Troubleshooting Training Course.  Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical.

Slides:



Advertisements
Similar presentations
T-Mon SERVER CONNECTOR
Advertisements

CL100D series DSP controlled Uninterruptible power supplies.
MHSL - Dolphin Training Class
PC Encryption installation progress/password screen Includes comments from: Encryption team Sarah Deane Tony Stieber Selected people who took part in the.
X-Call Version V3.0 User Guide
GE job title/1 GE internal information - Not for external distribution 1 GE Security EMEA NPI template – v1 1X Series (phase 1) Conventional Fire Panel.
LogTag Training January 2015
InnoSys Process Sequence. End Effector Components End Effector Prox Switch Load Cell Wire Conduit Crows Foot Nut Runner.
© 2010 APM Automation Solutions Ltd. All rights reserved. APM Automation Solutions Ltd. 11 APM Customer Support Technical Training Part 5 Operation & Troubleshooting.
Do’s and Dont’s - How to Prevent Troubles iConnect / CommPact
10 February Viewing Controller Status. 10 February Controller Status Provides a “snap shot” of the current configuration of controllers on.
ST/SEU-CO | | © Robert Bosch GmbH reserves all rights even in the event of industrial property rights. We reserve all rights of disposal such as copying.
Tool removed during cycle Fault #2 Conditions for setting Tool cocked prox switch goes open during cycle AND force on load cell drops below limit in fault.
Mobileye Setup Wizard Version User manual
Startup Training – TPS3 15. Siemens TPS3 Startup Training 2 Topics Covered  Visual Inspections  Verify environmental requirements are met  TPS3 15.
ComfortLink II / AccuLink Zoning
1 Lab Equipment. 2 TopicSlides DC Power Supply3-4 Digital Multimeter5-8 Function Generator9-12 Scope – basic controls13-20 Scope – cursors21-24 Scope.
DP Cabinet.
January 2015 SlimLine XR ITS 2.
DCRK DIGITAL POWER FACTOR CONTROLLERS
CheckSystem 2.1 Portable Test Systems Page 1 April 2011.
MZ790 Print Driver and RINC Software Install and Setup These instructions are to assist you in installation and setup of the MZ790 Print Driver and RINC.
Copyright © 2013 FingerTec Worldwide Sdn.Bhd. All rights reserved.
June 5, 2013 XenClient Enterprise 5.0 Engine VNC Remote Access.
Part 1 Using the ARM board And start working with C Tutorial 5 and 6
9000U Quick Guide Marketing & RMA Department XELTEK 8/28/2015.
TRANSMILLE PATs The New Alternative To Fast, Easy & Efficient Portable Appliance Testing.
GML-3 GPRS BASED METER AND LOGGER THREE PHASE METER WITH INBUILT DATA LOGGER © Embuilt Technologies Visit us at Or For.
FG Wilson Access 4000 Control Panel
VGD-33 single unit upgrade to parallel system All single units must work properly Installation of the external cables and power cords: all should be connected.
Single Loop Analogue addressable fire control Panel
Installation And Troubleshooting Guide. PHONE REQUIREMENTS High Speed Internet Connection Using DSL Modem, Cable Modem or Wireless Canopy With a minimum.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
1 of 8 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
Date: File:PRO1_12E.1 SIMATIC S7 Siemens AG All rights reserved. Information and Training Center Knowledge for Automation Troubleshooting.
FIX Eye FIX Eye Getting started: The guide EPAM Systems B2BITS.
IT1001 – Personal Computer Hardware & System Operations Week5- Installation and configuration of driver software.
Our Vision. Your Safety ™
Quick guide to ASIMON configuration For version 3.0 or greater SAFETY AT WORK Date: 3/18/2009.
Rev Server blade enclosure overview Power backplane Signal backplane Management module Reset Bottom.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
SmartMQn Motor Protective Functions Ken Jannotta Jr. Horner APG, LLC.
CHAPTER Windows Server Management. Chapter Objectives Give an overview of the Server Manager Provide details of accessing the Server Manager Explain the.
Important! Be sure to connect the communication cable to your computer before opening the Aqua4Plus Lite software. (Click to continue)
Tool Removed During Cycle Fault #2 Conditions for Setting Tool cocked prox switch goes open during cycle AND force on load cell drops below 5 lbs. Active.
SNG via Webinar. Where’s Webinar??  Double click Aflac 2000 folder  Highlight “SNGWebCommunicator”  Right Click and “Send To - Desktop”
S V.MOUNICA 09551A0294.  To increase the distribution rate of present electric supply which is 70% to 100%.  Improving the supply to house holds without.
Alarm units AL 175 NT and Aeon Gold For small, medium and large power range.
ISite Main Window Open iSite v7.0 from your laptop (the Main window will appear) Auto-Discovery occurs on if connected to a iNFINITI Modem via a LAN, port.
Basic Troubleshooting FC 100/200/300. | Confidential/Property of Danfoss Drives A/S | Sunday, 12 June 2016 | 2 Main Session Topics Required Tools and.
All Freezer Advance. When the Freezer is first supplied with power or if a power outage occurs, the display will indicate this by flashing the temperature.
Software Troubleshooting Eliminate possible programming and timing errors by stopping all programs ( and ). Use the Executive program terminal and send.
/Reimage-Repair-Tool/ /u/6/b/ /channel/UCo47kkB-idAA-IMJSp0p7tQ /alexwaston14/reimage-system-repair/
The products of this company are quite reasonable as well as durable. One such is used by me these days and it has a long lasting battery, clear picture.
POWER FACTOR CORRECTION
About the To-Do Bar in Outlook
POWER FACTOR CORRECTION
PTS 3.3 C Portable Test System.
Fundamentals of Harmonics
Tool removed during cycle Fault #2
K TO 12 CHS MODULE FOR GRADE 9, PP
iSERIES PROGRAMMING/LOGGING TRAINING
Apple TV Error. Check Here.
Not able to Find Videos on TV Screen with Roku Streaming Player. Here's guide for you.
How to Fix a “Scanner Failure” Message Error when Copying, Scanning, or Faxing?
The BioTector B3500ul TOC analyzer Process Tests
Always Connected introduces Tigo SMART 3.1 This guide is interactive!
Digital Chart Recorder Operation
Training Module Introduction to the TB9100/P25 CG/P25 TAG Customer Service Software (CSS) Describes Release 3.95 for Trunked TB9100 and P25 TAG Release.
Model Output Current Battery Life BATPSU VDC 2A 1.2Ah BATPSU VDC 2.3Ah
Presentation transcript:

Troubleshooting Training Course

 Visual and General Test  Perform System Test (Mode  Perform System Test)  Identify The Error  If you need Technical support write down the results of this test before you contact technical support

 Automatic Error Detection  Automatic and manual self test that test all errors and can locate the exact phase and group of the fault.

 E3– Unable to Connect Capacitor Group  E5- Misfiring  E6- Network Synchronization  E7- Over Temperature  E10-Resonance

 Errors that do not disable the system completely will be indicated in the upper section of the controller screen and will indicate to which group the error is associated.

 Errors that disable all of the system operation will be displayed on the main section of the controller screen.

 Unable to connect Error  Monitored Signals: X (reactance) of the connected capacitor(s), on all three phases.  Averaging/Delay: 8 consecutive network cycles of exceeding the limit.  Limits: 10% from nominal value.  What action is taken: The particular group is disconnected and disabled.  Error Reset: Automatically (see below) or manually by activating self test.  Automatic Reset Delay: The system repeats the self test on defective groups only, after 1 minute. If the same groups are detected faulty again, the test repeats after 2 minutes and the interval is doubled each test until maximum 10 repeats (with delay of 512 minutes = 8.5 hours). If the result of each test is not identical to the previous one – the repeat interval is set back to 1 minute.

 Find Errors and Locate the source of the fault (group and phase )  Mode  Perform System Test Mode of Operation Menu Measuring Screen

Group Test Report Screen Group Details Screen - Group OK Group Details Screen - Group with Error 3 Background Readings

controller Switching Module Firing Fuse Bus bars Fuse Power Supply

 Led Tester  Firing signals are the signals that the controller sends to the Switching modules in order to open the Thyristors

 Misfiring  Monitored Signals: THD of capacitor current in the first two phases.  Averaging/Delay: 2 consecutive network cycles of exceeding the limit.  Limits: 300%.  What action is taken: The particular group is disconnected and disabled. If detected during normal operation – self test is activated.  Error Reset: Automatically (see below) or manually by activating self test.  Automatic Reset Delay: The system repeats the self test on defective groups only after 1 minute. If the same groups are detected faulty again, the test repeats after 2 minutes and the interval is doubled each test until maximum 10 repeats (with delay of 512 minutes = 8.5 hours). If the result of each test is not identical to the previous one – the repeat interval is set to 1 minute.

 Test all the relevant firing cables and connectors disconnect and reconnect the connectors and test the system again.  Disable E5 and test if the system works properly now, test the Thd of the network if it is very high maybe the E5 should be disabled.  If this is not the case the controller firing card or the SWM firing card are the next suspects.  Sometimes because of E3 in one phase E5 can be detected but the cause is E3, reactors shortcut can also cause E5.

 Network synchronization  Monitored Signals: L1-L2 Voltage (in three phase system).  Averaging/Delay: 500 consecutive network cycles of internal PLL synchronization error.  Limits: Internal PLL failed to synchronize to signal.  What action is taken: System disconnects.  Error Reset: Automatically.  Automatic Reset Delay: 250 consecutive network cycles of error-free PLL operation.

 Test the voltage in L1- L2 terminals of the controller (with a multimeter) a valid voltage signal Should be detected.  If a valid voltage is not detected make sure that the controller will receive the signal.  If there is a valid voltage in the terminals the controller should be checked.

 Over Temperature  Monitored Signals: External Thermostats.  Averaging/Delay: Immediate.  Limits: Depends on external thermostats.  What action is taken: System disconnects.  Error Reset: Automatically.  Automatic Reset Delay: Immediate.

 55° Thermostat Activates an Deactivate the SWM Fan  85°C and 120°C Thermostats Deactivate the whole System controller Switching Module 55°C Thermostat 85°C N.O Thermostat 120°C N.C Thermostats Reactors

 Resonance  Monitored Signals: Mains and Load current, on all three phases and 63 harmonics.  Averaging/Delay: 10 consecutive network cycles of exceeding the limit, counted for each phase and harmony separately.  Limits: I MAIN -I LOAD >X%*I CAP(NOMINAL). X% is 50% for normal limit and 30% for sensitive limit.  What action is taken: System disconnects.  Error Reset: Automatically.  Automatic Reset Delay: The system disconnects for 10 seconds for first occurrence and doubles the time for each occurrence happened within 20 seconds from the end of previous disconnection, until a maximum of 3000 seconds.

 Measurements must be performed and analyzed to understand the source of resonance.

 Menu  System Setup  Site Installation  Modify The Above  Next few times  in Error Detection screen chose Customize  disable the needed Errors

 L C M – Load Caps Mains  What is it used for? To see if the system is connected and measuring correctly.  Menu  L C M Combined  Total KVAr Meters  Mode  Manual insert one group manually  Expected results after inserting the group:  Load should not change  Caps should show the expected KVAr from this group  Mains should show the former value minus the Caps Value

 Test that the measured currents match the expected currents

 Menu  System Information  Events  The Events log, saves all system events, Errors, changes in status changes in setup, power losses, etc… And the time and date of these events.  The Events log can help us understand the source of a problem  The Events log can be downloaded into a computer

 The controller needs to have a communication Card, if there is no communication card use the Service Card  The communication protocol is RS-485 Com to RS485 AdapterPCMCI to RS485 AdapterService Card

 Tools  Led tester  Service card  Laptop Computer  Communication Adapter for the Laptop  Multimeter  Current clamp  Fuse for the Switching module  Fuse for control module  Power Fuse  Optional: firing cards, switching module, Capacitors