Requisition Processing

Slides:



Advertisements
Similar presentations
Moving Inventory easily between plants
Advertisements

How to release MRP planned orders through OBPM MO/PO create and maintain through OBPM Jim Simunek
© 2008 Astea International Figure 1 The Six Areas of Functionality that Can Help Your Organization Increase Its Velocity of Business Increasing the Velocity.
WMS – Warehouse Management Systems
Supplier Contract Management © 2006 Oracle Corporation – Proprietary and Confidential 2. Author & Negotiate 5. Amend4. Monitor and Track 6. Renew & Closeout.
Global Supply Chain Procurement and Distribution
Intracompany Stock Transfer Scenario Overview
What is New in Inventory & Purchasing? Presented by: Derek Kratz.
Changes to Material Returns Process for BRAC SS&D directive BRAC SS&D eliminates retail stock at the identified sites No retail stock alters the current.
Presented by: Gail G. Goodwin, CPIM Principal Solution Consultant.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) IUID-Enabled Serialized Item Management Levels of.
Advanced Forecasting & Procurement for Microsoft Dynamics NAV Presented to ABC Annual Conference 2011 May 12, 2011.
All content in this presentation is protected – © 2008 American Power Conversion Corporation Rael Haiboullin System Engineer Change Manager.
BRAC 2005 Change Overview The BRAC 2005 directives made by the Defense Base Realignment and Closure (BRAC) Committee dictate that Retail supply, storage.
1 Chapter 12: Decision-Support Systems for Supply Chain Management CASE: Supply Chain Management Smooths Production Flow Prepared by Hoon Lee Date on 14.
Enterprise Systems.
September 2001Chapter 10: B2B Grows Up Key questions answered in this chapter: What are the four stages to the evolution of B2B capabilities? What are.
University of Southern California Enterprise Wide Information Systems The Procurement Process Instructor: Richard W. Vawter.
SAP R/3 Materials Management Module
Procurement Processes SAP Implementation
Demand Planning Scenario Overview
A c c e l e r a t i n g Y o u r S u c c e s s ™ Forecast...Action...Contract...Trigger Our Supply Chain Customers all fit into a similar methodology…..FACT.
Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012 Procurement Processes EGN 5620 Enterprise Systems Configuration Fall, 2012.
Readiness-Based Sparing addresses a challenge common across DOD
QAD Distributed Order Management
Istanbul Kultur University Enterprise Wide Information Systems The Procurement Process.
Enterprise resource planning (ERP): An expanded effort to integrate marketing, financial, manufacturing and human resources in a single information system.
Key questions answered in this chapter:  What are the four stages to the evolution of B2B capabilities?  What are the three categories of B2B?  Describe.
Leveraging JDA technology to support a Shelf Connected Supply Chain Amy Higgins VP, Space Management & Analytics Sears Holdings Corporation 1.
© Barloworld Supply Chain Software 2014 INVENTORY METHODOLOGY.
Chapter 2 – Enterprise Systems
Leaders in Asset Management Doing More with your Property Management System How Government Agencies are maturing processes through their PMIS Systems.
Operations Management Contemporary Concepts and Cases Chapter Sixteen Material Requirements Planning and ERP Copyright © 2011 by The McGraw-Hill Companies,
©2004 Deloitte Drop Shipment and Back to Back Order Processes in Oracle 11i July 19, 2004.
Information Briefing DoD WebSDR August 18, 2003 Defense Logistics Management Standards Office.
Operations Management Material Requirements Planning
Supply Chain Management Gina Hishin Regional Product Manager Microsoft Corporation.
1 Copyright © 2004, Manugistics, Inc. All rights reserved. Objectives At the end of this section you will be able to:  Understand the key pains and challenges.
1 WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN LEADERSHIP DEFENSE LOGISTICS AGENCY AMERICA’S COMBAT LOGISTICS SUPPORT AGENCY.
Item Unique Identification (IUID) Presented to SCESC 26 March 2013.
Spiral 2 Process Flow List 1.0 = Material Master 1.1a = MMR-NSN/LSN (Query) Request for Material Master creation & Record Establishment 1.1b = MMR – NSN.
Quovera Confidential 1 ManagingCustomerConsignmentInventory.
AT&L / Logistics & Material Readiness Office of Deputy Assistant Secretary (Supply Chain Integration) Government Furnished Materiel Requisitions GFP Working.
MATERIAL RESOURCE PLANNING
I2 U Intelligent Supply Chain Management Course Module Seven: Inventory Planning.
1 WARFIGHTER SUPPORT ENHANCEMENT STEWARDSHIP EXCELLENCE WORKFORCE DEVELOPMENT WARFIGHTER-FOCUSED, GLOBALLY RESPONSIVE, FISCALLY RESPONSIBLE SUPPLY CHAIN.
I2 U Intelligent Supply Chain Management Course Module Twelve: Inventory Deployment.
Collaborative Planning Training. Agenda  Collaboration Overview  Setting up Collaborative Planning  User Setups  Collaborative Planning and Forecasting.
ANUA 2011, Ft. Lauderdale INTRO Warehouse 1.0 ANUA 2011, Ft. Lauderdale education solutions development inc.
Purchase Order Creation Manually or automatically With or without reference to other documents Data Documents: Purchase requisition, Purchase order, RFQ,
IMPROVED ASSET UTILIZATION Lack of visibility of assets and devices results in low equipment utilization rates, excess equipment purchasing and sometimes.
 Andersen Consulting 2000 MM03 - Master Data in Purchasing & Contract November, 2000.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Manufacturing Planning and Control MPC 6 th Edition Chapter.
Reid & Sanders, Operations Management © Wiley 2002 Material Requirements Planning 15 C H A P T E R.
Prepared by: Session ID: PeopleSoft Procurement Contracts Madeline Osit COO Beacon Application Services
QAD Demand Management Patrick Grace, QAD Solutions Consultant September 27th, Fall MWUG Session.
ABCs of Inventory Planning
Chapter 22 Procurement Cycle and Documents
Demand Planning Scenario Overview
Leveraging Features and Functionality in PeopleSoft 9
Draft PDC 1267 DLMS 830D Navy / DLA Gross Demand Planning (GDP)
MM03 - Master Data in Purchasing & Contract
Microsoft Dynamics 365 – Purchasing & Supply Process at AltaSteel
CHAPTER 14 MRP and ERP.
Demand Planning Scenario Overview
Selling ERP The “BACK OFFICE”
SCO2 Activation SCO enabling trust through visibility 2.0.
Presentation transcript:

Requisition Processing IMSP R2.1 Functionality There will be active IMSP Spiral 2 functionality affecting current EBS users/business prior to NSY roll-outs. Summary of active functionality with IMSP R2.1 IOC: Functionality IMSP Release 2.1 Level Setting IPO enhancements – Automation of the optimize process, resolution of retail dual channel history mapping* Enhanced criteria for virtual SKU activation/deactivation* DSS Levels interface - Utilization of expiration dates and record types* Disposals DLA managed excess will be determined by DORRA AAO, ERL, and PRS values and executed systemically or manually in EBS via Supply Planner Workflow Fill/kill of disposal orders and denials Requisition Processing Do not fill orders from local stock if previous AF maintenance requisition denied by DSS* Expedited requisition processing time report updates* Enable configurable business rules for item category determination* Due-ins Include dummy ODN on due-in to DSS to facilitate real-time solution for “Dual Channel” receiving issues (DSS logic to be active with release 11.1) * Local Purchase Further enable configurable business rules for retail emergency determination* Workflow button text updates to accommodate SRM transition* Material Master New material type available for Non-DLA managed items New Disposal fields: Agg MinSS, Agg MaxOH, retail switch, total Min Protect, Potential Reutilization Stock New Navy IA site fields visible SO/PR/PO Fields New RA doc number field used for AF reference doc number related to DSS denials* New Spiral 2 fields visible *ALC site (Spiral 1) Impacts

IMSP R2.2 Functionality Functionality IMSP Release 2.2 Navy Demand Planning Navy will provide Gross Demand Plan based on a master schedule and bill of materials. The GDP will be brought into EBS through Demand Collaboration monthly and will be used in conjunction with the statistical forecast  to drive replenishments. * EBS Statistical Forecast and Consensus Forecast DLA will generate statistical forecast for DLA managed and non-DLA managed FRC and NSY items.  Enriched forecast will be developed considering both the statistical forecast and GDP input via various collaboration rules and thresholds.* Order Management & Issue Order The Navy will send DLA both unfunded requisitions (Requisition Alerts) and funded requisitions (Issue Orders).  DLA is responsible for fulfilling all orders, including orders for Non-DLA Managed NSNs, Local Stock Numbers, and materials at a less than unit of issue.  Material received for Requisition Alerts will be protected until the funded requisition is received.  For Non-DLA Managed materials, DLA will now procure items directly from the other Source of Supply and be responsible for performing all requisition maintenance transactions with the other Service. *FRC Specific Logic not active until FRC rollouts

IMSP R2.2 Functionality (cont’d) Time Phased Inventory Plan IMSP Release 2.2 Time Phased Inventory Plan Incorporating FRC plans and intelligence through DLA enterprise collaboration and demand planning processes which will drive time phase replenishments* Statistical forecast will drive NSY replenishments FRC and NSY demand signals will be managed within EBS SAP for stock fencing. Consensus Supply Plan Consensus supply plan encompasses building SKU’s/Sourcing, calculating levels, protection based on net demand signals/JML’s and utilizing S&OP practices to develop enriched replenishment plans Material Procurement The Navy will send DLA both unfunded requisitions (Requisition Alerts) and funded requisitions (Issue Orders).  DLA is responsible for fulfilling the requisitions for both DLA and non-DLA Managed NSNs through standard and local procurement processes.  DLA will set the parameters and make the order emergency determination in order to correctly perform workload assignment of requisitions. *FRC Specific Logic not active until FRC rollouts

IMSP R2.2 Functionality (cont’d) IMSP Release 2.2 Inventory Management and Material Returns All Non-DLA Managed items returned will receive credit based on the credit provided by the managing service (Navy, Air Force) to DLA. DORRA Disposal Process to be enhanced by the previously existing Disposal Candidate Program in SAP. Inventory balances in Navy, EBS, and DSS systems must be kept in synch.  DLA will now perform Inventory Reconciliation for Non-DLA Managed NSNs and LSNs.  DLA will also send the Navy current on hand inventory balances. Material Master Record IMSP will provide functionality to ensure all Navy-specific NSNs and LSNs are available in EBS to support demand planning and order fulfillment functions. EBS will provide two way communications with Navy systems (MAT/MRPII) when stock numbers are updated EBS. Some Navy-specific material elements and Navy “unit of use” will be incorporated into the EBS material master. Manage Discrepancies/Deficiencies DLA is taking ownership of the physical inventory and most supply chain functions of the Shipyards and FRCs. Quality Assurance functions performed in Navy Systems (PDREP/JDRS) will be integrated with DSS and EBS to support facility level inventory management, demand planning, and order fulfillment. *FRC Specific Logic not active until FRC rollouts

IMSP R2.2 ADC 381 *FRC Specific Logic not active until FRC rollouts

IMSP R2.2 ADC 381 (cont’d) *FRC Specific Logic not active until FRC rollouts