Wide Area Augmentation System (WAAS)

Slides:



Advertisements
Similar presentations
GALILEO and EGNOS Fotis Karamitsos, European Commission
Advertisements

Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Global Navigation Satellite Systems (GNSS) for Aviation United Nations International Committee on GNSS December, 2005 Ken Alexander United States.
The Global Positioning System A Global Information Utility November 2001.
FAA’s Plan for the Future Use of GPS Briefed By: Kanwaljit S. Sandhoo (MITRE/CAASD) 8th European CGSIC/IISC Meeting, Prague December 2-3, 1999.
INTERNATIONAL SATELLITE COMMUNICATIONS SUCCESSOR SYSTEM (ISCS)
1 1 COMPASS Satellite Navigation System Development Nov. 26 th -28 th, 2008, Beijing China Satellite Navigation Project Center SIDEREUS 2008.
1 CAR/SAM ATN GNSS SEMINAR VARADERO, CUBA May 8, 2002 Barry Billmann Federal Aviation Administration Presentation GNSS 3.2.
Wide Area Augmentation System (WAAS) DAN HANLON WAAS PROGRAM MANAGER Tom Salat WAAS NAS INTEGRATION.
Aviation Benefits of GNSS Augmentation Workshop on "GNSS Applications for Human Benefit and Development“ Prague, Czech Republic September 2010 Jeffrey.
Absolute Receiver Autonomous Integrity Monitoring (ARAIM)
Wide Area Augmentation System (WAAS) E. Douglas Aguilar CAPT, USAF.
GPS Status and Modernization Maj Wesley Chidester Deputy Chief, Systems Engineering & Integration GPS Wing, Air Force Space Command GEOSpatial Information.
1 CAR/SAM ATN/GNSS Seminar ICAO Regional Project for Latin America RLA/00/009 CAR/SAM Test Bed (CSTB) Overview Carey Fagan Federal Aviation Administration.
GPS Status and Modernization Capt Damon Smith PNT Requirements Division Air Force Space Command "This briefing is for information only. No US Government.
GPS Modernization and Interoperability
Status of Operational GNSS Augmentations in United States
Federal Aviation Administration GPS Augmentation Systems Status Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) September 2009.
How a Seemingly Minor Weather Concern Can Have a Significant Economic Impact on the Aviation Industry Aviation Case Study Kim Runk, NWS Las Vegas Southwest.
277a_W00OCT03_CM FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Presentation GNSS 7.3 by Hank Cabler Co-Chairman, SOIT.
Satellite-Based Augmentation Systems (SBAS) Combined Performance
Aviation Considerations for Multi-Constellation GNSS Leo Eldredge, GNSS Group Federal Aviation Administration (FAA) December 2008 Federal Aviation Administration.
How Global Positioning Devices (GPS) work
Aviation Benefits of GNSS Augmentation Workshop on the Applications of GNSS Chisinau, Moldova May 2010 Jeffrey Auerbach Advisor on GNSS Affairs Office.
ENC-GNSS 2006 – Manchester, UK Civil GPS Interface Committee International Sub-Committee May 7, 2006 John E. Augustine Acting Director, Office of Navigation.
Copyright © 2011 Raytheon Company. All rights reserved. Customer Success Is Our Mission is a registered trademark of Raytheon Company. Satellite Based.
GLONASS Government Policy, Status and Modernization
Modernization and GPS III Southern California Section ION Meeting 11 March 2009 Lt Col David Goldstein, US Air Force Chief Engineer GPS Wing This briefing.
Federal Aviation Administration U.S. Wide Area Augmentation System (WAAS) Update Mitch Narins Air Traffic Organization Navigation Services May 2006.
GPS Status and Modernization 3 rd International Satellite Navigation Forum Moscow, Russia 12 May 2009 Lt Col Tim Lewallen, US Air Force Acting Chief, PNT.
Satellite Operation s Satellite Operation s TeleComm Oil Exploration Trucking & Shipping Surveying & Mapping Precision Agriculture GPS enables a diverse.
Presented to: SBAS Technical Interoperability Working Group Date: 21 June 2005 Federal Aviation Administration Certification of the Wide Area Augmentation.
India GAGAN – Adoption within Asia Pacific Region Plan/Opportunities.
FAA GNSS Evolutionary Architecture Study
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Satellite Navigation Program Federal Aviation Administration.
WAAS Test Program Overview & In-service Monitoring Tom McHugh, ATO-P (ACB-430) DOT/FAA W.J.H. Technical Center WAAS Technical Director
Miroslava Trojanovičová.  The European Geostationary Navigation Overlay Service  The official start of operations- on 1 October 2009  3 satellites-
Common Questions - Global Positioning System Devices
FAA Satellite Navigation – Status Briefing 1 Federal Aviation Administration January 5, 2007.
Wide Area Augmentation System Dan Hanlon WAAS Program Manager April 2, 2003.
Presented to: IWG 26 By: Jason Burns (FAA) Date: February 5-7, 2014 Federal Aviation Administration DFMC Work Plan Update.
Federal Aviation Administration 0 GPS, WAAS, GBAS Overview March 8, GPS Integrity RAIM, WAAS, and GBAS: Concepts and Status Federal Aviation Administration.
182a_N00FEB23_DG 1 Local Area Augmentation System CONCEPT OF OPERATIONS Alaska Regional Briefing Anchorage October 1, 2002.
June 2013 Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) June 2013.
Overview of FAA Satellite Navigation Transition and Backup Strategies Int’l Loran Association October 28, 2002.
GPS POLICY AND PLANNING Mr. Joe Canny US Department of Transportation Presented at IISC Meeting December, 1999.
Federal Aviation Administration FAA Global Navigation Satellite System (GNSS) Program Plans and Status GPS/WAAS/LAAS Leo Eldredge, GNSS Program Manager.
Global SBAS Status Satellite Based Augmentation System (SBAS) Interoperability Working Group (IWG) November 2013.
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 FAA Satellite Navigation Program Update Dan Salvano.
2003 FRP User Conferences 1 FAA’s Transition Strategy for Navigation and Landing Services Dave Olsen Navigation System Engineer Architecture and Systems.
Satellite Navigation Program
F E D E R A L A V I A T I O N A D M I N I S T R A T I O N A I R T R A F F I C O R G A N I Z A T I O N 1 Wide Area Augmentation System (WAAS) Dan Hanlon.
By: Richard String, PMP, Engineering Manager, En Route Facilities Planning & Modernization Team Date: September 2007 Federal Aviation Administration En.
Munich SATNAV, Munich Satellite Navigation Summit February 21-23, 2006 Michael E. Shaw Director, U.S. National Space-Based PNT Coordination Office.
GPS Status and Modernization Munich Satellite Navigation Summit Munich, Germany 3 March 2009 Colonel David Buckman, US Air Force PNT Command Lead Air Force.
©2011 Pacific Gas and Electric Company. All rights reserved. SmartMeter TM Steering Committee Update – August 2012.
1 Differential GPS DGPS is a technique for reducing the error in GPS-derived positions by using additional data from a reference GPS receiver at a known.
AMI System Status Report December 11, Project Objectives Selection, p rocurement and implementation of an AMI System that: Provides automated meter.
Agenda Item 6 GNSS Development Status and Future Work Eric Chatre, EC/ESA Rapporteur Technical WG, GNSS Panel Thank you… Good morning… I am ... and.
Agenda Item 6 GNSS Operations Ross Bowie, NAV CANADA Rapporteur, Operational WG Navigation Systems Panel Thank you… Good morning… I am ... and member.
Wide Area Augmentation System (WAAS)
EUROPEAN COMMISSION Satellite-Based Augmentation Systems (SBAS) Combined Performance International Committee on GNSS (ICG-4) Working Group A Saint Petersburg,
FAA SATNAV APPROVALS ICAO CAR/SAM ATN/GNSS SEMINAR Hank Cabler
The Experiment on DFMC SBAS
Navigation Reference System N R S
The Status of Dual-Frequency Multi-Constellation SBAS Trial by Japan
ATN/GNSS Seminar Varadero, Cuba 6 to 9 May 2002 Overview of GNSS
準天頂衛星L5S信号によるDFMC SBAS実験
Presentation transcript:

Wide Area Augmentation System (WAAS) Presentation GNSS 2.2 Hank Cabler, FAA Co-Chairman, Satellite Operational Implementation Team (SOIT)

SIS Available for Non-Safety Uses Since August 2000 WAAS Architecture All Elements in Place SIS Available for Non-Safety Uses Since August 2000 Ionospheric Interference Downlinks Broadcast Frequency L1 1575.42MHz Terrestrial Communication Network WAAS Master Stations (2) Satellites (2) WAAS Reference Stations (25) Ground Earth Stations (3)

WAAS Status Jan 97: Two INMARSAT Geostationary Satellites Leased FAA Lease Is For Communications Transponder on Commercial Satellite AOR-W (Covers Eastern CONUS to Rocky Mountain Area) POR (Covers Western CONUS, Alaska, Hawaii) Hardware & Communications Installation Completed and Tested 25 WAAS Reference Stations (WRS) 2 WAAS Master Stations (WMS) 2 INMARSAT Satellites 4 GEO Uplink Systems (GUS) Terrestrial Communications Network Software Development, Integration and Testing Completed Meets or Exceeds Accuracy and Availability Requirements Jun 98: Nov 99:

WAAS Status INMARSAT-3 Coverage Area Single Dual Pacific Ocean Region Atlantic Ocean Region POR (180º W) AOR-West (54º W)

WAAS Status Key Communication Satellite Auburn (ZSE) Brewster GES Billings (BIL) GPS Satellite Farmington (ZMP) Nashua (ZBW) Oberlin (ZOB) Salt Lake City (ZLC) Aurora (ZAU) Ronkonkoma (ZNY) Clarksburg GES Longmont (ZDV) Fremont (ZOA) Leesburg (ZDC) Olathe (ZKC) Santa Paula GES (2) Memphis (ZME) Palmdale (ZLA) Albuquerque (ZAB) Key Fort Worth (ZFW) Hampton (ZTL) Phase 1 WRS Phase 1 WMS/WRS Phase 1 GES WMS= Wide-area Master Station WRS= Wide-area Reference Station GES= Ground Earth Station Anchorage (ZAN) Jacksonville (ZJX) Houston (ZHU) Juneau (JNU) Cold Bay (CDB) Miami (ZMA) San Juan (ZSU) Honolulu (HNL)

WAAS Status Dec 99: FAA Determined WAAS Did Not Meet 10-7 Requirement In-Sufficient Analytical Proof Integrity Verification Prevents IFR Aviation Use Integrity Requirement Only Affects IFR Aviation Users FAA Forms WAAS Integrity/Performance Panel (WIPP) Redesign Integrity Monitors And Revise System Safety Analysis To Insure Certification Approval FAA Announcement that WAAS Signal-In-Space (SIS) Is Available To Public For Non-Safety Applications WAAS Operating 24/7 For Non-IFR Aviation and Other Users Demonstrated Performance Better Than Specification Since Aug 00, SIS Available 99.99% Nominal Accuracy: 1 Meter Horizontal, 2 Meters Vertical Jan 00: Aug 00:

Current WAAS Use Agricultural Marine Outdoors Surveying World Trade Center

WAAS Development Initial IFR Plan Is To Complete Development Of Integrity Monitors and Complete System Testing For Acceptance By FAA In CY 03 Goal is Acceptance Of System From Prime Contractor (Raytheon) In Mar 03 And FAA Commissioning Of System By Dec 03 FAA Also Making Changes To Optimize System Maintainability By Airways Facilities Changes Will Not Impact Schedule For Contractor Acceptance Human Factors Changes Training Tools Progress on Integrity Monitors Ahead of Schedule 8 Software Monitors Being Revised All Operating on Signal-In-Space

WAAS Development Initial IFR Completion Of Integrity Monitor Integration Is Schedule Driver Initial Delivery Will Provide Service For All Phases Of Flight Down To LNAV/VNAV Approach Capability Will Provide IFR Service With Very Good Availability To Large Portions Of U.S. National Airspace System Over More Than 90% Of CONUS Portions Of Alaska And Caribbean

J F M A M J J A S O N D J F M A M J J A S O N D LNAV/VNAV Schedule 2002 2003 Item J F M A M J J A S O N D J F M A M J J A S O N D Final Integrity Monitor SIS Integration Fault Tree Analysis Human Factors Implementation Complete HMI Analysis Perform Safety Hazard Analysis 60 Day Stability Test System Safety Architecture Description Hardware/Software FCA/PCA CAI Commissioning 3/02 4/02 5/02 6/02 9/02 12/02 1/03 2/03 3/03 12/03 Planned Completion rev6

Snapshot of WAAS Coverage After GIVE Monitor, 2/14/02

WAAS Development Strategy WAAS Is Using An Incremental Strategy To Provide Improvements To Users Before And After Initial Delivery Before Commissioning Develop Procedures (LNAV/VNAV) For Use By WAAS And Other NAS Users WAAS Signal-In-Space For VFR And Other Non-Safety Users Permit Use Of WAAS Avionics For IFR Use Prior To System Commissioning (En Route – Non-Precision Approach) At Or Shortly After Commissioning Begin publication of LPV minimums LNAV/VNAV Nominal Minimums – 350/1½ LPV Nominal Minimums – 250/ ¾

WAAS Incremental Capability 2002 2003 Item J F M A M J J A S O N D J F M A M J J A S O N D WAAS SIS (VFR) TSO-146 (IFR) (ENR-NPA) Contractor Acceptance IOC (IFR, LNAV/VNAV) LPV 8/00 5/02 3/03 12/03 12/03 Planned Completion

WAAS Development Strategy Next Step Will Be To Expand Service Area And Improve Availability Additional Reference Stations CONUS Coverage Requires ~ 5 To 10 More Alaska Coverage Requires ~ 3 To 5 More Additional Master Station (1) Additional GEO Satellite Congress Appropriated $5M In FY 02 Budget For Additional GEO Activity Underway To Acquire GEO Satellite Team Working With Department Of Transportation and Department Of Defense To Insure GPS Modernization Activities Enhance Civil Aviation Capabilities And Improves WAAS Performance

GEO Acquisition Strategy Near Term: Provide A GEO Satellite On Orbit ASAP Mitigate Single Thread Failure of Existing INMARSAT-3 Constellation Improve Availability (Performance) And Coverage (Capability) Of Signal-In-Space To Users By Having More Optimized Orbital Locations Incorporate L5 Signal Capability for Increased Performance and Interference Mitigation Goal Is Satellite On Orbit By FY 04 To FY 05 Time Frame Long Term: Provide Additional Replacement GEO Satellites On Orbit Prior to Expiration of Existing INMARSAT-3 Lease (End Of FY06) Aggressively Pursuing both Near and Long Term Solutions

GEO Acquisition Status FAA Aggressively Pursued Canadian ANIK F3 Satellite Opportunity Ideal Location (118.7W) for Improved WAAS Performance and Coverage On-Orbit Operations Planned for FY 2004 Existing Contract Vehicle in Place and Ready to Execute However, Recent Uncertainties / Risks Developed in ANIK F3 Program Business Case Uncertainty Due To Corporate Acquisition and Events of 9/11 Coupled with Satellite Insurance Increases Result In Potential Satellite Schedule Slip up to 13 Months FAA Pursuing Contingency Plans to Include Potential Competitive Contract Award for Near-Term GEO in FY02

Current INMARSAT Plus 3rd GEO in Ideal Location (1190-1290W) Pacific Ocean Region 180ºW Atlantic Ocean Region 54ºW Optimal 3rd GEO Dual Triple

Conclusions WAAS Is Being Developed Using An Incremental Strategy To Provide Benefits As They Become Available WAAS Hardware Is Fielded And Software Development Completed To Provide A Signal-In-Space System Is Broadcasting 24/7 And Is Providing A Robust And Reliable Signal-In-Space To A Variety Of Users Software Integrity Monitors And Safety Analyses Are Being Revised To Insure System Certification For IFR Use WAAS Prime Contract Development Is Ahead Of Schedule Contractor Acceptance Is Expected In Second Quarter Of FY 03 Commissioning Expected By Dec 03 Activities Underway To Finalize Alaska Architecture GEO Satellite Acquisition Activities Underway