NERC Operating Committee Activities Update September 16-17, 2014 Meeting.

Slides:



Advertisements
Similar presentations
1 IEEE Power Engineering Society IEEE Standard 762: Standard Definitions for Use in Reporting Electric Generating Unit Reliability, Availability, and Productivity.
Advertisements

Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 1, 2011.
Reliability in the International Arena Alberta Perspective
PJM© PJM DOCs # Frequency Response Drafting Team Frequency Response Background Frequency Response Standard History Briefing on Frequency Response.
Frequency Responsive Reserve Process Update
WECC Reliability Based Control Field Trial
WECC-098 Gov Droop DT May 29, BAL Requirements R1. Each Frequency Response Sharing Group (FRSG) or Balancing Authority that is not a member.
NERC Operating Committee Activities Update June 10-11, 2014 Meeting.
Current Activity Summary
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
WECC Reliability Based Control Field Trial
ISAS Update August 2, 2011 Market Issues Subcommittee.
WECC Reliability Management System Tagging Requirements Before the WECC MIS Meeting November 13, 2009 By David Lemmons.
Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PER
January 9, 2013 BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC.
Recent NERC Standards Activities RSC – Jan. 5, 2011 NSRS Update Date Meeting Title (optional)
SAR-003-TRE-001 FERC-Ordered Modification to ERCOT waiver CPS2 Prepared By Ananth Palani, EnergyCo.
State of Standards and Standards in Development Sean Cavote, Manager of Standards Development WECC Operating Committee Meeting March 26, 2015.
System Operator Conference NERC Standards Review for: Simulator Drill Orientation 2014 System Operator Conferences Charlotte NC & Franklin TN SERC/SOS.
Operating Committee Chair Report Scott Kinney, OC Chair March 25, 2015.
1 Communications Protocols Issues Update System Operator Conference May 1-3, 2012 Columbia, SC Herb Schrayshuen, VP Standards and Training, NERC.
NERC BAL Frequency Response Reliability Standard
Update in NERC CIP Activities June 5, Update on CIP Update on Revisions to CIP Version 5 –BES Cyber Asset Survey –Implementation Plan Questions.
April 11, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board Standards Development Process.
Evolving NERC Standards Processes and Practices Paradigm Shift.
Standards Update Project Geomagnetic Disturbance Mitigation Kenneth A. Donohoo, Oncor Electric Delivery Co LLC Chairperson, GMD Task Force Presentation.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
NERC Data Collection & Coordination. Rules of Procedure: Section 1600 Overview  NERC’s authority to issue a mandatory data request in the U.S. is contained.
May 16, 2007 Board of Directors Texas Regional Entity Division Update Sam R. Jones ERCOT President & CEO.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
Board of Directors Meeting February 26, 2013 Standards, Registration and Certification Report.
Project (COM-001-3) Interpersonal Communications Capabilities Michael Cruz-Montes, CenterPoint Energy Senior Consultant, Policy & Compliance, SDT.
Project Real-time Monitoring and Analysis Capabilities Mark Olson, Senior Standards Developer Texas RE NSRS October 5, 2015.
NERC Reliability Standards - Development Process: Involvement & Needs Presentation to MOSC January 14, 2004 Khaqan Khan Independent Electricity Market.
Bill Lewis, Compliance Team Lead NERC Reliability Working Group May 16, 2013 Texas RE Update Talk with Texas RE April 25, 2013.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
The Electric Reliability Organization: Getting from here to there. Gerry Cauley Director, Standards ERO Project Manager ERO Slippery Slope NERC Today Uphill.
NERC Project S ystem Protection Coordination - PRC-027​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
Andy Meyers Bonneville Power Administration Operating Committee Update ISAS April 2015 Salt Lake City, UT.
Draft Reliability Standards Development Plan Ryan Stewart, NERC Manager of Standards Development Texas RE NSRS August 17, 2015.
Standards Review Subcommittee Update August 17, 2010.
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
NERC Project PRC-005 FERC Order No. 803 Directive ​ Presentation to the NSRS Conference Call August 17, 2015 Sam Francis Oncor Electric Delivery.
WECC Standards Update Steve Rueckert – Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
1 TAC Report to the ERCOT Board February 16, 2005.
1 Texas Regional Entity Report November Performance Highlights  ERCOT’s Control Performance Standard (NERC CPS1) score for September –
WECC Standards Update Steve Rueckert Director of Standards W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Projects System Protection Coordination Draft 2 of TOP Texas Reliability Entity NERC Standards Reliability Subcommittee November 2, 2015.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
Electric System Financial Results Financial Planning Budget and Rates Building Community Reliability Standard Advisory Service NERC Onsite Visit, Feb 2013.
NERC BAL-005, BAL-006, FAC-001 Gary Nolan WECC ISAS April 20, 2016.
WECC – NERC Standards Update
Kenneth Silver Los Angeles Department of Water & Power
WECC Regional Standards Update
ERCOT Technical Advisory Committee June 2, 2005
Kenneth Silver Los Angeles Department of Water & Power
Kenneth Silver Los Angeles Department of Water & Power
Rates & Regulatory Updates
The Electric Reliability Organization: Getting from here to there.
Coordinate Operations Standard
Steve Rueckert – Director of Standards
Kenneth Silver Los Angeles Department of Water & Power
WECC – NERC Standards Update
Presentation transcript:

NERC Operating Committee Activities Update September 16-17, 2014 Meeting

Current Activity Summary Topics Discussed Open Positions on NERC Operating Committee Essential Reliability Services Task Force BAL-001-1, BAAL (RBC) Field Trial Report GridEx III Lessons Learned Events US Department of Energy Research and Development Program Revisions to TOP/IRO Reliability Standards Standards of Interest 2

Current Activity Summary Open Positions on NERC Operating Committee Energy Marketer Small End-Use Electricity Customer Essential Reliability Services (ERS) Task Force Developing a primer on essential reliability services for regulators, policy makers, and industry leadership. BAAL (RBC) Field Trial Report Field Trial Report for NERC OC by BARC Drafting Team GridEx III Scheduled for November 18-19,

Current Activity Summary Lessons Learned British Columbia – Alberta Separation U.S. Department of Energy Research and Development Program Investigate emergent issues that impact the reliability of the BES Revisions to TOP/IRO Reliability Standards Passed o IRO-001-4, IRO-002-4, IRO-008-2, IRO-010-2, IRO-14-3, IRO o TOP-002-4, TOP Failed o TOP

Current Standards Activity Standards of Interest Standard BAL – The Ballot Failed,,, again! Standard BAL – Implementation Status Standards BAL-004, 005, & 006 – Update Periodic Review 5

BAL Implementation Compliance with BAL shall be implemented over a two-year period, as follows:  In those jurisdictions where regulatory approval is required, Requirements R2, R3 and R4 of this standard shall become effective the first calendar day of the first calendar quarter 12 months after applicable regulatory approval. In those jurisdictions where no regulatory approval is required, Requirements R2, R3 and R4 of this standard shall become effective the first calendar day of the first calendar quarter 12 months after Board of Trustees adoption.  In those jurisdictions where regulatory approval is required, Requirements R1 of this standard shall become effective the first calendar day of the first calendar quarter 24 months after applicable regulatory approval. In those jurisdictions where no regulatory approval is required, Requirements R1 of this standard shall become effective the first calendar day of the first calendar quarter 24 months after Board of Trustees adoption.  Requirement R1 cannot be implemented prior to the addition of Frequency Response Sharing Group to the Compliance Registry. 6

BAL Requirements R1 – BAs must achieve an annual Frequency Response Measure (FRM) that is more negative than its Frequency Response Obligation (FRO). R2 – BAs using fixed Frequency Bias Settings (FBS) must use determination method described in Attachment A. R3 – BAs using a variable FBS shall maintain setting that is: 3.1Less than zero at all times and 3.2Equal to or more negative than its FRO when frequency varies from 60 Hz by more than ±0.036 Hz. R4 – Each Balancing Authority that is performing Overlap Regulation Service shall modify its Frequency Bias Setting in its ACE calculation, in order to represent the Frequency Bias Setting for the combined Balancing Authority Area, to be equivalent to either: o The sum of the Frequency Bias Settings as shown on FRS Form 1 and FRSForm 2 for the participating Balancing Authorities as validated by the ERO, or o The Frequency Bias Setting shown on FRS Form 1 and FRS Form 2 for the entirety of the participating Balancing Authorities’ Areas.

BAL Implementation Plan Revised August 20, 2014

9 Questions