NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary.

Slides:



Advertisements
Similar presentations
ELEMENTARY SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships.
Advertisements

Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Bronze Award: Library/Media Center
MARPLE NEWTOWN SCHOOL DISTRICT FACILITIES. Maintenance & Small Projects Planned for Summer 2007 New carpet at Worralls office New fencing at Worralls.
Recent Bond Accomplishments. Bordeaux Elementary Remodel.
Blissfield Community Schools Strategic Plan Facilities Team.
COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.
February 16, Tonight’s Agenda  Review Assets and Challenges From Last Meeting  Review Necessary Assumptions  Look at Possible Considerations.
Design Review Planning to date Project scope summary
FACILITY PLANNING October 1, :00 PM – Raymond School Tour 6:30 PM – Interactive Workshop Raymond Community Workshop.
January,  Built School is 22 years old  1997 – 1 st Expansion of School › Additions: New Shop, Wolverine Lounge, › Remodeled/relocated.
Del Mar Union Schools Facilities Master Plan Update September 19, 2012.
N EXISTING FACILITIES BUILDING “A” -Principal’s Office -Workroom -(9) 3 RD Grade Classrooms - (4) 4 TH Grade Classrooms -Life Skills Classroom -Title.
BOE Goal: Study long-term facility needs All patrons invited to join Each building and special education co-op represented KIDS Committee met.
Current Project Update October 25th 2012 Good Evening!!!
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
Remsenburg – Speonk Union Free School District Elementary School Bond Planning Presentation October 12, 2010 BBS Architects and Engineers and Triton Construction.
Coloma Community Schools Community Forum #2 October 25, 2011.
Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School Additions and Renovations to: Horace Mann School.
Glenvar High School Renovations School Board Presentation
Jim Ned CISD School Bond Election May 8 th, 2010.
Logo. PRELIMINARY SITE PLAN PROGRAM GOALS Embrace & live out our Mission Grow in commitment to Christian living through: Education, Worship, Stewardship,
Tuesday, October 2, 2012 MSS Room #1.  The Leadership Team has not had a formal discussion about HSD facilities.  Individual discussions have taken.
FACILITIES REVIEW COMMITTEE REPORT October 9, 2007 POCANTICO HILLS CENTRAL SCHOOL.
Building Services Department Summer Building Services Capital Improvement Program Capital Improvement Program Maintenance Custodial Environmental.
APRIL 2, Superintendent proposes to consider construction of new administration building to Board May 2010 Board gives approval to begin search.
ALMA PIERCE ELEMENTARY SCHOOL Presented by: Frank Architects Inc. JUNE 26, 2002 DESIGN DEVELOPMENT PHASE.
Fanning Howey Stuck Associates Brailsford & Dunlavey Woods Group RDI Board of Education Work Session July 10, 2014 We promise to put children first!
ADDITION & REMODEL Eugene Field Elementary School.
Torrance Unified School District Bond Measure Y Bond Measure Z Quarterly Construction Update September 30, 2009.
Lincoln Consolidated Schools Citizens Steering Committee Bond Issue Final Recommendation Board of Education Meeting October 18, :00 p.m.
Focus Areas Learning environments that meet the needs of today’s learners Safe and secure buildings and grounds Improve district infrastructure.
Keyport Public Schools Facility Planning 12/02/15.
Learning, Health, and Safety Capital Project Alternates and Change Order
MIDDLE SCHOOL PROGRAM ADJACENCIES Note: The functional relationships illustrated are diagrammatic only. Further interpretation of these relationships shall.
Board of Trustees Meeting February 25, Strategic Plan Alignment Strategic Priorities from the Strategic Plan 
Option 1 New Construction (10,000 Square Feet) – Secure Entrance / Administrative Offices – Lobby / Connection to Greeno Building – Weight Room Renovations.
MODERNIZATIONS “The First Five” Golden West Elementary Lathrop Elementary Lincoln Elementary Sequoia Elementary Shasta Elementary December 8, 2015.
Riley County – USD 378 Community Forum 2 23november2015 Riley County School District.
MODERNIZATIONS MEASURE G OVERSIGHT COMMITTEE September 8, 2015.
District Local Planning Committee Orientation Part 2 Trimble County Schools Kentucky Department of Education Division of District Support - District Facilities.
Quincy School District’s Vision For the Future Election Day: February 9, 2016.
21 st Century Classroom Learning Environment Installation Process.
White Pigeon Community Schools
Community Meeting, July 18, 2016 Update Designs and Phasing
Bond Implementation Committee
How we got to ‘U’ aka Measure ‘U’pgrade.
Cornwall Central School District
UPDATE: 8/8/2011 Batavia City School District
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Dr. Joseph Meloche Superintendent of Schools Mrs
Facilities Update November 17, 2017
MIRACOSTA COMMUNITY COLLEGE DISTRICT
Fort Cherry School District
UNION GROVE ELEMENTARY REFERENDUM
Woodbridge Middle School Renovation Referendum
CV Futures Task Force Report May 8, 2017
Board Meeting Presentation February 20, 2018
PROPOSED FACILITIES REFERENDUM
Recent Bond Accomplishments
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
WES Renovation Update Photo Gallery
PE/MULTI-PURPOSE ROOM COVERED OUTDOOR LEARNING CENTER
Woodbridge Middle School Renovation Referendum
Chimacum District Facility & Program Plan
Board Meeting Presentation February 20, 2018
EAST PENNSBORO AREA SCHOOL DISTRICT
Bensalem Township School District Feasibility Study
Zumbrota-Mazeppa School District Community Survey Results
Presentation transcript:

NEW PALTZ CENTRAL SCHOOL DISTRICT Comprehensive Facilities Master Plan – Progress Report Summary

Purpose of 2013 Study To update 2010 Building Condition Survey and Formulate a Long Range Facilities Plan

Options A1 - Infrastructure Only + Partial Air Conditioning Upgrade for 21 st Century Educational Model B1 – “Good” Option Containing all “must haves” B2 – “Better” Option Also containing all “should haves” Upgrading to Full Building Air Conditioning

Must Have Should Have Like to Have Duzine  Improved Security  Library Updated  New toilets near cafeteria  Dedicated Multi-Purpose Room  Storage  Expand Cafeteria Serving Area  Update Nurse’s Office  Middle School  Grade Level Clusters & Commons  Relocate Locker Rooms near Gym  Relocate Band Room  Provide Chorus Space  Improve Home & Careers Space  Update 1 Science Lab.  Update and Expand Library  Renovate and update Nurse’s suite  Dedicated Guidance suite  Larger Central Kitchen  Improve parent pick up and drop off configuration  Storage  Expand Cafeteria  Reconfigure Nurse’s Office  More Playing Fields  Adequate Locker Space for all students. High School  5 Additional Classrooms  Renovate Boy’s Locker Rooms  Improve Security at Main Office  Relocate Guidance suite  Storage  Upgrade & Enlarge Media Center  Upgrade & Reconfigure Home & Careers Room  Upgrade Life Skills Room  More Playing Fields Lenape  Update Nurse’s Office  Storage  New and larger Band Room  Modify Stage Area District-wide   Central Receiving  Vehicle Storage  New Paltz Central School District Board of Education Meeting – 10/29/13 Facilities Master Plan – Priorities based on discussions w/ Admin. & BOE

Benefits of Option B1 – Duzine - Good Must Have Duzine  Improved Security  Library Updated  New toilets near cafeteria  Dedicated Multi- Purpose Room  Storage

Renovations at Duzine – Opt B1 - Good

Benefits of Option B2 – Duzine - Better Must Have Should Have Like to Have Duzine  Improved Security  Library Updated  New toilets near cafeteria  Dedicated Multi- Purpose Room  Storage  Expand Cafeteria Serving Area  Update Nurse’s Office 

Renovations at Duzine – Opt B2 - Better

Benefits of Option B1 – Lenape - Good Must Have Lenape  Update Nurse’s Office  Storage

Renovations at Lenape – OPT B1 - Good

Benefits of Option B2 – Lenape - Better Must Have Should Have Like to Have Lenape  Update Nurse’s Office  Storage  New and larger Band Room  Modify Stage Area

Renovations at Lenape – OPT B2 - Better

Benefits of Option B1 – MS – Good Must Have Middle School  Grade Level Clusters & Commons  Relocate Locker Rooms near Gym  Relocate Band Room  Provide Chorus Space  Improve Home & Careers Space  Update 1 Science Lab  Update and Expand Library  Renovate and update Nurse’s suite  Dedicated Guidance suite  Larger Central Kitchen  Improve parent pick up and drop off configuration  Storage

Renovations at MS – Opt B1 - Good

Benefits of Option B2 – MS – Better Must Have Should Have Like to Have Middle School  Grade Level Clusters & Commons  Relocate Locker Rooms near Gym  Relocate Band Room  Provide Chorus Space  Improve Home & Careers Space  Update 1 Science Lab  Update and Expand Library  Renovate and update Nurse’s suite  Dedicated Guidance suite  Larger Central Kitchen  Improve parent pick up and drop off configuration  Storage  Expand Cafeteria  Reconfigure Nurse’s Office  More Playing Fields  Adequate Locker Space for all students

Renovations at MS – Opt B2 - Better

Benefits of Option B1 – HS – Good Must Have High School  5 Additional Classrooms  Renovate Boy’s Locker Rooms  Improve Security at Main Office  Relocate Guidance suite  Storage

Renovations at HS – Opt B1 - Good

Benefits of Option B2 – HS – Better Must Have Should Have Like to Have High School  5 Additional Classrooms  Renovate Boy’s Locker Rooms  Improve Security at Main Office  Relocate Guidance suite  Storage  Upgrade & Enlarge Media Center  Upgrade & Reconfigure Home & Careers Room  Upgrade Life Skills Room  More Playing Fields

Renovations at HS – Opt B2 - Better

Options A1 - Infrastructure Only + Partial Air Conditioning Upgrade for 21 st Century Educational Model B1 – “Good” Option Containing all “must haves” B2 – “Better” Option Also containing all “should haves” Upgrading to Full Building Air Conditioning

Financial Summary OPTION A1…………$30.5 OPTION B1…………$70.4 OPTION B2…………$84.5

Financial Summary: Details OPTION A1 (infrastructure + partial air conditioning) Duzine………....$4.6 Lenape………...$4.1 Middle School...$12.3 High School…...$9.5 TOTAL…………$30.5 Expected Aid….$18.3 Net Cost……….$12.2 *Note “partial a/c” = upper floor + gym, aud., & library

OPTION B1 (“good” / “must haves”, partial a/c) Duzine………....$7.0 Lenape………...$7.2 Middle School...$38.9 High School…...$17.3 TOTAL…………$70.4 Expected Aid….$39.1 Net Cost……….$31.3 *Note “partial a/c” = upper floor + gym, aud., & library Financial Summary: Details

OPTION B2 (“better” / “+ should haves”, + full a/c) Duzine………....$8.4 Lenape………...$9.0 Middle School...$43.8 High School…...$23.3 TOTAL…………$84.5 Expected Aid….$46.4 Net Cost……….$38.1 Financial Summary: Details

Air Conditioning Summary Method 1 (Unit Ventilator) Duzine a. full building…$1.8 *only a 1-story building Lenape a. partial……….$1.5 b. full………......$2.7 Middle School (method 1 not cost effective) High School a. partial……....$1.7 b. full … $4.2 *Note “partial” = upper floor + gym, aud., & library

Air Conditioning Summary Method 2 (Central HVAC w/ Energy Recovery ) Duzine a. full building…$2.6 *only a 1-story building Lenape a. partial……….$2.2 b. full………......$3.0 Middle School a. partial……….$1.1 b. full………......$4.7 High School a. partial……....$2.5 b. full … $6.1 *Note “partial” = upper floor + gym, aud., & library