Airport Obstruction Standards Committee (AOSC)

Slides:



Advertisements
Similar presentations
Obstruction Surveys and Airport Airspace Analysis
Advertisements

AeroMetric, Inc. Presents: An Airports GIS Lecture Series
Airport Layout Plans (ALPs)
Agenda Introduction Advisory Circular Changes Consultant Selection Procedures Contract Format and Provisions Methods of Contracting and Allowable Costs.
Presenter Todd G. Johnson, Airport Solutions Specialist September 14, 2012.
Airport Planning and Design
FAA Airports GIS (AGIS)
SLO – GIS User’s Group Airports GIS (AGIS) September 8, 2011 Matt Cunningham, PLS Aviation Division Manager.
Air Traffic Management
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
Ken Jacobs Airport Planning & Environmental Division March 3, 2010 Federal Aviation Administration Federal Aviation Administration 33.
Presented to: By: Date: Federal Aviation Administration Properly Aligning your ACIP for the annual planning meeting 2014 Annual ACA Conference Patrick.
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Wide Area Augmentation System (WAAS) DAN HANLON WAAS PROGRAM MANAGER Tom Salat WAAS NAS INTEGRATION.
Runway Incursion’s Affect on FAA Approved Pilot Training and Pilot and Flight Instructor Certification and Part 121 Pilot Checking – Andy Edwards – Manager.
Hershey Conference March 2008 Federal Aviation Administration 0 Hershey Conference March 2008 Federal Aviation Administration 0 Conducting Studies For.
Recent Lighting and Marking Design Challenges/Trends
OHIO AVIATION ASSOCIATION April 22, WELCOME AND INTRODUCTIONS Dave Dennis – Aviation Planner, ODOT Office of Aviation; Project Manager for Focus.
Airport Planning. errata Traditional forecasting techniques are still in play, but are considered archaic. US airlines are focused on international travel.
Federal Aviation Administration Airport 20 to 1 Approach Surface & Restoring Night Minimums Georgia Airports Association (GAA) 2015 Annual Workshop Cindy.
Overview What is AGIS? Transition Policy Imagery
NGS role in supporting to FAA
Henry Felices Hershey PA March 5, 2009 Federal Aviation Administration Overview of the Airport Safety Data Program.
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Presented to: By: Date: Federal Aviation Administration What Does the Asset Study Mean for California Airports? Robin Hunt and Patrick Lammerding September.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
By: Carol Martineau, Acting Assistant Manager, Aircraft Maintenance Division, AFS-301 Date: June 7, 2015 Federal Aviation Administration ASA Conference.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Aviation System Standards Flight Inspection Flight.
Presented to: PNT Advisory Board By: JC Johns, Director Navigation Services Date: May 14, 2009 Federal Aviation Administration GNSS Program Status WAAS,
Federal Aviation Administration Advisory Circular 150/5370-2F Operational Safety on Airports During Construction Presented to: Eastern Region 35 th Annual.
Focus Points Airport Layout Plan (ALP) Overview ALP Guidance
Presented to: By: Date: Federal Aviation Administration Airport Inspection & Maintenance at General Aviation Airports Airport Compliance Airports Conference.
Presented to: By: Date: Federal Aviation Administration 2012 ACA Annual Conference David F. Cushing, Manager, LAX-ADO Wednesday, September 11, 2013 Construction.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Presented to:FAA field personnel By:AOSC Date:February 17, 2006 Federal Aviation Administration.
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Federal Aviation Administration Rick Etter Airport Acquisition Specialist FAA, Office of Airport Planning and Programming (202) ,
1 1 Aeronautical Information Services Brief to AIXM User Group 27 February 2007.
Federal Aviation Administration 1 Eastern Regional Conference March 2, 2011 Hershey, PA Office of Airport Planning and Programming Airport Improvement.
AIR TRAFFIC CONTROL.
State Safety Inspections and Sponsor Expectations.
Federal Aviation Administration Newark Project Overview January 2009.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
RADIONAVIGATION CAPABILITIES ASSESSMENT TASK FORCE CGSIC March 10, 2004   John Augustine U.S. Department of Transportation.
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-65/PIA-1 Optimization of Approach Procedures Including Vertical Guidance.
Complex Procedure Development Plan
NOAA Aviation Safety Board Meeting May 16, 2006 Lieutenant Commander Debora Barr NOAA Aviation Safety Program.
1 Pat Benson GPS AIR INTEGRATIONS Digital Aeronautical Data for Navy GPS Aircraft Integrations September 2004.
Presented to: Emerald Coast Transportation Symposium By: Terry Washington, P.E. Regional Capacity Manager – FAA Southern Region Airports Division Date:
Federal Aviation Administration What’s New In Instrument Flight Procedures Jerry Lebar, Eastern Flight Procedures Office March 3, 2010 Hershey Airports.
Space-Based Navigation Systems
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
NASA ARAC Meeting Update on Next Generation Air Transportation System May 3, 2005 Robert Pearce Deputy Director, Joint Planning & Development Office.
Mark Howard October, 2008 NGS ORIENTATION NOAA/NGS Aeronautical Survey Program.
Presented to: 34 th Annual Airports Conference By: Ed Gabsewics, CEP Date: March 3, 2011 Federal Aviation Administration Planning and Environmental Guidance.
Next Generation Air Transportation System Presentation to the Commercial Space Transportation Advisory Committee (COMSTAC) May 26, 2005 Robert A. Pearce.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
Federal Aviation Administration ARP SOP No SOP for CATEX Determinations Effective Date: Oct. 01, 2014 February 2016.
Federal Aviation Administration Infra-Red Requirements for developing a Elevated LED High Intensity Runway Edge Light, L-862(L) (HIRLs) with IR emitter.
FAA NAVAID Rationalization / Resiliency Overview
AIR TRAFFIC ONTROL.
State Safety Inspections
Association of California Airports Instrument Flight Procedures
Airport Planning.
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
Workshop on preparations for ANConf/12 − ASBU methodology
Joint Planning and Development Office “Where new ideas are welcome”
May 2018 HSAC.
Presentation transcript:

Airport Obstruction Standards Committee (AOSC) TERPS Airport Obstruction Standards Committee (AOSC) AC 150/5300-13 Change 9 and 10 Airport and Aeronautical Surveys Presentation to: Penn State Airports Conference, Hershey, PA. Name: Timothy Roe Date: 03/01/2006

Overview Introduction (Obligatory Joke) AOSC Overview A shepherd was herding his flock in a remote pasture when suddenly a brand-new Ferrari advanced out of a dust cloud towards him. The driver, a young man in a Prada suit, Gucci shoes, Dior sunglasses and D+G tie, leans out the window and asks the shepherd: "If I tell you exactly how many sheep you have in your flock, will you give me one?"   The shepherd looks at the man, obviously a yuppie, then looks at his peacefully grazing flock and calmly answers:  "Sure. Why not?" Overview Introduction (Obligatory Joke) AOSC Overview TERPS Change 9 and 10 to AC 150/5300-13 Airport and Aeronautical Surveys Questions The yuppie parks his car, whips out his Dell notebook computer, connects it to his AT&T cell phone, surfs to a NASA page on the internet, where he calls up a GPS satellite navigation system to get an exact fix on his location which he then feeds to another NASA satellite that scans the area in ultra-high-resolution mode. The young man then opens the digital photo in jpeg format to AutoCAD 2006 3d and exports it to an image processing facility in Hamburg, Germany. Within seconds, he receives an email on his Palm Pilot that the image has been processed and the data stored. He then accesses a MS-SQL database through an ODBC connected Excel spreadsheet with hundreds of complex formulae. He uploads all of this data via an email on his Blackberry and, after a few minutes, receives a response. Finally, he prints out a full-color,150-page report on his miniaturized HP LaserJet, turns o the shepherd and says:  "You have exactly 1,586 sheep".   “That's right. Well, I guess you can take one of my sheep," says the shepherd. He watches the young man select one of the animals and looks on amused as the young man stuffs it into the trunk of his car.    Then the shepherd says to the young man:  "Hey, if I can tell you exactly what your business is, will you give me back my sheep?" The young man thinks about it for a second and then says: "Okay, why not?". "You're a consultant," says the shepherd. "Wow! That's correct," says the yuppie. "But how did you guess that?" "No guessing required," answers the shepherd. "You showed up here even though nobody called you, you want to get paid for an answer I already knew, to a question I never asked, and you know nothing about my business. Now give me back my dog." The reason I like this story is it illustrates a point… no one knows your airport better than you!!!!

Airport Obstructions Standards Committee (AOSC) Chartered May 2003 The AOSC works across all FAA lines of business to transform outdated, inconsistent obstruction standards, and practices to future policy that optimally balances operational safety, effectiveness, and economic benefit

AOSC Steering Group Reports to Deputy Administrator, ADA-1 AOSC Steering Group Membership Ruth Leverenz, ARC-1 Kate Lang, ARP-1 (Acting) Russ Chew, ATO-1 Nick Sabatini, AVS-1

AOSC Web Site - http://www.aosc.faa.gov/   Airports Rep Robert Bonanni (AAS-100) ATO Rep. Jesse Gaines (Terminal Safety and Operations Support)

AOSC Decision Documents DD01 - POFA and Runway Separation, dated 12/18/03 DD02 - 40:1 Departure Surface, dated 9/13/04 DD03 - Atlanta End-Around Taxiway (Departure Only), dated 7/12/04 DD04 - Runway/Parallel Taxiway Separation Standards , dated 3/21/05 DD05 - Airport Traffic Control Tower Interim Siting Guidance, dated 6/08/05 DD06 - DFW End-Around Taxiway(Departure Only), dated 6/08/05

Current AOSC Efforts End-Around Taxiways National Standards   End-Around Taxiways National Standards Departure Case Arrival Case? Updating Safety Assessment Toolset Airport Surveying-GIS Program NLA – TERPS Requirements Document 62.5:1 One Engine Inoperable (OEI) guidance

Decision Document 01 POFA and Runway Separation POFA was renamed POFZ and included in Chg 8 to AC 150/5300-13 sent out September 30th, 2004. Same surface different name New POFZ marking/signage standards became effective December 2004. (Standard ILS Signs) FAA issued guidance for controllers to ensure POFZ is clear when weather is below 250 feet and ¾ mile and an aircraft is within 2 nautical miles final. POFZ is required no later than January 2007

Decision Document #02 40:1 Departure Surface Decision document #02 committed the Agency to… Establish a consistent 40:1 OCS standard Provide departure obstacle information to aircraft operators for all 40:1 penetrations Revise both the internal coordination procedures and the policy criteria governing the circularization process in the OE/AAA program. The 40:1 surface has been around for a long time for departures … the problem was how it was implemented was not consistent throughout the FAA DD 02 was implemented to correct this. Basically it involved where the surface started. In some cases (TERPS) it started at departure end at threshold elevation … however if there was a penetration they could raise the surface up to a height of 35 feet above threshold elevation OEAAA process always started the OIS at 35 feet. So obstacles were looked at differently.

Change 9 to AC 150/5300-13 Does not take effect until January 1,2008 Added a New Departure Surface : Consistent with TERPS and FAR guidance Added to Appendix 2 Applicable to all instrument runways with departure procedures Added a New One Engine In-Operable(OEI) Survey Surface: Applicable at all runway ends used for air carrier departures Surface to be included in the ALP and made available to all air carriers at the airport Does not take effect until January 1,2008

Who knows your airport better than you?? AC 150/5300-13 Change 10 ARP will include 40:1 OCS clarification in change 10 of AC 150/5300-13 Departure Surfaces For Designated Runways The applicability of the surface table A2-1 is dependant on the designation of primary runway(s) for departure. The Airport Sponsor through ARP to the RAPT, will identify runway end(s) intended primarily for instrument departures. The determination of primary runway(s) for departure does not prohibit or negate the use of other runways . It only identifies the applicability of the A2-1 surface to the runway end(s). This is the new wording for Change 10 The key points are emphasized… It is the airport sponsor’s responsibility to identify which runway(s) will be designated as the primary departure runways Change 10 clarifies the criteria by not requiring every runway to be protected at 40:1 only those designated by the airport sponsor to the Regional/ADO office who will work with the RAPT to ensure appropriate choices are made based on ATC, Environmental, Airspace etc. Who knows your airport better than you?? Remove, relocate or lower (or a combination of relocate and lower) the object to preclude penetration of applicable siting surfaces unless fixed by function and/or designated impracticable. Within 6000’ of the table A2-1 surface origin, objects less than or equal to an elevation determined by application of the formula in the criteria

40:1 Departure Surface No object should penetrate a surface beginning at the elevation of the runway at the DER or end of clearway and slopes at 40:1 . Penetrations by existing obstacles of 35 feet or less would not require TODA reduction or other mitigations found in the criteria - however, they may affect new or existing departure procedures.

OEI Departure Surface Departure Runway Ends Supporting Air Carrier Operations. Objects should be identified that penetrate a one-engine inoperative (OEI) obstacle identification surface (OIS) starting at the DER and at the elevation of the runway at that point, and slopes upward at a slope 62.5. See figure A2-4. Note: This surface is for provided for information only and does not take effect until January 1, 2008.

Action Plan ARP: Develop guidance consistent with this decision ATO:   Action Plan ARP: Develop guidance consistent with this decision ATO: Work with airports to develop operational guidance using existing infrastructure (e.g., outer taxiways) AVS: Provide guidance to supercede TIL 02-005A and emphasize that draft TIL 03-040 has been withdrawn Provide guidance to National Flight Procedures Group exempting the application of the above guidance during the bi-annual review process for existing procedures Update and refine the Safety Assessment Toolset Review standards based on updated toolset

Decision Document 04 Runway to Parallel Taxiway Separation In support of Agency’s commitment to ensure safe precision approach and landing operations, policy clarification is needed, and the Airports Design A/C, TERPS and other guidance must be consistent (i.e., taxiing, parked and holding aircraft are obstacles)

Construction of New Runways/Parallel Taxiways   All CAT I operations 400 ft separation(500 ft for Group VI) CAT II/III Operations Groups I-IV aircraft - 400 ft separation Group V aircraft - 500 ft separation* Group VI aircraft - 550 ft separation* *if Airport elects to proceed with construction

Existing Infrastructure   Existing Infrastructure The Agency will work with airports to develop operational guidance where compliance can be achieved utilizing existing infrastructure without significant impact on airport efficiency. Note that Airport improvement projects where a Draft Environmental Impact Statement was issued prior to approval of AOSC DD01 on December 18, 2003 will be treated as existing infrastructure.

Airport Surveying-GIS Program Overview FAA Survey Initiative LPV (WAAS) Questions

FAA Survey Initiative Airport Surveying-GIS Program (e-ALP) Provide an interoperable web-based GIS system (Airports-GIS) for the collection, management, and maintenance of airport data addressing the needs of the FAA lines of business collectively rather than individually.

Airport Surveying – GIS Program Purpose Reduce the FAA’s use of NGS for field surveys and Transition the Survey to Private Contractors Allow surveys conducted by commercial enterprises/surveyors to use Federal Grants as well as other State & Local Aviation Resources. Standardize the Survey Process in a Cost-Effective and Expedited Manner Increase the Number of Surveys Conducted Annually Provide data for a standard GIS database capable of producing Digital ALPs and OC Drawings. This initiative is part and parcel of the Geo-Spatial One-Stop and the effort to centralize all geographic information developed or used by the government

Airport Surveying-GIS Program Objectives Create a Standardized Process for Conducting Aeronautical Surveys – Advisory Circulars Create an Airport Geographic Information (GIS) System Website and Database Develop Technical Guidance, Instructions and Templates on contracting out and/or conducting Aeronautical Surveys for Airport Sponsors Develop Tools for Airports and Surveyors to Capture and Provide Survey Data in Digital Form (ADCAT Program) Consolidate all FAA Airport Data Requirements into a New Standard for Airport Layout Data to support FAA and Industry

Aeronautical Surveys Airport Sponsor ADCAT Request E-NASR GIS Database 3rd Party Survey Airport Sponsor Request AIP Grant ADCAT Data Logger Checks and Formats Data Data Not Acceptable E-NASR GIS Database Data Acceptable NGS Validation NACO AVN

LPV Implementation FAA Program Goals Selection of R/W Ends 150 approaches to be implemented in FY-05, 300 approaches in FY 06, FY-07, FY-08 WAAS Office funds most surveys in FY-05, FY-06 ARP Survey Program transitions in FY-07 to fund surveys through third parties. Selection of R/W Ends Led by ATO and ARP Input from Airport Sponsors, and user groups

FY 07 and Beyond Runway ends surveyed by airport/contractor or NGS Survey completed with Federal, state, and local funds at eligible airports Selection of R/W Ends Led by ARP and ATO Airport sponsor-driven process Input from WAAS Office, AVN, and AOPA

FY 07 LPV Implementation Criteria Used Established by ARP with input from WAAS Office Requests from airport sponsor Guidance in Appendix 16 of AC 150/5300-13 Shown on ALP Availability of FY 06/07 funding to implement Environmental issues addressed Non-NPIAS airports not considered Submitted to RAPT (Regional Airspace and Procedures Team), including Airports Division

New Process: FY07 & Beyond WAAS Program Goals Note: State grants, PFC, and local funding are also possible Airport Planning Process Survey AIP Grant Schedule Conduct This is the eALP Project Request Award Survey Survey Grant Obstruction Airports GIS Application Chart Data NGS Approach Data AVN Procedure Validation Aviation Systems Standards National Geodetic Survey -Processes controlled by FAA -Processes controlled by NGS -Processes controlled by the Airport

? Questions ? Robert Bonanni, P.E. Office of Airports – Airport Engineering (AAS-100) 202.267.8761 robert.bonanni@faa.gov Timothy Roe Innovative Solutions International Inc. supporting the Office of Airports - Airport Engineering (AAS-100) 202-267-8785 tim.ctr.roe@faa.gov

Additional Material

  What is WAAS?   WAAS augments the GPS constellation to meet the necessary integrity, availability, accuracy, and continuity for use in all phases of flight at all runway ends

WAAS Components WAAS consists of: 25 reference stations   WAAS Components   WAAS consists of: 25 reference stations 2 master stations 2 geosynchronous satellites 3 uplink stations

WAAS Capabilities Why invest in WAAS?   WAAS Capabilities   Why invest in WAAS? Enhances en-route navigation performance over GPS alone Enhances non-precision approach capability over GPS alone Allows WAAS equipped users to fly 739 published LNAV/VNAV procedures to minimums as low as 350 feet Allows WAAS equipped users to fly new LPV procedures which provide precision approach capability to runways where there is no ILS. These can be flown to minimums to as low as 250 feet 100% Coverage CONUS & Alaska From 100,000 Ft. To Surface (LNAV) Horizontal Accuracy <1.5M Vertical Accuracy <3M Better Than 99.99% Availability Of System 95% Availability In CONUS Of Approach with Vertical Guidance 350’ Minimum WAAS Specific Approaches (LPV) Published Sep 2003 - 250’ Minimums

Current LPV Approach Availability   Current LPV Approach Availability  

Operational Benefits LNAV/VNAV 350’ LPV 250’ ILS 200’ 3o

The eALP Project ALPs contain a lot of information that is important to FAA What if… FAA could capture important information from the ALP and make it available electronically for whoever needs it? Airport Geographic Information Data Standard Replaces Appendix 15 in AC 150/5300-13 Industry Standards and Support Contents Features Attributes External Data Tables Imagery

eALP Applications Obstruction Evaluation Airport Airspace Analysis Construction Projects Aviation Notices (NOTAM) Approach Procedures Environmental Analysis Airport Design Utility Management Wildlife Strikes Moving Maps Airport and System Planning NAVAID Establishment Ground Transportation Land Use Noise Monitoring Property Management FAA & Industry Publications ATCT Procedures Simulation & Training Pavement Management