CSD for P802.1AS-REV 802.1 WG Wednesday, 05 November 2014.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0024r0 Submission July 2004 Steve Shellhammer, Intel CorporationSlide 1 IEEE Wireless Coexistence TAG Steve Shellhammer
Advertisements

Doc.: IEEE /0006r0 Submission March 2005 Steve Shellhammer, Intel CorporationSlide 1 What is a CA document? Notice: This document has been prepared.
Doc.: IEEE /661r1 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
Doc.: IEEE /661r0 Submission November 2002 Ziv Belsky, WavionSlide 1 Proposal for the 5 criteria for the HT SG.
ECMP for 802.1Qxx Proposal for PAR and 5 Criteria Version 2 16 people from ECMP ad-hoc committee.
Doc.: IEEE /0085r2 Submission July 2011 Gerald Chouinard, CRCSlide Response to Comments received on the proposed a PAR and 5C Date:
Submission doc.: IEEE Comment #1 from WG Comment: In Section 5.2.b two examples of spectrum resource measurements are given: PER and.
1 Force10 Networks, Inc. - Confidential and Proprietary, For Internal Use Only 1 Higher Speed Ethernet Update Greg Hankins APNIC IX SIG APRICOT /02/28.
IEEE 802.1ABrev Extension for Auto Attach Nigel Bragg Dan Romascanu Paul Unbehagen.
21-08-xxxx IEEE MEDIA INDEPENDENT HANDOVER DCN: mrpm Title: Comments on PAR/5C of MRPM SG Date Submitted: September 7, 2008.
IEEE Qbv DRAFT 5C’s for Time Aware Shaper enhancement to 802.1Q
Submission doc.: IEEE /0229r1 March 2015 Jon Rosdahl, CSRSlide PAR Review March 2015 Date: Authors:
Submission doc.: IEEE 11-10/0897r0 July 2014 Jon Rosdahl, CSRSlide PAR Review – July 2014 Date: Authors:
Doc.: IEEE /252 Submission November M. Hoeben - No Wires Needed Load Balancing PAR Criteria Maarten Hoeben.
Doc.: IEEE /0981r1 TGs Reference Architecture Considerations September 6, 2004 Tricci So & W. Steven Conner.Slide 1 TGs ESS Mesh System Reference.
IEEE SCC41 PARs Dr. Rashid A. Saeed. 2 SCC41 Standards Project Acceptance Criteria 1. Broad market application  Each SCC41 (P1900 series) standard shall.
PAR and CSD for P802.1Qxx WG January PAR (1) 1.1 Project Number: P802.1Qxx 1.2 Type of Document: Standard 1.3 Life Cycle: Full Use 2.1 Title:
Doc.: IEEE /0684r0 Submission November 2005 Erik Schylander, PhilipsSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Standardization of Mobile Wireless Small Cell Backhaul (SCB) Document Number: IEEE r Date Submitted: Source: Junhyeong.
Page 1 IEEE Ethernet Working Group - CSD Version 2.3 Items required by the IEEE 802 CSD are shown in Black text, supplementary items required by.
Consolidated comments on LASG 802c PAR and CSD Stephen Haddock March 11,
CSD for P802.1Qcj WG January Project process requirements Managed objects – Describe the plan for developing a definition of managed objects.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 Recommendations Now that 40 GbE has been adopted as part of the 802.3ba Task Force, there is a need to consider inter-switch links applications at 40.
1 6/3/2003 IEEE Link Security Study Group, June 2003, Ottawa, Canada Secure Frame Format PAR: 5 Criteria.
Doc.: IEEE /1220r0 Submission November 2009 Jon Rosdahl, CSRSlide 1 WG11 Comments on PARs submitted Nov 2009 Date: Authors:
Doc.: IEEE /0981r0 TGs Reference Architecture Considerations August 30, 2004 Tricci So.Slide 1 TGs ESS Mesh System Reference Architecture Considerations.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
Doc.: IEEE leci SGLECIM November 2010 Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPAN) Submission Title:
IEEE mban SubmissionSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:Resolution.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
1 IEEE interim, Orlando, Florida, March, 2008new-nfinn-fast-chains-rings-par5c-0308-v1 Fast Recovery for Chains and Rings Proposal for PAR and 5.
Doc.: IEEE sru Submission 11 November 2013 M Ariyoshi, S Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0356r0 Submission March 2009 Jon Rosdahl, CSRSlide 1 New WG PARs that WG11 must consider in March 2009 Date: Authors:
Doc.: IEEE /0860r0 Submission July 2010 Jon Rosdahl, CSRSlide 1 Comments for p New PAR – July 2010 Date: Authors:
Doc.: IEEE ulp Submission Slide 1 May 2012 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE /0236r0 Submission November 2009 Wendong Hu, STMSlide 1 Responses to Comments on PAR Modification IEEE P Wireless RANs.
Privecsg Privacy Recommendation PAR Proposal Date: [ ] Authors: NameAffiliationPhone Juan Carlos ZúñigaInterDigital
IEEE Std Proposed Revision Purpose, Scope & 5 Criteria.
Contents of this presentation ● PAR material (Title, Scope, Purpose) ● Material as developed at previous meetings ● Provision for new/revised material.
Contents of this presentation ● PAR material (Title, Scope, Purpose) ● Material as developed at previous meetings ● Provision for new/revised material.
IEEE P criteria responses
PAR Review - Meeting Agenda and Comment slides - Vancouver 2017
Nov 2010 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: Resolution of PAR and 5C Comments for MBAN Study.
doc.: IEEE <doc#>
P802.1CS Link-local Registration Protocol
Review of March 2013 Proposed Pars
July 2017 Response to comments on 802.1ACct - Amendment: Support for IEEE Std  PAR and CSD July 2017 Thomas Kürner, Chair TG3d .
IEEE Wireless Coexistence TAG
IEEE SCC41 PARs Date: Authors: August 2009 August 2009
Submission Title: [SGLECIM PAR & 5C comment resolution November 2010]
July 2017 Response to comments on 802.1ACct - Amendment: Support for IEEE Std  PAR and CSD July 2017 Thomas Kürner, Chair TG3d .
Submission Title: [SGLECIM PAR & 5C comment resolution November 2010]
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: f PAR/CSD Comments Responses Date.
doc.: IEEE <492> <month year> November 2015
Submission Title: [Proposal on PAR and 5C draft for BAN]
<month year> Denver, March 2006
Privacy Recommendation PAR Proposal
Submission Title: [Proposal on PAR and 5C draft for BAN]
Submission Title: [SGLECIM PAR & 5C comment resolution November 2010]
doc.: IEEE <doc#1>
Jan Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [PAR and CSD document discussion] Date Submitted:
900 MHz ISM Band Date: Authors: January 2010 Month Year
<month year> Denver, March 2006
comments on Pending 802 PARs – July 2011
Comments for p New PAR – July 2010
What is a CA document? Date: Authors: March 2005 March 2005
March 15, 2015 Kunal Shah SG4v Chair
Submission Title: BAN closing report for San Diego, CA
IEEE Wireless Coexistence TAG
Presentation transcript:

CSD for P802.1AS-REV WG Wednesday, 05 November 2014

Project process requirements Managed objects – Describe the plan for developing a definition of managed objects. The plan shall specify one of the following: a)The definitions will be part of this project. b)The definitions will be part of a different project and provide the plan for that project or anticipated future project. c)The definitions will not be developed and explain why such definitions are not needed. a)The definitions are part of the project.

Project process requirements Coexistence – A WG proposing a wireless project shall demonstrate coexistence through the preparation of a Coexistence Assurance (CA) document unless it is not applicable. a)Will the WG create a CA document as part of the WG balloting process as described in Clause 13? (yes/no) b)If not, explain why the CA document is not applicable. Not applicable – this is not a wireless project.

5C requirements Broad market potential – Each proposed IEEE 802 LMSC standard shall have broad market potential. At a minimum, address the following areas: a)Broad sets of applicability. b)Multiple vendors and numerous users. a)The proposed revision would apply to all 802 networks composed of full duplex IEEE 802.3, IEEE , IEEE EPON, and other IEEE 802 networks identified in the scope, as a means of providing timing and synchronization for time-sensitive applications. The proposed revision would also apply to Coordinated Shared Networks (CSN). b)Many vendors and users have continually expressed their support for this standard and there are a number of implementations in the field.

5C requirements Compatibility – Each proposed IEEE 802 LMSC standard should be in conformance with IEEE Std 802, IEEE 802.1AC, and IEEE 802.1Q. If any variances in conformance emerge, they shall be thoroughly disclosed and reviewed with IEEE WG prior to submitting a PAR to the Sponsor. a)Will the proposed standard comply with IEEE Std 802, IEEE Std 802.1AC and IEEE Std 802.1Q? b)If the answer to a) is no, supply the response from the IEEE WG. – The review and response is not required if the proposed standard is an amendment or revision to an existing standard for which it has been previously determined that compliance with the above IEEE 802 standards is not possible. In this case, the CSD statement shall state that this is the case. a)Yes.

5C requirements Distinct Identity – Each proposed IEEE 802 LMSC standard shall provide evidence of a distinct identity. Identify standards and standards projects with similar scopes and for each one describe why the proposed project is substantially different. There is no other 802 standard or approved project that provides the same functionality for bridges or end stations.

5C requirements Technical Feasibility – Each proposed IEEE 802 LMSC standard shall provide evidence that the project is technically feasible within the time frame of the project. At a minimum, address the following items to demonstrate technical feasibility: a)Demonstrated system feasibility. b)Proven similar technology via testing, modeling, simulation, etc. a)There are numerous implementations of the 802.1AS-2011 standard. b)The technology has been proven in the field and in compatibility testing carried out in public testing labs.

5C requirements Economic Feasibility – Each proposed IEEE 802 LMSC standard shall provide evidence of economic feasibility. Demonstrate, as far as can reasonably be estimated, the economic feasibility of the proposed project for its intended applications. Among the areas that may be addressed in the cost for performance analysis are the following: a)Balanced costs (infrastructure versus attached stations). b)Known cost factors. c)Consideration of installation costs. d)Consideration of operational costs (e.g., energy consumption). e)Other areas, as appropriate. a)The functionality needed to provide the features specified in this standard is essentially the same in bridges and end stations. The cost of providing these features in each type of device will not be significant, given the expected large volumes. b)The cost factors are well known from implementations of 802.1AS c)There are no incremental installation costs relative to the existing costs associated with 802.1AS d)There are no incremental operational costs relative to the existing costs associated with 802.1AS e)No other areas have been identified.