) Winter meeting Houston January 2010.
San Francisco, CA. SC8 Liaison Report
1 Move-In Move-Out Task Force Update to RMS May 15, 2003.
May 15, 2009 Regional Planning Group CREZ Implementation Study Update Warren Lasher Manager, System Assessment.
RMS Update to TAC October 2, RMS Update to TAC TAC Confirmation Vote Request Kyle Patrick of Reliant Energy and Independent Power Marketer segment.
Lead from the front Texas Nodal 1 Early Delivery System Testing Environments & Planning – Involving Market Participants TPTF May.
Reports / Updates From Task Groups / Liaisons Material Test Lab Calibration & Certification David Salgado reporting for Tim Haeberle 9 February 2010.
Status: Draft Status report for revision of ISO (API 17F) Summer meeting Washington June 2010.
Photos by Susie Fitzhugh Bell Times Analysis Task Force Review, Update and Recommendation Subgroup 5/14/2015.
28 May 2010 HMA-FO Task 2: Feasibility Analysis Service HMA Follow On Activities Task 2: Feasibility Analysis Service (Sensor Planning Service) Monthly.
Operational Excellence Quality and Customer Experience Operational Excellence Quality and Customer Experience SC18 Liaison report for SC6 Rick Faircloth.
Reported by Ron Prwivo for Ian Robson. Overview Response to Recommendations from the RLSR of November 2014 – very good, RF staffing remains an issue Very.
API 19 CI Chemical Injection Devices for Downhole Applications
Commercial Operations Sub-Committee Update to TAC
API 17X Subsea Boosting January 13, 2015
TG Chair: Mark Brinsden Shell
Updates from SC18 Summer Meeting
SC 6 Task Group 1 Pipeline and Valve Standards Status Report
API Subcommittee 17 - Specification 17D January 2016 Status
Recommended Next Steps and Timelines
Task Group Status January 2014
API 17V – Subsea Safety API 17V January 2014 By Christopher Curran
Task Force on Seasonal Adjustment of Quarterly National Accounts Item 3.1 Recommendations 2002: Implementation and items for review in 2007 Henning.
New API Design Standard
First 8 slides are what was presented in San Fransisco…
API 17P TASK GROUP January, 2015.
API 17H TASK GROUP January 15, 2013.
Employee Performance Management System (EPMS)
API 17P SUBSEA STRUCTURES & MANIFOLDS
API 17P SUBSEA STRUCTURES & MANIFOLDS
Approach to Market Cutover - Draft for Discussion
API 17O HIPPS Task Group Status June /20/2019 API 17O HIPPS.
Discussion Points API RP 17A Task Group Members
API SC 10 WG15 Stage Cementing Collars
API Subcommittee SC-6 Discussions Valves and Wellhead Equipment
Technical Communication
API RP 17Q Status January, 2014 First Edition issued June 18, 2010
Task Group Status January 2013
Status report for revision of API 17F
API 17H TASK GROUP June 26, 2013.
API 17P TASK GROUP 13 June, 2012.
API 17P TASK GROUP June 26, 2013.
Presentation transcript:

SC 17A Task Force Summer Meeting Presentation June 2013

SC 17A Task Force Progress The task force has been well supported February 21 st (full team meeting) Reviewed Action Plan and Schedule Decided to adjust strategy of review by section Full group to review complete document. It was agreed the default position was to accept recommendations from joint task force. Requested comments/issues/exceptions to be raised prior to the next meeting April 25 th (full team meeting 3hrs) Line by line review - Good progress (approx. 50% complete) Stopped at Material section Minutes with attendees from both meetings included in report

SC 17A Task Force Next steps Establish liaison with materials group and resolve (full) adoption of current recommendation (latest version) Present status at Summer meeting SeptemberComplete task force review October Issue Changes to API for reformatting and distribution

SC 17A Task Force Round table discussion (Tuesday) Report out from materials group Does a detailed materials section belong in 17A? Should there be a separate materials document? Is the level of detail in the materials section consistence with other sections in 17A? Is the materials section complete and up to date and can/should it be adopted in full (it was inserted >18 months ago)?

SC 17A Task Force Participants February Meeting John Allen (Independent), David Bell (Bechtel), Gene Eubank (Dril- Quip), David Izon (BSEE), Oskar Kudla (BP), Giancarlo Mangiafico (ENI), Nigel McKie (BP), David Morgan (Cameron), Winston Okraku (BP), Ron Pfluger (Cameron), Forrest Scott (Genesis), Ian Still (Shell), John Upchurch (Technip/Genesis) April Meeting John Allen (Independent), John Bednar (BP), David Izon (BSEE), John McManns (Aker Solutions), Nigel McKie (FMC), David Morgan (Cameron), Winston Okraku (BP), Forrest Scott (Genesis), Mohsen Shavandi (DNV), John Upchurch (Technip/Genesis), Mike Williams (FMC), Richard White (INTECSEA),