1 PER-005 Update Impact on Operators System Operator Conference April 17-19 and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.

Slides:



Advertisements
Similar presentations
Joint Commission Management of Human Resources Leadership Meeting September 22, 2010.
Advertisements

Transition from Q1- 8th to Q1- 9th edition
Presented to PGDTF February 11, 2015
PER
PER Update & Compliance Lessons Learned
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
1 Reliability Coordination (IRO Standards) 2011 System Operator Conferences #3 and #4 September & 20-22, 2011 Nashville/Franklin TN Rocky Williamson.
Environmental Management System (EMS)
2014 System Operator Conference 1 Protection System Misoperations: Why Should a System Operator Give a Hoot? April 17 & May 1, 2014 – Charlotte, NC September.
ORGANIZATION. 2 Problem scenario  Develop an organizational chart for your laboratory showing lines of authority from the head of the organization to.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Unit 8: Tests, Training, and Exercises Unit Introduction and Overview Unit objectives:  Define and explain the terms tests, training, and exercises. 
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Office of Inspector General (OIG) Internal Audit
TRAINING AND DRILLS. Training and Drills Ensure A comprehensive, coordinated, and documented program as an integral part of the emergency management program.
ISO 9000 Certification ISO 9001 and ISO
Project Execution.
Conducting the IT Audit
Audit & Compliance Tips Jagan Mandavilli Senior Compliance Engineer.
Professional Development Programs
ERCOT Compliance Audits Robert Potts Sr. Reliability Analyst March 23, 2005.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
NERC PER-005 Overview May 10, Who, What, When, Where, Why WHO: RC, TOP, BA WHAT: –R1: Systematic Approach to Training –R2: Verify operator capabilities.
ERCOT SOL Methodology for the Planning and Operations Horizons Stephen Solis 2014 OTS 1.
Lisa Wood, CISA, CBRM, CBRA Compliance Auditor, Cyber Security
Basics of OHSAS Occupational Health & Safety Management System
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE.
Company duties under the ISM Code
Copyright 2010, The World Bank Group. All Rights Reserved. Statistical Work Plan Development Section B 1.
System Operation Training and System Restoration at Grant County PUD
1 Staff Food Safety Training Chapter Number 15 Class Name Instructor Name Date, Semester Book Title Book Author.
Procedures and Forms 2008 FRCC Compliance Workshop April 8-9, 2008.
Presented by: Meg Boyd The Blue Mountains Drinking Water System: DWQMS Overview.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
The views expressed in this presentation do not necessarily reflect those of the Federal Reserve Bank of New York or the Federal Reserve System Association.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Item 5d Texas RE 2011 Budget Assumptions April 19, Texas RE Preliminary Budget Assumptions Board of Directors and Advisory Committee April 19,
Monitoring and Evaluation Management of a Training Program.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Problem Areas Updates Penalties FRCC Compliance Workshop September / October
Ch 10 - Risk Management Learning Objectives You should be able to: List and describe risk management processes, inputs, outputs, and tools List and describe.
QUALITY MANAGEMENT STATEMENT
Standards Review Subcommittee Update August 17, 2010.
Loss of EMS Events 2015 System Operator Seminar. Training Objectives 2 System Operators will be able to identify the ERO Event Analysis Process Category.
Copyright 2010, The World Bank Group. All Rights Reserved. Development of Training and Procedural Manuals Section B 1.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
1 Power System Restoration. 2 Not Active 3 4 Compliance Audit Process APPA E&O Technical Conference – Atlanta April 16, 2007.
Revision N° 11ICAO Safety Management Systems (SMS) Course01/01/08 Module N° 9 – SMS operation.
Internal Audit Section. Authorized in Section , Florida Statutes Section , Florida Statutes (F.S.), authorizes the Inspector General to review.
Communications Operator Training Seminar 2016 Brian Legg & John Jarmon System Operations Training (ERCOT)
Student Learning Outcomes Assessment Montgomery College Fall 2011 Orientation.
Monitor and Revise Teaching. ObjectivesObjectives Describe how to monitor teaching List ways to contribute to broader evaluations Explain how to review.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Path Operator Implementation Task Force Vic Howell, Vice Chair Report to OC March 22, 2016.
Reliability Standard TPL Transmission System Planned Performance for Geomagnetic Disturbance Events September 28, 2016 TPL Standard Status.
Planning Geomagnetic Disturbance Task Force (PGDTF) Update to the ROS
Path Operator Implementation Task Force
Phil O’Donnell, Manager Operations and Planning Audits
Flooding Walkdown Guidance
CEO/Co-founder, SOS Intl
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
Job Tasks The Foundation of an Effective Training Program
Phil O’Donnell, Manager Operations and Planning Audits
Presentation transcript:

1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services SERC Reliability Corp.

2012 System Operator Conference 2 Learning Objectives At the conclusion of this training session, you should be able to: State the requirement and effective date for PER-005, Requirements 1 & 2 Explain PER-005 R1& R2 impact on operators List the features of task verification Identify what constitutes a task modification

2012 System Operator Conference 3 Outline of Topics FERC Order 742 – approved standards & effective dates PER-005 R1 and R2 Meaning of Reliability-Related Task Procedures for Task Verification When Must a Task Be Modified and Operators Re- Verified?

2012 System Operator Conference 4 In other reliability-related action today, FERC:  Issued a final rule (RM ) approving two proposed Personnel Performance, Training, and Qualifications (PER) Reliability Standards requiring Reliability Coordinators, Balancing Authorities, and Transmission Operators to establish training programs for their system operators. The rule directs NERC to take action with respect to operator training but does not require NERC to modify the two standards November 18, 2010 NEWS RELEASE

2012 System Operator Conference 5 FERC Order 742 Which Two Standards Are Approved? PER System Personnel Training  Applicable entities: –RCs –BAs –TOPs PER Reliability Coordination - staffing  Applicable entity: – RCs Significant change over previous training standard, PER-002

2012 System Operator Conference 6 Implementation Timeline System Personnel Training Standards Only R3 in Effect Right Now

2012 System Operator Conference 7 R1 & R2 – the “Real Meat” of PER-005 – Go into Effect in One Year! (4-1-13) Entities must use a “systematic approach” to develop a training program based on the job tasks that you perform Sounds simple, but……

2012 System Operator Conference 8 There Are many “Pieces” to a Systematic Approach to Training (SAT) Develop a list of “reliability-related” job tasks Develop learning objectives for each task Design training courses to meet those learning objectives Implement the training program (using appropriate methods like classroom, simulation, field trips, etc) Evaluate the training program and correct any deficiencies.

2012 System Operator Conference 9 Where Do We Stand? Most responsible entities have already developed their lists of “reliability-related” (RR) Tasks. And just what is an RR Task? One Suggestion:: “A task that, when not completed, or completed incorrectly or not completed in a timely manner, could result in an actual or potential SOL or IROL violation, unintended loss of firm load, cascading outages, uncontrolled system separation, or other BES Emergency.”

2012 System Operator Conference 10 Example of BA RR Task: Monitor ACE and respond to loss of supply or DCS event by applying operating reserves within allowable time frames If reserves are not applied in a timely manner following loss of generation, the reliability of the Bulk Electric System is at risk!

2012 System Operator Conference 11 Does the Development of a List of RR Tasks Affect You as an Operator? ……. Not really! As an operator, you still perform all the tasks necessary to protect the system, whether there is a task list or not! ……. But what about PER-005 R2?

2012 System Operator Conference 12 PER-005, REQUIREMENT 2: Task Verification of Performance Your entity must verify your ability to perform each task on the list at least one time, so this requirement does affect you….

2012 System Operator Conference 13 Tasks that are performed frequently could be observed by a qualified evaluator and documented as complete if you perform the task successfully. Tasks that are performed infrequently may require checkout on a simulator or in the classroom with table- top exercises to assure your capability to perform the task. PER-005, REQUIREMENT 2: Task Verification of Performance

2012 System Operator Conference 14 PER-005, REQUIREMENT 2: Task Verification of Performance Task Verification should involve: Acceptable level of accomplishment for each task. Written Task Verification Guide – with content/plan for the activity. Observation check lists. Qualified Trainer/Evaluator.

2012 System Operator Conference 15 Acceptable Level of Accomplishment This is the measurable outcome (action) associated with a task and its standards for completion. What does the System Operator need to demonstrate or discuss and how well? Example: Make the correct decision to approve, postpone or modify an equipment outage request.

2012 System Operator Conference 16 Written Guide for Task Verification Guide contains: Evaluator & operator activities Task objectives Training content Resources (equipment, material, etc.) References Useful document for both evaluator and operator being verified on a task.

2012 System Operator Conference 17 Observation Checklists Operator must be checked off as successfully completing each step of the task. Checklist can be part of Task Verification Guide. Document evidence that System Operator has achieved the objective of each task and can perform said task satisfactorily!

2012 System Operator Conference 18 Qualified Task Evaluator Experienced and knowledgeable staff must verify task performance. Evaluators should have both: Competence at performing the reliability-related tasks. Skill in communicating and guiding others.

2012 System Operator Conference 19 Task Verification Guide Example (Performance Check List)

2012 System Operator Conference 20 OJT Guide – Example 1 Task Verification Guide Example 2 (Check List is Q/A)

2012 System Operator Conference 21 PER-005, REQUIREMENT 2: Task Verification of Performance PER-005 R2.1 also provides for task modification or the addition of new tasks. Within 6 months of a new or modified task, you must be verified on that task.

2012 System Operator Conference 22 PER-005, REQUIREMENT 2: What Constitutes “Modification” to an RR Task? A modification to an existing R-R task occurs as a result of a significant change to the way a task is performed (steps) or the knowledge requirements (objectives) for task performance. For example……..

2012 System Operator Conference 23 PER-005, REQUIREMENT 2: What Constitutes “Modification” to an RR Task? New tools, applications, equipment needed to perform task. New procedures that change how a task is performed. New NERC Standards that change how the task is performed Job scope changes Change in task to close a performance gap Change in task as a result of a mitigation plan following review of an event.

2012 System Operator Conference 24 Where Do we Stand With Task Verification? On Track to Meet April 1, 2013 Effective Date?

2012 System Operator Conference 25 Summary PER-005 R1 requires a training program be developed based on a systematic approach. R2 requires each operator be verified on each RR task at least once. Both R1 & R2 are effective April 1, PER-005 R2 has the biggest impact on operators, since each operator must be verified that they are capable or performing each RR task successfully.

2012 System Operator Conference 26 Summary, continued Task verification should include: acceptable level of accomplishment, a written guide, operator check-sheets, qualified evaluator. An RR task should be modified when there are new tools, new procedures, new standards, changes in job scope, changes to close a performance gap, changes triggered by mitigation plans

2012 System Operator Conference 27 Questions?