Lyon Gantry Status TEC meeting Dec. 2003 D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term.

Slides:



Advertisements
Similar presentations
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Advertisements

Status Update on Mechanical Prototype in Rome November 6,
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
CMS Tracker Week – Gantry Meeting – 21 st October 2003 – Dean White 1 Status of the UCSB Gantry Dean White University of California Santa Barbara October.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
LHCC referees meeting, 10 October 2005Børge Svane Nielsen, NBI1 Status of the FMD LHCC referees meeting, 10 October 2005 Børge Svane Nielsen Niels Bohr.
US Tracker Group Status Sep. 1, 2005 J. Incandela For the US CMS Tracker Group.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
Slide 1-OGP status & module reinforcementDOE review, January 20, 2004 Status of OGP & Module reinforcement Andrea Allen Development Technician DOE Review.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
1 Fulvio TESSAROTTO Update on the thin RICH beam pipe project - prototypes validation and pipe production - microflanges and fixation system - the intervention.
Status Brussels GANTRY Ê Overview of the pilot run (second week of October) 4 aims and achievements 4 accuracy on position and angles 4 residual features.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
Mickael Frotin– 07/06/2009 Demonstrator - Assembly ECAL meeting - London.
Status Brussels GANTRY Ê Assembly of R3 modules (36 modules) 4 precision of the modules 4 problems with DataBase (not adapted for single sensor modules)
Mickael Frotin– 15/01/2010 ECAL MACHANICAL R&D ECAL meeting - PARIS 1.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Status Brussels GANTRY Ê Recovered from the Gantry PC crash during Pilot Run R6 4 same situation as before the Pilot Run is achieved for R6 Ë Comparison.
LHCf Arm2 – status of hardware upgrade in Firenze Lorenzo Bonechi 20 December 2013.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
EE planning meeting Lucie Linssen 1 CERN EE regional centre and Dee assembly plans Dee assembly TA3, not for EE Supercrystal regional centre.
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
G.Sirri – INFN Bologna Videoconf Gluing machine New solution under test: rigid plastic frame instead of lateral tapes and.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Status Brussels GANTRY Ê Try to assemble modules with good precision 4 different calibration plates (Karlsruhe and Bari) 4 determination of pin positions.
Brussels Gantry Ê Problem with vacuum chambers in plate 4 leaks in plates with gives communication between positions Ë Problem with rotation motor (U-motor)
RP detectors CTS Sensors now in production, full delivery between February and June 07 Production GUI and DB being finalised Test Procedure being defined.
Design and development of micro-strip stacked module prototypes for tracking at S-LHC Motivations Tracking detectors at future hadron colliders will operate.
Brussels Module Production Ê We have producted 57 R6 modules and 26 R5N modules 4 of which 67 grade A and 9 grade B and 7 outside specifications Ë We have.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Resistive protections Rui de Oliveira 09/12/15
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
Status Brussels GANTRY Ê New measurements of pin positions 4 using short pins rather than long ones 4 improved the precision Ë Cross-check of precision.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Lyon Gantry Status CERN 15 Sept D. Contardo Calibration Plates and Tools Readiness for production.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
Grid Pix Field Simulations and precision needed for a module Peter Kluit, Jan Timmermans Prepared 16 May 2016.
K.Gadow - DESY 1 The HCAL barrel absorber structure Design Status
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
BM&N STS ladders assembly in VLHEP
Detector building Notes of our discussion
Update on Pavia MM mechanical prototype
Service channels between Tracker and PP1
Grid Pix Field Simulations and precision needed for a module
Gluing jigs for Demonstrator
Status Brussels GANTRY
Far Detector Activities Late 2017 – Early 2018
2S module geometry updates Module positioning concepts
Status Brussels GANTRY
Vienna Module Production
CMS Perugia Modules Production Review
Module Production in Brussels
Module Production in Brussels
Status of Bonding R1N, R1S, R3 of TEC University of Hamburg
Outer Tracker Module Design meeting, 27 January 2014 News on the PS and 2S module geometries 200 W / 2m 100 W / 5m News on PS and 2S module geometries,
Presentation transcript:

Lyon Gantry Status TEC meeting Dec D. Contardo Module production in Lyon Rigidifier test on R4 Frame tolerance effect on assembly plates Short term plan

Plates status 2 R1 ==> were either N or S, now must be dedicated due to ridigifier 1 R1S + 1 R1N 1 R3 ==> new, validated 2 R4 ==> gluing with ridigifier tested in one position - operation OK no precision loss - some touch up needed 5 R7 ==> all ready All plates are validated (but one R7) and need to be machined for rigidifiers implementation Bias glue works well Calibration plate at the Metrology Group at Cern : should be ready before Christmas Sensor handling tool received Lyon plate status

Assembly statistic 8 R4, 2 in December NEW 18 R7 2 R1N full modules done in November 2 R1S full modules done in November 7 R3 done in December NEW All 11 last modules are valid in the DB and show precisions as good as those presented at last meeting (Oct 21, 2003) for the 18 R7 1 R4 WITH RIDIFIER NEW Lyon module production

Lyon R4 with rigidifier Rigidifier position on the plate Back of the R4 prototype after gluing

- Rigidifier positioning to close to the frame, less than the 100mu specified, will be modified - Walls around the rigidifier too thin, will be modified - Vacuum below the rigidifier ok - Position precision of sensor and hybrid positioning not affected - Positioning of the hybrid so that spacers half on the frame cross piece half out to be better defined. Present R4 prototype : the distance between pitch and sensor edge is 100mu (for a loose specification of 100 to 300mu). Given this, the spacer is out of the frame by 1.4mm and not 1.5 still it is close to the spacer positioning precision ~ 500mu No principle problem observed to glue the rigidifiers at the gantry for R1-R3-R4. Needs more statistics to understand if tolerances can affect the process. Lyon R4 with rigidifier

Effect of frame thickness tolerances Present status of plates : distance from frame (bottom) to sensor (bottom) R1-R3-R4 : 750 (frames) (kapton + glue) + 50 (tolerance) R5-R6-R7 : 650 (frames) (kapton + glue)

Effect of frame thickness tolerances Measured graphite thickness : 740 mu to 800 mu mean 770 mu (plus peak above 800mu) Measured Kapton thickness : 160 to 220 mu mean 190 mu Measured thickness at the glue pocket : 750 mu to 860 mu mean 820 mu R1-R3-R4 : 970 (mean pocket) compared to 1000 (plate) with 940 min 1000 max Space between sensor and kapton top at 30 mean 60 max 0 min R5-R6-R7 : 820 (mean pocket) compared to 850 (plate) with 750 min 860 max Space between sensor and kapton top at 30 mean 100 max -10 (leak) Measurement : we can slide a 100 mu foil in between the legs and the sensors for R3 and R6 Conclusion : - Similar situations for all plates we don’t modify them before further investigation : - try to increase thickness of small geometry frames (simulated with calibrated spacers up to apparition of leaks below sensors. - Do more measurements - Try to measure effect on cooling

Short term plan - Produce 4 R1N + 4R1S for petal integration with rigidifiers glued by hand - Modify plates R4 and R7 for rigidifiers in priority (ready for mid-january) then R1S/R1N/R3 * Proposal to track frames as anyother componant : Put the module 1D labels at the frame assembly and register the frames as modules in the central DB. (difference between assembled and empty modules (frame) possible In DB Browser).