RURAL EMPOWERMENT Through Biogas Entrepreneurship.

Slides:



Advertisements
Similar presentations
Gobar Gas Plant construction
Advertisements

Anaerobic Digestion PAK RENEWABLE ENERGY
Site selection and setting out Biogas ToT Course May 10 – 15, Kampala, Uganda.
Regional Digester Manure and Food Processing Waste.
Linear Programming Problem
Cost of Municipal Services : ‘Best practice’ benchmarking of operating costs.
A Potentially Valuable Component of Texas Bioenergy Projects
Animal Waste to Electricity COW POWER We Work 24/7 Animal Waste to Fertilizer Animal Waste to Fertilizer.
LP Gas Chain Distributor to End-Consumer CurrentChallenges Future Future Dimensions Dimensions.
Biogas Systems Anaerobic Digestion is Very Useful.
PIPED SUPPLY OF BIO-GAS TO RURAL HOUSE HOLDS THROUGH COMMUNITY BIO-GAS UNIT AT VILLAGE: MISHRAWALLIA BLOCK: BERUARBARI DISTT: BALLIA,U.P. SPONSORED BY.
ARTI Compact Biogas: Solution to Urban Organic Waste Management
Waste To Energy Solutions
FUNDED BY THE EUROPEAN COMMISSION S ustainable and C leaner Production in the Manufacturing I ndustries of Pak istan SCI-Pak Mar Feb 2012.
Vermont Experience With Anaerobic Digesters Dan Scruton.
Dallas Water Utilities Southside Wastewater Treatment Plant Cogeneration and Co-Digestion Projects May 9, 2011 Turning Waste Into Energy.
Energy from Agricultural Waste R & D suggestions By Anand Karve Pune, India
Energy Conservation At Kraft Foods, Albany Boyang Li Advisor: Karl DeWahl On-site Supervisor: Clinton Buchner.
| Vigyan Ashram | INDUSA PTI |1 Vigyan Ashram (A center of Indian Institute Of Education) At. Post Pabal Dist. Pune
Co-ordinated Project on Rural Energy Debipur, 2012.
Sustainable Indigenous Energy for Tea Industry in Sri Lanka L P Jayasinghe Bio Energy Association of Sri Lanka.
FOOD WASTE AS A COMMODITY Public-Private Alliance “You can tell how high a society is by how much of its garbage is recycled.” —Dhyani Ywahoo, Native American.
Case Study Leak Detection Program On Niue Island’s Water Resource.
Decentralized Energy Technologies for Micro-level Sustainability: Some Issues and Challenges V.V.N.Kishore Professor & Head, Dept. of Energy and Environment.
“5F” Ayurvet Research Foundation
CASE STUDY ENERGY CONSERVATION OPPORTUNITIES at A Foundry at Bhiwadi (Rajasthan)
Waste Management in Devikulam Village Youngky Panjaitan and Boris Lazarov.
 UAB Vilniaus waters - the largest water company in Lithuania, which operates not only in the city of Vilnius, but also the district, Svencionys and.
Renewable Technologies Available in Ireland Paul Kane.
Proprietary work product, not for reproduction 1 BIOMASS GASIFIER 20 MW POWERPLANT Energy & Environmental Integrators Note! This system can be scaled from.
Rubens Bragagnollo Filho MSc Bioenergy NPRE 498 – Energy Storage Systems
What is a Solar Water Heater ? It is a device that converts the light emitted by the sun into heat energy that is transferred to the required medium. Works.
1 ASEI Sanitation Project ‘A Vision For Change’ Presented at the 2008 ASEI Sanitation Symposium February 9, 2008 Sharanpal (Paul) Sikand Jayant (Jay) Patel.
GREEN INITIATIVES AT IIMB Brief outline and benefits.
Project Planning and Capital Budgeting
Converting Dairy Manure into Energy. An introduction to anaerobic digestion of farm waste Stefan Grimberg Associate Professor Dept. Civil Environ. Eng.
1 By Zenith Energy Services (P) Limited Hyderabad Presentation on Surat Textile Cluster Surat, Gujarat State.
Report of the Comptroller and Auditor General Of India For the year ended 31 March 2000 Removal of Garbage and Sanitation Work Government of National Capital.
1 Union Middle school Re-look at our village with Analytical perspective Class Nine.
Compost : As a Component of INM. Next. Introduction Compost is organic matter that has been decomposed and recycled as a fertilizer and soil amendment.
Role of support services in enhancing competitiveness of smallholder livestock farmers Mc Loyd Banda Department of Agricultural Research Services, Malawi.
By, N Venkata Srinath, 1 st Year MS Power Systems.
Constraints in adoption of INM
1 Solving National Problems  Garbage Use of Chemical Fertilizers  Vermi Composting.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
SRAMADAN FOR TREE PLANTATION & FOORDER DEVELOPMENT PREVIOUS STAGE PRESENT STAGE.
BIOGAS PLANT Biogas plant is an airtight container that facilitates fermentation of material under anaerobic condition. Other names given to this device.
Anaerobic Digesters Key Considerations in Feasibility.
Biomass Dispenser Design team 5 Caleb MacDonald, Kyle Newman, Michael Pettet, and Ryley LeBlanc.
RLO Title FYM as a component of INM. Contributor/Co-contributor & affiliation : Dr D.K.Borah, Professor & Head, Department of Soil Science, Assam Agricultural.
WELCOME TO Kaveish Bioenergy (P) Ltd No.62,Puthu mariamman Kovil street, Ellaipillaichavadi,Puducherry Phone Web-
Biogas Generation and its Utililities GUIDE :- Prof.A.M.Andhare Suyash Shukla Roll no:- 77 R.C.E.M.
SELF SUFFICIENT AND INCOME GENERATING SMART HOUSE
Analysis Of Mini Dal Mill Ankur Federation Gajargota
Unfulfilled Needs: Energy - Resource Constraints  High Cost of Irrigation … lack of productivity and reduced profitability  Lack of power for local value-addition.
Our Innovation is Awarded By United Nation With Sustainable Innovation …. In 2014 We are Expert in SOLID & LIQUID WASTE MANAGEMENT.
India is the first country to mandate corporate social responsibility for qualifying companies.
Decentralized Power Generation System from Crop Residue CENTRAL INSTITUTE OF AGRICULTURAL ENGINEERING NABI BAGH, BERASIA ROAD, BHOPAL by Anil Kumar.
Decentralized Power Generation System from Crop Residue
Power Generation and Distribution
Business Plan Commercial layer business in Bogor, Indonesia M
Biogas Technology.
“17th Renewable Energy Summit” “Dr D K Khare, Director, MNRE”
Compost : As a Component of INM
Sr. Lecturer in Electrical Engg. Govt. Polytechnic,Manesar
Rural Entrepreneurship T.Y.B.Com
BIOGAS PLANT.
Commercial Use of Biomass for Generating Electricity in a Small Village Reun Rina.
Presentation transcript:

RURAL EMPOWERMENT Through Biogas Entrepreneurship

COMMUNITY BIOGAS SCHEME Village: BHITBUDRAK Taluka: UCHHAL District: SURAT State: GUJARAT Country: INDIA

Bhint Budrak Village Jilla /Taluka Panchayat Surat

Limitations of Traditional Biogas Plants

Presently most of the Biogas plants installed traditionally are either defunct or working unsatisfactorily and inefficiently. The studies reveal following reasons for the above status: The Digester loadings such as cattle dung and water are not thoroughly mixed which results into either non-generation of gas or lesser quantity gas production. 2. Due to the quality and pressure of the gas produced is being insufficient, it cannot be transported to far of houses with required pressure.

The above constraints and defects were rectified and corrected by Gram Vikas Trust. The mixture of cattle dung and water are stirred in required proportion uniformly and thoroughly by a mixing mechanism with proper air circulation. This results into maximum generation of the gas and utilization of the plant capacity. As such, with the help of pressure regulating tank and mechanism, the gas can be distributed to individual households with uniform pressure as is done in case of CNG in major cities.

Innovation

Recently, Gram Vikas Trust, introduced GOBAR BANK concept and has manufactured, installed and commissioned 2 Gobargas Plants in Bhintbudrak village in Uchhal Taluka, Dist. Surat. The plants are of 85 M3 capacity each totaling to 170 M3 of biogas generation per day. The gas is further purified and distributed satisfactorily to 121 houses through pipeline. The design of the plant emphasizes the use of minimum motive power as compared to plant total power output. Apart from the above application, the purified biogas with maximum content of Methane can be used to generate electricity through gas generators and also can be bottled and used to run the vehicles. The gas purification systems are developed by Gram Vikas Trust.

(1) Loading Platform The Gobar Bank members bring the dung everyday to the community biogas plant which is weighed and accounted for in their pass books.

(2) Slurry Preparation The cattle dung taken from dung loading platform area is delivered to feed preparation tank section. The fed dung is mixed with water for maintaining ratio of 1:1 for fresh cattle dung and 1:1.25 for stale (hard) cattle dung. The mixture is then mechanically mixed to have homogeneous slurry.

(3) Anaerobic Digestion Anaerobic digestion tank (biogas digester) creates an anaerobic condition to generate methane gas by methanogenic bacteria. The digester employed here is mostly KVIC model with floating dome & water jacket. The water jacket helps in curbing the methane leakage and wastage.

(4) Common Collecting Tank An intermediate gas storage before Pressure regulating tank for distribution to concerned beneficiaries.

(5) Pressure Regulating Tank Gas is compressed by blower and fed to the pressure regulating tank where gas is upgraded due to the passage of pressure

EARLIER ENVIRONMENTAL NUISANCE – SMOKE FROM WOOD BURNING

NOW An happy villager with her biogas connection and equipment

The Slurry being transported to composting pits.

The Compost.

The slurry generated by these biogas plants are being converted into Vermi-Compost for Organic Farming. This Compost is very good fertilizer for the agriculture having rich nutrient values.

Vermi- Compost Unit

I. Size of Biogas Plant- 85 m3/day Entrepreneurship Models on Biogas for Rural Areas Large Scale/ Community level Biogas Enterprises for Cooking needs- Pipeline supply and Rural Sanitation and bio manure production I. Size of Biogas Plant- 85 m3/day No. of families Beneficiaries—50 Cow dung required—2 Tons/day- Rs 250/Ton A complex of 20 community toilets Gas utilization—Cooking If for Cooking – 2 hrs. morning & 2 hrs. evening(1.5 m3/family per day) Pipeline length—up to 1km. distance Pipe quality—HDPE, pressurize system—0.3 kg./cm2(Rs. 2.5 lacs cost) Gas charge—150/month-family

II. Raw material—Cow dung+ Toilet (community-20 toilets costs 1.5lacs) III. Slurry Management—Biogas digested slurry Four options- 1.     Liquid slurry 2.     Recycle water (upto 40 to 50% only) 3.     Dry slurry 4.     Semi dry 750 kg semi dry slurry @ Rs 2/- per kg costs Rs 1500/day Local consumption of slurry is advised Quality of slurry should be maintained

Cost Plant Cost – Rs 4,50,000/- Pipe Line Cost – Rs 1,50,000 Appliances 50*400 – Rs 20,000 Pressurizing System – Rs 2,00,000 Manpower ( Mechanic – 5000, Helper -3000 ) – 96,000 Income- Gas – 150*50 – Rs 7500/ month = Rs 90,000/yr Slurry – Rs 1500/day = Rs 5,00,000/yr CDM Benefits – Rs 71,000/yr

Cost estimates Non- recurring cost—Rs. 8,20,000 ($ 20,500) Recurring/ Variable cost—Rs. 2,12,000 ($ 5300) Manpower-- Rs.96,000 ($ 2400) Depreciation—Rs.80,000 ($ 2000) Sum of recurring cost- 3,88,000 ($ 9700) Revenue generation- 5,90,000-3,88,000= Rs.2,02,000 (& 5050) Note- In addition to this Carbon credit benefit to the tune of Rs.71,000/yr. ($ 1775) will also be available.

2. Large Scale/ Community level Biogas Enterprises for Electricity Generation and supply for domestic consumption, water supply and community consumption and Rural sanitation 15 KVA Power Generating System from - 85 m3/day Biogas Plant No. of families Beneficiaries—50 No. of Animals—200 Cow dung required—2 Tons/day- Rs 250/Ton Gas utilization— Electricity Domestic connection—2CFL, 1 Fan= 100 Wt.*50=5000Wt. Water supply connection—4000 Wt. Community Hall—2 CFL, 2 Fan & 1 TV.= 500 Wt.

Cost Non recurring B. Recurring Plant Cost – Rs 4,50,000 Electricity distribution cost – Rs 2,00,000/- Genset Cost – 15 kW – Rs 1,00,000 Genset Room Cost – Rs 1,00,000 Sum - Rs 8,50,000 B. Recurring Manpower ( mechanic – 5000, helper – 3000) – Rs 90,000 Raw Material – 1,62,000 Miscellaneous – 50,000 Depreciation – 85,000 Sum = 3,87,000

Cost estimates A. Non recurring Sum =8,50,000 ($ 21,250) B. Recurring Income— Electricity supply 130 unit @ Rs.6 per unit *365 = Rs.2,84,700/yr. ($ 7117) Slurry—Rs.1500/day= Rs.5,00,000/yr. ($ 12,500) CDM benefits – Rs.71,000/yr. ($ 1775) Sum= Rs.7,84,000 ($ 19,600) Surplus— Rs. 7,84,000-3,87,000= Rs. 3,97,000 ($ 9925)

Cylindering of methane available from biogas plant for tractors and rural vehicles and production of bio manure Feasibility analysis for a community biogas plant of 300 M3 per day capacity with biogas enrichment and bottling plant has been shown below.   Dung requirement - For 300 cum. Biogas Plant = 6000 Kgs. Assuming cost of Dung = 0.20 Rs/kg. Cost of Dung for Biogas plant = 1200 Rs. per day.  CAPITAL COST – 1. Bio Gas Plant (Digester) Provided by Buyer (@Rs. 3000/- per cubic meter capacity, for 300 cubic meter capacity Rs. 900000/-) 2. Cost of Scrubbing unit Rs. 6,00,000.00 3. Cost of Compressor Rs. 6,00,000.00 4. C.N.G. cylinders Rs. 2,00,000.00 5. Storage tank Rs. 1,00,000.00 6. Installation Exp. Rs. 2,00,000.00 Total Rs. 17,00,000.00

OPERATION COST - A. Fixed operational cost- 1. Interest on capital @ 10% per annum= 0.1x 14,00,000 = Rs. 1,40,000 per annum 2. Depreciation @ 5% per annum = 0.05x 42,50,000= Rs.70,000 per annum. Total cost = 2,10,000 per annum   B. Annual Running (Operational) Cost: - 1. Dung cost 1200x350 = Rs. 4,20,000 P.A. 2. Labors Cost (1 skilled and 2 unskilled labors) 300x 350 = Rs. 1,05,000 P.A. 3. Electricity cost (10 kWh x12 hr) 360x350 @3/- unit = Rs. 1,26,000 P.A. 4. Repair and Maintenance@ 2% capital cost on 14,00000 = Rs. 28,000 P.A. Total cost = 6,79,000 per annum Sum of Fixed Operation cost and annual running cost: =6,79,000+2,10,000 = 8,89,000.00

Cylindering of methane available from biogas plant for tractors and rural vehicles and production of bio manure Biogas plant of 300 M3 per day capacity with enrichment and bottling CAPITAL COST – Rs. 28,00,000.00 ($ 70,000) OPERATION COST – A. Fixed operational cost-3,00,000 per annum ($ 7500) B. Annual Running (Operational) Cost: -12,00,000 per annum Total cost of Operation = Rs. 15,00,000 /- ($ 37,500) Income:- income generate by selling CBG and slurry = Rs. 22,00,000/- ($ 55,000) Profit = Rs. 7,00,000/- ($ 17,500) Payback Period = 4 years

Thank You