Calibration Stand Update

Slides:



Advertisements
Similar presentations
IMO 107(49)/46 CFR ppm Bilge Separators 15 ppm Bilge Alarms
Advertisements

S4 Select Storage Solutions Scotland State of the art Storage facility offering all ICH and non ICH conditions as required.
Helping Customers Lower TCO through Flowserves Technology Advantage Helping Customers Lower TCO through Flowserves Technology Advantage Web Portal Web.
JJ, your No.#1 high quality manufacturing source ! Electrical Products Since 1998.
Validation and Verification of CDM Projects Climate Change Kiosk on CDM/DNA, COP9 December 6, 2003 Marco van der Linden SGS Climate Change Programme.
1 HYDROSTATIC TESTING Approved for Public Release.
World Health Organization
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
The Acquisition / Payment Process
3051SMV Transition.
MTS Delivery Development © 2009 IBM Corporation EMEA GLOBAL Total Microcode Support (GTMS)
Twinning Project RO2006/IB/EN/09 1 Saxony-Anhalt State Environmental Protection Agency Wolfgang GarcheBukarest Wolfgang Garche Saxony-Anhalt.
World Health Organization
Component Rebuilds John Richards Cashman Product Support Representative Lyle Kibbe Cashman Service Supervisor A Guided Tour Through Cashman Equipment.
FSTS “water hammer” Running mode Pressure profile of the “water hammer” pulse – Joukowsky Equation FSTS Running worst case scenario : – instant closing.
Introducing Belliss USA Inc.
TECHNICAL AND TECHNOLOGICAL CAPABILITIES OF TEST BENCH.
Offshore Safety Directive (OSD)
This teaching material has been made freely available by the KEMRI-Wellcome Trust (Kilifi, Kenya). You can freely download, adapt, and distribute this.
Transmille Training Quality System.
RBNetERP or Enterprise Resource Planning is a software that allows companies to integrate all their operations and resources and manage them through one.
Empowering Business in Real Time. © Copyright 2009, OSIsoft, LLC. All rights Reserved. Regional Seminar Series Houston October 28, 2009 Flowserve’s Technology.
Water | Slide 1 of 16 January 2006 Water for Pharmaceutical Use Part 4: Commissioning, Qualification and validation Supplementary Training Modules on Good.
Qualification of HVAC systems
Hallmark Certification. Agenda Ten Year Certification  Term of Certification Background 1.4 year term of certification 2. 8 year term of certification.
Experts in e xtending Oracle e -Business Suite e nrich IT 1/16/2004VMI1 Vendor Managed Inventory (VMI) Presenter: Arul Murugan, CPIM.
Updates to Our NACE Offering
WELCOME The Fixed Fire Suppression Systems. We carry out the supply installation & Annual required maintenance in regard to the fixed.
EESIFLO International Pte Ltd
World Health Organization
NTS to LDZ Meters – Audits & Validations Created by Alison Chamberlain on behalf of Transporters, for meeting 6 th August, 2010, 31 Homer Road Solihull.
NEL Oil, Gas & Chemicals Gregor Brown Business Manager Oil, Gas and Chemicals.
Offtake Metering Errors Stephen Skipp Asset Manager (Transmission and Storage)
Wilderness Rim Association Water Rate and Reserve Study Board Meeting April 23, 2014 Presented By: Chris Gonzalez, Project Manager.
Emco Tech - World Class Products Since 1970 EMCO TECH CO., LTD. INTRODUCTION Emco Tech Co. Ltd.
California Air Resources Board Workshop November 3, th Street, Room 202 1:30 - 3:30 p.m. Aboveground Storage Tank Enhanced Vapor Recovery.
ISO / IEC : 2012 Conformity assessment – Requirements for the operation of various types of bodies performing inspection.
Customer Tracking System. Lucent designs, manufacturers and sells telecommunications networks and equipment to communications service providers Challenge:
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
14-Dec-15S.Movchan Straw manufacturing and QC1 Straw manufacturing procedure and QC tape and straw parameters specification conditions of straw production:
Sales Training Update Laura Gonzalez
World Leaders in Combustion Management Solutions Module Gas Setup Introduction The Mk7 E.G.A Cell Status Further Information.
ESS WP 12 Project Management & Capabilities Overview Neil Bliss Projects & Mechanical Engineering Group Leader ESS PDR, Lund, 10 th November 2015.
Doane Pet Care Company Pet Food Safety System (PFSS) M.W. Merkel September 23, 2003 Animal Feed Safety System Public Meeting.
1 1 Presenter / date if required Independent, integrated thinking.
Concrete Weight Coating Plant “Aladja”
Module 14Slide 1 of 23 WHO - EDM Basic Principles of GMP Active Pharmaceutical Ingredients Part Three, 18.
ISS Commercial Resupply Services Michael Suffredini ISS Program Manager June 17 th, 2009 Augustine Committee UPDATED: Corrected page 10 (replaced “first.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
POIWG 1/26/2015 Mana Vautier This presentation is intended solely for the audience to which it is directed. MISSION AND PROGRAM INTEGRATION (MAPI)
The complete flow monitoring solution Measure – Display – Switch – Transmit.
Laboratory equipment Dr. W. Huisman Cairo, November 21th 2012.
Micro Motion, Inc. Gas Measurement.
INTER TERMINALS LTD Liquid Waste Solutions for the Shale Gas Industry 18 March 2015.
Washington DC 14 December 2009 Standardization Power Christopher Loeser Distribution Statement A: Approved for Public Release.
INTER TERMINALS LTD 13 April Inter Terminals Wholly owned subsidiary of Inter Pipeline 12 Bulk Liquid Storage Terminals in UK, Germany,
APMP TC Fluid Flow Initiative Project Traceability Scheme Study for LPG Metering Final Report at APMP 2012 TCFF Meeting Chun-Min Su CMS/ITRI, Chinese Taipei.
GLOBAL CAPTURE AND MANAGEMENT OF DATA Devising the solution, delivering the promise proven solutions for creating time in a busy commercial world Corporate.
“Supply Chain Management Handbook” Supplier Selection and Capability Assessment Model IAQG Leader: Christian Buck – Safran Updated: June 2008.
Intracompany Stock Transfer Scenario Overview
District-Wide Well Maintenance, Rehabilitation, and Repair
Intracompany Stock Transfer Scenario Overview
Air-Cooled Chillers (ACCL) and Water-Cooled Chillers (WCCL) Certification Program Update 2018.
Intracompany Stock Transfer Scenario Overview
ETS – Air Data submission Training
BOP FLUID FLUSHING SIMON McMANUS WM CANNING LTD.
Value from Measurement Schematics
TIPS- Nominations.
Sizing and Product Code
Presentation transcript:

Calibration Stand Update Calibration of Liquid Density Meters at Combined Temperature & Pressure Calibration Stand Update Tony Wright Customer Services Manager

Agenda Background Project requirements Calibration Process Current status Test plan New equations Calibration approvals Calibration of customer’s 7835’s Summary

Background for New Calibration Strategy DECC (Department of Climate Control) in the UK requested all densitometer manufacturers and Oil companies in the North Sea to launch a project “JIP” (Joint industry project) to understand the behaviour of temperature and pressure effects on Liquid Densitometers and to develop a new calibration strategy. TUV NEL ltd, as an independent calibration facility, were contracted to test and validate Liquid Densitometers at combined temperature and pressure. The calibration facility used 4 transfer standard fluids across the temperature range from 20⁰C to 100⁰C and from atmospheric pressure to 100 bar. From the NEL testing, it was concluded that there is combined pressure and temperature effect during elevated temperature and pressure operating conditions which need to be taken into density calculations. DECC then released an instruction stating that Liquid Densitometers should be calibrated at their anticipated operating conditions, i.e. simultaneously at temperature and pressure, using one or more transfer fluids, the density of which has been determined across the required temperature and pressure range with an uncertainty not exceeding 0.01%, directly traceable to national standards.

Project Requirements Objective and Scope Provide a production calibration stand(s) for combined temperature/pressure density calibrations. 3 different fluids: Silkospark (current Slough calibration fluid [machining fluid] ~ 825 kg/m3) Sebacate (~960 kg/m3) Sodium Bromide – (~ 1400 kg/m3) Combined P+T for two fluids (Silkospark, Sebacate) at 20°C – 0,50,100,150 bar 80°C – 0,50,100,150 bar 20°C at 1 bar A calibration on Sodium Bromide (stand to be capable of combined P+T if required) Double capacity of current calibration stands

Calibration Process Flow Steve/Bob to provide flowchart of calibration steps for various options

New Stands Schematic Overview

Current status Original promise date July 2011 Slippage due to: Damage in shipping Design changes during testing Pressure test rig commissioned Cleaning station commissioned All calibration stands fully functional Modifications completed Testing and commissioning re-started Similar system under test in MMI Boulder

Pressure Test and Cycle Hydro Stand Hydrostatic pressure test rig Rig will be used on all new and repair 7835’s to: Pressure test each sensor to 1.5 maximum operating pressure Pressure cycle each sensor for 30 times to maximum operating pressure

Cleaning Station Designed to flush out calibration fluids Up to 3 x 7835’s each cleaning session 3 stage cleaning process

Liquid Density Calibration Stands Combined Pressure and Temperature

Test Plan Stability and repeatability tests on distilled water Change water to calibration fluids Repeat stability and repeatability tests Monitor for cross contamination Validate calibration results against Engineering Dept combined P+T calibration stands Current production calibration stands UKAS laboratory (also monitor contamination of fluids) Send fluid samples to external UKAS Laboratory to determine effect, if any, of contamination

New Density Equations All major flow computer manufacturers contacted Existing format certificates will continue to be available for limited pressure and temperature ranges Dp = Dt * (1+K20*(P-1)) + K21 * (P-1) K20 = K20A + K20B*(P-1) + K20C*(P-1)^2 K21 = K21A + K21B*(P-1) + K21C*(P-1)^2 Dpt = Dp * (1+K22*(t-20)*(P-1)) + K23*(t-20)*(P-1) K20A,K20B,K20C, K21A,K21B,K21C Calibrate on new calibration stands on 2 fluids at 20 °C for each unit K22, K23 Calibrate on new calibration stands on 2 fluids at elevated t&P for each unit Optimum Solution Equations New calibration stands

Calibration Approvals Our current ISO17025 (UKAS) calibration laboratory has been in operation since 1981 20 Deg C and 1 Bar A Will apply for ISO 17025 for new stands Traceability through current UKAS Laboratory Liquid P+T via 3rd party approved laboratory Planned schedule for approval application is 6 months from release of calibration stands On receipt of approval, we will apply for MID approval using new stands

Re-calibration of Installed 7835’s All installed 7835’s can be re-calibrated on the new stands to DECC requirements 7830’s are not supported Fiscal (Micro Motion business partner) has built and installed a new 7835 cleaning facility Operational from December 2012 Over-check to include air-check and detailed visual inspection prior to despatch to MMI Slough

Summary Functional testing of complete system has started Calibration stands will be fully commissioned by mid January 2013 Existing stands will then be decommissioned Stands are designed to fully comply with DECC requirements Plan to have new calibration stands approved to ISO 17025 by mid 2013