AIM CPM/LOM Tom Bonnano N74 21 August 2014.

Slides:



Advertisements
Similar presentations
Authoring Instructional Materials (AIM)
Advertisements

Module N° 4 – ICAO SSP framework
South Carolina ~ VTECS Workshop June 26, 2007 South Carolina ~ VTECS Workshop June 26, designed to manage Career Cluster & Occupational Analysis.
MT Continuum Status 23 Aug 11 Jake Aplanalp, AIM Pgm Mgr Mike Lueken, LM SS for SSP Wendy Pester, CSF for SSP Joe Farbo, LSI Jamie Stewart, AIM team.
Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando December 2008 Implementing AIM at Your Activity – A General.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Jake Aplanalp, AIM Pgm Mgr 23 Aug 11.
Demonstrations AIM II CTTL Import to CPM for pre-JDTA
AIM User Training Status
AIM User Training Status 24 August 2011 Tiffany Dombrowski, AIM Pgm Mgr Dave Donnelly, CSFE, AIM User Training CCMM Yvette Bartholomew, CPPD, CD Course.
Mr. Mike Mosley Learning Standards Branch Head 04 Feb 2014
Unclassified: Pre-Decisional 1651 v1.1 AIM FRB May 2010 Mr. Larry G. Paige II Head, Navy Policy, Strategy, Vision and Requirements (N152) Total Force Training.
Code 10 Navy Workforce Classification Department.
BENEFITS OF SUCCESSFUL IT MODERNIZATION
Mr. Tom Bonnano Learning Standards Branch Head 24 FEBRUARY 2015
A Navy Business Initiative Defense Daily OA Summit 12 November 2013 Nickolas H. Guertin, PE Director for Transformation DASN RDT&E
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 LCDR Brewster, NAVMAC Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD 18.
MT Continuum Status 21 August 2014 Presented by Bryan Miller, LMSSC Gerry Cullison, SSP Peter St Jacques, NUWC MTC Lead System Integrator.
1 AIM User Training 4 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr Dave Donnelly, CSFE, AIM Course CCMM Yvette Bartholomew, CPPD, Curr Dvlp Course.
Authoring Instructional Materials (AIM)- Interactive Electronic Technical Manual (IETM) Interface December 2008.
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
AIM Background & Current Capabilities Brief to FRB Jake Aplanalp AIM/CPM Program Manager NAWCTSD Orlando November,
Technology Steering Group January 31, 2007 Academic Affairs Technology Steering Group February 13, 2008.
AIM Program Software Status
Software Capabilities Status Software Capabilities Status Danette Likens and Mike Coyle AIM Team 19 September 2012.
NETC N6 Status Update on AIM in the NETC Enterprise Architecture 23 Aug 11 Bruce Bare, NETC, N62 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
Professional Systems Associates, Inc. We’ve been building powerful, people-oriented software solutions for commercial and government.
Modernized AIM Functional Requirements 6 November 2009 Ron Zinnato, NAWCTSD, AIM Lead S/W Eng Jamie Stewart, AIM Team.
NETC N72 Status Update to AIM FRB NETC N72 Status Update to AIM FRB John Wishall 23 April
New and In-Process Software Capabilities Status Update to AIM FRB New and In-Process Software Capabilities Status Update to AIM FRB Danette Likens and.
NETC N7 Status Update to AIM FRB NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 George Vogel, NAVMAC 00C Tiffany Dombrowski, AIM Pgm Mgr, NAWCTSD.
Navy Job Analysis (NJA) 1.  Purpose: Restore, streamline and improve Navy Job Analysis Management Capabilities  Supports: Navy Occupational Classification,
1 Bruce Bare NETC Authoring Instruction Materials (AIM) Roadmap February 2014.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Problem Identification
MT Continuum Status 3 Apr 12 Tiffany Dombrowski, AIM Pgm Mgr Gerry Cullison, SSP Mark Campbell, MT Continuum Team Jamie Stewart, AIM team.
Professor Norah Jones Dr. Esyin Chew Social Software for Learning – The Institutional Policy of the University of Glamorgan ICHL 2012, China
What is a Business Analyst? A Business Analyst is someone who works as a liaison among stakeholders in order to elicit, analyze, communicate and validate.
SATERN for Supervisors Updated: January Session Objectives At the end of the session, participants will be able to:  Describe the benefits of SATERN.
SOW Update SOW Update Mike Matzko AIM Team 21 August 2014.
NETC N7 Status Update to AIM FRB Roy Hoyt, NETC N74 Leslie Lucas, SLC LSO Jake Aplanalp, AIM Pgm Mgr Feb 11.
NETC N7 Update to AIM FRB NETC N7 Update to AIM FRB Mike Mosley, NETC N74 23 April
 PBMA-KMS deployed in March of 2001 is the first fully operational NASA-wide multi-functional Knowledge Management System  Knowledgebase 200+ Best Practices.
AIM Toolset Interfaces with Authoritative Technical Data 4 April 2012 Jim Ferrall, AIM Team.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
7 Aug Integrated Shipbuilding Environment (ISE) ISE-6 Phase 2 DDG 1000 TDWG Collaboration Data Module Code (DMC) Naming Overview.
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
How the AIM Consortium is Contributing the Implementation of NIMAS and Beyond May 5, 2008.
In-Process and Potential Future Software Capabilities Status In-Process and Potential Future Software Capabilities Status Danette Likens and Jamie Stewart.
Developing a Project Management Standard for Your Organization Francine DiMicele, PMP June 08, 2015 NC Piedmont Triad Chapter.
Linking Blended Learning to Navy Fleet Performance Requirements, REAL-TIME Jake Aplanalp Naval Air Warfare Center, Training Systems Division.
AIM FRB Meeting Overview 4-6 November 2009 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
UN UNCLASSIFIED Individual and Staff Joint Training Working Group 29 March 2010 MAJ Bill Coryell JS J-7 Policy Integration Branch.
1 NETC N7 Status Update to AIM FRB 4 November 2009 Roy Hoyt, NETC N74 Jake Aplanalp, NAWCTSD, AIM Pgm Mgr.
AIM Program Software Status FRB/CCB Meeting 24 February 2016.
Block Learning / Ready Relevant Learning and
Code 10 Navy Workforce Classification Department.
Presented by Diana Mitchell Beaumont ISD Central Medical Magnet High School.
NYSED Policy Update Pat Geary Statewide RSE-TASC Meeting May 2013.
Individual and Staff Joint Training Working Group
Enterprise Algorithm Change Process
focus areas – what we want to achieve…
CAPT RUSTY STILES Deputy Fleet Surgeon U.S. Fleet Forces Command
AIM Program of Record Roadmap for Migration and Sunset
Hoop Magic Sports Academy Educational Technology Center
AIM Program of Record Roadmap for Migration and Sunset
{Project Name} Organizational Chart, Roles and Responsibilities
IT Next – Transformation Program
NMDWS Internship Portal
Project Certification Planning Phase August 27, 2014
Presentation transcript:

AIM CPM/LOM Tom Bonnano N74 21 August 2014

EXECUTIVE SUMMARY Nature of Brief Issue Summary Context /Directive Training Effectiveness Production Efficiency Disciplined Employment of Leading Edge IT Career Long Sailor Learning and Development NETC Workforce Development EXECUTIVE SUMMARY Nature of Brief Decisional/Informational Source Documents: NETCINST 1500.10A (Sep 19, 2013) NAVEDTRA 136 (Nov 2010) NAVEDTRA 137A (July 2013) Issue Summary AIM CPM/LOM Conversion Issues Inadequate Training System Reliability Lack of a Prioritized Implementation Plan Acquisition Program Considerations Resource Constraints TE PE IT L&D WF Context /Directive AIM CPM/LOM is NETC’s targeted tool for developing and maintaining content New development/revisions shall be completed in AIM CPM/LOM Current guidance directs content conversions to be completed by 01 OCT 2016 Desired End State NETC content in AIM CPM/LOM Recommendation Enhance training across NETC Domain Improve System Reliability Revise NETCINST 1500.10A to accommodate analysis, acquisition program considerations and prioritization of content conversion. Develop tailored POA&Ms with each Learning Center for content conversion Seek contract support funding to assist in conversion efforts when available

CPM/LOM What is CPM? What is LOM? The Content Planning Module (CPM) is a planning, analysis and design tool used to capture work requirements for specific jobs, duties and tasks. This information is then used to develop training solutions to achieve desired Fleet performance requirements. What is LOM? The Learning Objective Module (LOM) is a content development tool that develops training content based on approved performance requirements captured in the CPM processes.

BENEFITS OF AIM CPM/LOM Directly links performance requirements of work to training content in an integrated web based environment Standardizes and enhances instructional systems design processes Promotes and enables Reuse, Repurpose, and Reference (R3) capabilities for the analysis of performance requirements and development of supporting curricula Reduces content development costs Potential reduction in AIM systems costs when legacy applications usage is reduced/phased out

TRAINING ISSUES Current Training: Future Training: AIM Help Desk: NETC N7 provides End-to-End (E2E) training to Learning Centers and curriculum developers NETC N7 developed and promulgated a SOP that supports the development of content using AIM CPM/LOM. Updates to the SOP will include content conversion. Contractor developed Buttonology training is available to system users Future Training: NETC N7 will develop an AIM CPM/LOM curriculum developer COI AIM Help Desk: Support provided by NAWCTSD (Mr. Mike Matzko (757) 322-9840)

SYSTEM ISSUES Software issues can be addressed via the AIM System Help Desk Network connectivity issues are addressed with the Service Provider (NETPDTC) and the AIM Technical Program Manager, as appropriate

PRIORITIZATION ISSUES NETCINST 1500.10A to be revised based upon an executable conversion plan for each Center NETC N7, working with Centers, will prioritize course conversions and develop a POA&M for each Center Progress to be tracked via Center Readiness Briefs

ACQUISITION PROGRAM AND RESOURCE ISSUES OPNAVINST 1500.76C mandates compliance with NAVEDTRA 130-140 series guidance for courses transitioning to NETC Change transmittals to NAVEDTRA 130 and 131 will direct all new training development to be in AIM CPM/LOM Analysis to be conducted by NETC N7 and Learning Centers will address conversion costs and resource alternatives

SUMMARY AIM CPM/LOM will house Navy training content in a single repository eliminating stand alone computers with multiple versions of AIM I and AIM II software AIM CPM/LOM will facilitate Reuse, Repurpose, and Reference (R3) of content across Learning Centers; thereby reducing content development costs NETC N7 will work with each Learning Center to develop an executable conversion plan that meets NETC priorities in a resource constrained environment