TMDL Development for the Floyds Fork Watershed Louisville, KY August 30, 2011.

Slides:



Advertisements
Similar presentations
2005 Stream Phosphorus TMDLs to be proposed in July 5th NJR The NJDEPs Division of Watershed Management is seeking stakeholder input on proposed phosphorus.
Advertisements

Water Pollution. Definitions Impaired Waters Section 303(d) of the Clean Water Act requires states to develop lists of impaired waters, those that do.
Ann D Hirekatur Project Manager State of Lake Wisconsin Meeting July 13, 2013 Wisconsin River Basin Water Quality Improvement Project.
TMDL Development Mainstem Monongahela River Watershed May 14, 2014.
TMDL Development Upper Kanawha River Watershed August 18, 2011 WV DEP WV DEP Dave Montali.
Truckee River Water Quality: Current Conditions and Trends Relevant to TMDLs and WLAs Prepared for: Truckee Meadows Water Reclamation Facility. City of.
Public Meeting: March 3, 2014 Truckee River Water Quality Standards Review.
5. Final Remarks Information and the GIS package developed will be used to evaluate the effectiveness of implemented watershed management practices in.
The Lake Allegan/Kalamazoo River Total Maximum Daily Load (TMDL) Plan Implementation by Jeff Spoelstra, Coordinator, Kalamazoo River Watershed Council.
Public Workshop Implementation and Enforcement of Nutrient TMDLs for Lake Elsinore and Canyon Lake CA Regional Water Quality Control Board (Regional Water.
Bureau of Water Overview Wastewater issues Drinking water issues Wrap up topics.
Chesapeake Bay Total Maximum Daily Load (TMDL) Tracking Thursday, May 31, 2012 Martin Hurd, Vladislav Royzman, Tetra Tech, Inc. Brian Burch, Megan Thynge,
Nutrient Trading Framework in the Coosa Basin Alabama Water Resources Conference September 6, 2012 A Feasibility Study of Nutrient Trading in Support of.
Complexities of the Carters Lake TMDL Presented by: Jeremy Wyss, H.I.T. Tetra Tech Presented by: Jeremy Wyss, H.I.T. Tetra Tech 26th Annual Alabama Water.
The Wisconsin River TMDL: Linking Monitoring and Modeling Ann Hirekatur, Pat Oldenburg, & Adam Freihoefer March 7, 2013 Wisconsin River TMDL Project Team.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Developing a Nutrient Management Plan for the Napa River Watershed Group Members Vinod Kella  Rebecca Kwaan  Luke Montague Linsey Shariq  Peng Wang.
9.Monitoring Plan + 10.Implementation Plan + 4. LAs* 5. WLAs* 6. MOS* 7.Seasonal Variation* 8.Reasonable Assurance + TMDL Process 1 Problem Understanding.
April 22, 2005Chester Creek Watershed TMDL Total Maximum Daily Load Chester Creek University Lake & Westchester Lagoon Alaska Department of Environmental.
TMDL Development for the Floyds Fork Watershed Watershed Hydrology and Water Quality Calibration and Water Quality Model Calibration Technical Advisory.
Incorporating Climate Change Adaptation in EPA Region 10 Programs: An example based on a newly initiated pilot in the Office of Water and Watershed’s Total.
Watershed Characterization System (WCS) and its Modeling Extensions
Allen Berthold Texas Water Resources Institute. Review: Clean Water Act Goal of CWA is to restore and maintain water quality suitable for the “protection.
NSF - CREST Center for the Integrated Study of Coastal Ecosystem Processes and Dynamics in the Mid-Atlantic Region Sub – Theme #1 Land Use and Climate.
Chesapeake Bay Program Incorporation of Lag Times into the Decision Process Gary Shenk 10/16/12 1.
Update of Tributary Concentration and Loading Estimates to Lake Champlain Maurie Clark, Annie Procaccini, and Jamie Van Clief.
Chowan River TMDL Development Raccoon/Sappony Area 09/8/04.
Impaired and TMDL Waterbody Listings Impacts on DoD Facilities Bill Melville, Regional TMDL Coordinator
Department of the Environment Overview of Water Quality Data Used by MDE and Water Quality Parameters Timothy Fox MDE, Science Service Administration Wednesday.
Total Maximum Daily Loads in MS4 Storm Water Programs.
1 ATTAINS: A Gateway to State-Reported Water Quality Information Webcast Sponsored by EPA’s Watershed Academy June 18, 2008, 11:30am-1:30pm EST Shera Bender,
VIRGINIA’S TMDL PROCESS.
Federal Clean Water Act Monitoring and assessments completed statewide Standards not met? Section 303 (d) requires placing the water body on the “Impaired.
Watershed Assessment and Diagnosis of Condition for August 20, 2007 Joe Magner and Greg Johnson MPCA.
Working with Stakeholders in Developing Watershed and Water Quality Models: The Dos and Don’ts Well, at least some of them! Presented by: Brian J. Watson,
The Importance of Watershed Modeling for Conservation Policy Or What is an Economist Doing at a SWAT Workshop?
Teresa Marks Director 1. o The Clean Water Act of 1972 requires states to establish water quality standards (WQS) for all waterbodies within the state.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
Chowan River TMDL Development Tidewater Area 08/26/04.
Eric Agnew Environmental Regulations February 15, 2006.
Chesapeake Bay Program Decision Support System Management Actions Watershed Model Bay Model Criteria Assessment Procedures Effects Allocations Airshed.
Bacteria and Dissolved Oxygen Total Mass Daily Load Development for the Atascosa River Jessica L. Watts.
Deep River-Portage Burns Watershed TMDL Stakeholder Meeting March 13, 2013.
KWWOA Annual Conference April 2014 Development of a Kentucky Nutrient Strategy Paulette Akers Kentucky Division of Water Frankfort, KY.
BASINS 2.0 and The Trinity River Basin By Jóna Finndís Jónsdóttir.
Adem.alabama.gov ADEM’s Monitoring Summary Reports Alabama – Tombigbee CWP Stakeholders Meeting Montgomery, Alabama 3 February 2010 Lisa Huff – ADEM Field.
SWAT Modeling for Subwatershed Prioritization Presented by: Dharmendra Saraswat Co-Authors: N. Pai, M. Daniels, and M. Leh 2010 Non Point Source Project.
TMDL Modeling Toolbox TMDL Modeling Workshop US EPA – Region 4 Tetra Tech Inc.
Kentucky Growth Readiness for Water Quality Does your water quality matter?
West Metro Water Alliance A Path to Clean Water – Understanding TMDLs and Watershed Planning September 21, 2011 Diane Spector Wenck Associates, Inc.
Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Modeling Stream Flow of Clear Creek Watershed-Emory River Basin Presented by Divya Sharon.
Chowan River TMDL Development Blackwater Area 09/07/04.
Integrating a Continuous Water Quality Monitoring Network into Texas’ Surface Water Quality Monitoring Program Jill D. Csekitz, Aquatic Scientist Texas.
Overview of the Total Maximum Daily Load Program.
STREAM MONITORING CASE STUDY. Agenda  Monitoring Requirements  TMDL Requirements  OCEA Initial Monitoring Program  Selection of Parameters  Data.
Floyds Fork Bacteria TMDL Andrea M. Fredenburg Kentucky Division of Water TMDL Section February 19, 2013.
Commonwealth of Virginia TMDL Program Update Citizen for Water Quality Annual Summit September 22, 2001.
Modeling Fecal Bacteria Fate and Transport to Address Pathogen Impairments in the United States Brian Benham Extension Specialist and Associate Professor,
Nutrients and the Next Generation of Conservation Presented by: Tom Porta, P.E. Deputy Administrator Nevada Division of Environmental Protection President,
Dr. Thomas Hardy Chief Science Officer River Systems Institute Texas State University.
Impact of Nonpoint Sources on Water Quality
What’s in Your Watershed? Fall and Virgil Creeks
Dave Clark and Michael Kasch
Public Meeting February 19, 2009
Phosphorus and Suspended Solids TMDL For the Lower Fox River/Green Bay Area of Concern – Putting the Pieces Together Bud Harris, P. Sager, D. Scheberle,
Using GIS to Aid in TMDL Modeling
High Rock Lake TMDL Development
Upper Clark Fork Watershed Restoration and TMDLs
EPA’S ROLE IN APPROVING BASIN PLAN AMENDMENTS
Presentation transcript:

TMDL Development for the Floyds Fork Watershed Louisville, KY August 30, 2011

Presenters Paulette AkersKY Division of Water Chris Thomas Chief -- Pollution Control and Implementation Branch Tim WoolNational TMDL Expert Water Quality Modeler, TOM Brian WatsonDirector, Water Resources Group Tetra Tech, Atlanta

Opening Remarks Background –Segments of the Floyds Fork Watershed are on Kentucky’s 303(d) list for: Nutrients (organic enrichment), Dissolved Oxygen & Pathogens –At KY’s Request EPA Started to Develop Nutrient TMDL in 2007 –EPA Receives Notice of Intent in 2011 Contract awarded to Tetra Tech for the development of watershed and water quality models to be used in a TMDL determination Period of Performance: May 2011 – November 15, 2012 Cost: $419,050

TMDL Process

Clean Water Act Section 303(d) Each State shall establish... The total maximum daily load...at a level necessary to implement the applicable water quality standards with seasonal variations and a margin of safety which takes into any lack of knowledge…………

TMDL Process Problem Statement –Floyds Fork is listed for: Nutrients and Dissolved Oxygen Definition of Endpoint –WQS Dissolved Oxygen: Daily Average 5 mg/L no Less than 4 mg/L Nutrients: In lakes and reservoirs and their tributaries, and other surface waters where eutrophication problems may exist, nitrogen, phosphorus, carbon, and contributing trace element discharges shall be limited in accordance with: – The scope of the problem; –The geography of the affected area; and –Relative contributions from existing and proposed sources. –Source Identification

TMDL Process –Point Source Dischargers –MS4 Dischargers –Non Point Sources Linkage Between Sources and Receiving Water Allocation

TMDLs Overall Allocation Formula: Where:  WLA is the Sum of Waste Loads (Point Source + MS4)  LAis the Sum of Loads (Nonpoint Source) MOSis the Margin of Safety

Stakeholder Process

Lessons Learned You are a Valuable Resource –Site Specific Knowledge –Engaged in the Process –Have Individual Concerns Regulatory Decision Making Process –Proposal –Final

Working Together EPA will use a stakeholder process in the development of the TMDL –Status of the Model Development will be presented at future meetings –Models will be made available for outside technical review –We encourage your involvement

Approach

TMDL Approach TMDL will be developed to meet the designated uses and applicable water quality standards TMDL will address –Current loading conditions –Determine reductions needed to meet TMDL Condition –Allocate to: Point Sources Point Source – MS4 Non Point Sources

Models to be Used Watershed Model – Loading Simulation Program C++ Water Quality Model – Water Quality Analysis Simulation Program (WASP) Both Models have been extensively used for TMDL Development Both Models have been peer reviewed Proven track record of linking these models together

Watershed Model -- Background Visual C++ programming has seamless integration with Microsoft Access and Excel Same algorithms as HSPF Simulates watershed hydrology and water quality dynamically Land use and rainfall based Outputs flows and concentrations for receiving water model (WASP)

Water Quality Model -- Background Water quality model Dynamic Full Eutrophication Kinetics Parameters simulated –DO –BOD –Ammonia –Nitrate-Nitrite –Organic Nitrogen –Organic Phosphorus –Ortho Phosphorus –Chlorophyll a

Modeling Approach Calibrate and Validate to current conditions (2000 – 2010) TMDL Reduction Scenarios –Determine the load reduction required to meet Water Quality Standards –Provide initial wasteload & load allocations Implementation –Modeling framework can be used to pollutant sharing and re-allocation

Data Review

Location Map

Elevation (Source: USGS National Elevation Dataset (NED), 1/3 Arc-Second)

Land Use (Source: 2006 National Land Cover Database (NLCD), Pervious)

Land Use (Source: 2006 National Land Cover Database (NLCD), Impervious)

Soils (Source: SSURGO)

Geology (Source: Kentucky Geography Network – kygeonet.ky.gov)

Karst Areas (Source: Kentucky Geography Network – kygeonet.ky.gov)

Point Sources (Source: KDOW and EPAR4)

Sampling Stations (Source: USGS, KDOW, MSD, and WBPs)

Meteorological Stations (Source: National Climatic Data Center (NCDC, USGS)

Septic Systems

Next Steps Evaluate any new data Setup the watershed model Calibrate/validate the watershed model Next stakeholder meeting –November 2011 Present watershed model calibration Present water quality endpoints

Questions?