Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager.

Slides:



Advertisements
Similar presentations
E821 SC Inflector and Beyond Wuzheng Meng 12 June 2008.
Advertisements

The US 5 Year Muon Acceleration R&D Program To Boldly Go… MICE Collaboration Meeting Harbin January, 2009.
The MICE Target Lara Howlett University of Sheffield.
CERN First Considerations to implement nuSTORM on the CERN site “North Area Neutrino Hub” E.Wildner, CERN Wednesday, March 27, 2013Elena Wildner,
P.-R. KettleMEG-Review February MEG Beam Line Studies  E5 Z-Branch NOW !!! NOW !!!
Operations and Availability GG3. Key decisions Summary of Key Decisions for the Baseline Design The linac will have two parallel tunnels so that the support.
Muon g-2 Muon g-2 Experiment Quarterly Report Aria Soha All Experimenter’s Meeting March 2, 2015.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
Frictional Cooling MC Collaboration Meeting June 11-12/2003 Raphael Galea.
1 g-2 phase study from GEANT simulation Qinzeng Peng Advisor: James Miller Boston University Sep 28, 2004 Muon g-2 collaboration at BU: Lee Roberts, Rober.
Neutrino Study Group Dec 21, 2001 Brookhaven Neutrino Super-BeamStephen Kahn Page 1 Horn and Solenoid Capture Systems for a BNL Neutrino Superbeam Steve.
Muon Campus Controls Update Brian Drendel 8/6/13.
HPS Test Run Setup Takashi Maruyama SLAC Heavy Photon Search Collaboration Meeting Thomas Jefferson National Accelerator Facility, May 26-27,
Fermilab Neutrino Beamline to DUSEL Mike Martens Fermilab PAC November 3, 2009.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Storage Ring : Status, Issues and Plans C Johnstone, FNAL and G H Rees, RAL.
 A GEANT4-based simulation was performed of the production target, solenoid, selection channel, and spectrometer.  The acceptance was found to be 8.3x10.
NuMI NuMI Overview NBI 2002 S. Childress (FNAL) 14 March ‘02 NuMI / MINOS Overview.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Original plan for secondary line installation. Hadron hall beamlines in Phase1 Hadron hall secondary beamlines ① ② ③ ④.
Muon Campus Projects Jerry Annala Jan 23, µ AIP Scope Recycler RF system to provide needed bunch structure to future Muon Experiments Recycler RF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
Mu2e Experiment and Issues Rick Coleman, Fermilab RESMM’12, February 2012.
TWIST A Precision Measurement of Muon Decay at TRIUMF Peter Kitching TRIUMF/University of Alberta TWIST Collaboration Physics of TWIST Introduction to.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
Injector PP Setup Plan and Status November 18, 2008 Haixin Huang.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
G2p/gep Beamline Project Overview Tim Michalski Project Lead.
Technical Board and Safety Summary Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
G-2 accelerator and cryo needs Mary Convery Muon Campus Review 1/23/13.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
June 17, 2004 / Collab Meeting Strategy to reduce uncertainty on a  to < 0.25 ppm David Hertzog University of Illinois at Urbana-Champaign n Present data.
Overlap of Project X and Beamline to DUSEL June 2, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
TD Designs for mu2e Solenoid Magnets Michael Lamm for the Mu2e Collaboration and TD/Magnet Systems Dept. All Experimenters’ Meeting January 25, 2010.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
Mu2e Mu2e CD-2 Review Template Eric Prebys Extinction October 21-24, 2014.
SBS Magnet and Infrastructure Status Robin Wines July 2015.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
1 Question to the 50GeV group 3GeV からの 54π と 81π 、 6.1π の関係 fast extraction 部の acceptance (81π?) Comments on neutrino beamline optics?
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
Dual Target Design for CLAS12 Omair Alam and Gerard Gilfoyle Department of Physics, University of Richmond Introduction One of the fundamental goals of.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
COMET. μ-e conversion search from muonic aluminium J-PARC pulsed proton beam to produce pulsed muon beam Forbidden in the Standard Model  clue to the.
MICE hydrogen review Introduction to MICE. After the LHC… Many open questions in physics: Gravity & standard model Matter-antimatter imbalance Dark matter.
 A model of beam line built with G4Beamline (scripting tool for GEANT4)  Simulated performance downstream of the AC Dipole for core of beam using  x.
COMPENSATION OF DETECTOR SOLENOID FIELD WITH L*=4.1M Glen White, SLAC April 20, 2015 ALCW2015, KEK, Japan.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Tau31 Tracking Efficiency at BaBar Ian Nugent UNIVERSITY OF VICTORIA Sept 2005 Outline Introduction  Decays Efficiency Charge Asymmetry Pt Dependence.
Assembly 12/14/06 #1 Assembly and Commissioning Paul Huffman.
Neutrinos from Stored Muons STORM physics with a μ storage ring.
E989 Muon (g-2) EMG Lee Roberts for the E989 Collaboration B. Lee Roberts - EMG- 13 February
WBS – 30 Straight Section Reconfiguration g-2 Accelerator – 30 Straight Section Reconfiguration D. Still Fermilab Muon g-2 IDR, June 5-7.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
1 Muon g-2 Experiment at BNL Presented by Masahiko Iwasaki (Tokyo Institute of Technology) Akira Yamamoto (KEK) for E821 g-2 Collaboration: Boston, BNL,
Long-Baseline Neutrino Facility LBNF News and brief overview of Beamline plans for the next few months Vaia Papadimitriou Beamline Technical Board Meeting.
Geant4 in the FNAL g-2 Experiment Kevin Lynch Boston University August 2009 g-2 Collaboration Meeting.
Muon Ionisation Cooling Experiment Overview
Resource Loaded Schedule and Budget Profile
Status of the MICE Construction Project
Summary of Muon Studies Yoke Discussion
AD consolidation activities in LS2
News and brief overview of Beamline plans for the next few months
nuSTORM at Fermilab D Adey
Joint Meeting SPS Upgrade Study Group and SPS Task Force
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
A High Intensity Neutrino Oscillation Facility in Europe
IR/MDI requirements for the EIC
Presentation transcript:

Muon g-2 Inflector AEM Meeting 11/25/2013 Chris Polly Muon g-2 Project Manager

Muon g-2 Inflector 2 outer coil yoke coil Inflector used to bring beam from outside storage ring and onto an interior orbit 11 November 2013 Chris Polly All Experimenters Meeting

Pictures 3 Closed windings cause multiple scattering -> beam blows up and about half of muons lost About 2m long and as big around as a football Inserted inside cryostat that is part of a special vacuum chamber 11 November 2013 Chris Polly All Experimenters Meeting

Technically challenging 4 - Geometrically tight region - Large Lorentz forces when magnet is powered - Has to produce 1.5T bucking field to cancel main field - Can’t perturb muon storage ring by more than ~1ppm so whole thing is wrapped in a superconducting shield - Coil winding has to be self- cancelling to the point that the stray fields don’t saturate the superconducting shield - Design interfaces with optics of final beamline 11 November 2013 Chris Polly All Experimenters Meeting

Simulated improvements 5 - Have known about this factor of 2 from back-of-the-envelope calculations used in the proposal - Have since developed a full Geant 4 model of the ring - Some very nice work by Thomas Gadfort has confirmed the potential gains 11 November 2013 Chris Polly All Experimenters Meeting

Reminder of rates at FNAL 6 Achieving required statistics is a primary concern - Need a factor 21 more statistics than BNL - Beam power reduced by 4 Need a factor of 85 improvement in integrated beam coming from many other factors - Collection of pions from lens - Capture of decay muons in FODO channel - p π closer to magic momentum - Longer decay channel - Increased injection efficiency - Earlier start time of fits - Longer runtime What is a new inflector worth? - Estimate ~$3M/yr operation cost - Hard to put a price on expanded physics scope Ratio of beam powers BNL/FNAL: 4e12 protons/fill * (12 fills / 2.7s) * 24 GeV 1e12 protons/fill * (16 fills / 1.3s) * 8 GeV = November 2013 Chris Polly All Experimenters Meeting

So why is a new one needed? 7 1) If for some reason we don’t achieve all of the rate factors assumed in the prior page then this extra factor of 2 might be the only thing saving the experiment from significant additional operating costs and years of run time. 2) The existing inflector represents a single point of potential failure with no backup. Had developed a He leak in E821 which we think is in the lead can and should be repairable, but not conclusively shown at this point. 3) Even if all of the other beam improvements come through, we can use the factor of 2 in rate to do more physics. Options included - Reducing the error on the μ- experiment by another sqrt(2) if systematics are shown to be controlled at better-than-expected level - Better collimation of muon beam to be in region where magnetic field is more uniform - Re-running μ- measurement a second time with a different set of environmental conditions to verify systematics are understood - Run the experiment with μ+ for a test of CPT violation 11 November 2013 Chris Polly All Experimenters Meeting

Status 8 - Rough estimate $ M - Not in baseline plan shown at CD-1 because conceptual design did not exist - Included in risk registry as $1.5M +/0 $0.5M risk with 25-75% probability - We were hoping that the UK would get funded to be a major player in developing this intellectually challenging and important piece of equipment - Found out that the UK did get approved for $1.8M in funding for straw tracking, but STFC rejected the portion having to do with inflector - Still some possibility for foreign investment from UK or Korea, but we have to make this happen ourselves - Have hired Brett Parker and BNL group to lead winding design - Need to identify who at FNAL can be responsible for leading the effort to produce the fully-integrated device and be responsible for it during operations 11 November 2013 Chris Polly All Experimenters Meeting

BNL winding technology 9 - Rough estimate $ M - Not in baseline plan shown at CD-1 because conceptual design did not exist - Included in risk registry as $1.5M +/0 $0.5M risk with 25-75% probability - We were hoping that the UK would get funded to be a major player in developing thi 11 November 2013 Chris Polly All Experimenters Meeting

Schedule presented at DOE CD-1 CD-0 Forecast Objective KPPs Satisfied CD-1 CD-2/3a CD-3 Conceptual Design Prelim Design Prelim Design CD 3a Work Final Design Final Design Ring/Field/Detector Implementation Accelerator Implementation Close- out CD-4 Forecast Includes controls to MC-1 bldg, possible advancement of D30 straight reconfiguration xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff Ring & Detectors Ready for Ops Accelerator Complete MC-1 Building Design and Construction Ring Reassembly Construction of NSF/Early Career funded detector components xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff LX3: MC-1 BO, Start Ring Reassembly LX3: Cryo Plant Ready, Cool Ring xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff Cool- Down Field Shimming Install vacuum chambers, equipment in gap, align, establish vacuum Install remaining ring & detector subsystems Controls to MC-1 Accelerator Beamlines, Target, Controls, Safety Systems 11 November 2013 Chris Polly All Experimenters Meeting 10

Schedule presented at DOE CD-1 CD-0 Forecast Objective KPPs Satisfied CD-1 CD-2/3a CD-3 Conceptual Design Prelim Design Prelim Design CD 3a Work Final Design Final Design Ring/Field/Detector Implementation Accelerator Implementation Close- out CD-4 Forecast Includes controls to MC-1 bldg, possible advancement of D30 straight reconfiguration xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff Ring & Det. Ready for Ops Accelerator Complete MC-1 Building Design and Construction Ring Reassembly Construction of NSF/Early Career funded detector components xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff LX3: MC-1 BO, Start Ring Reassembly LX3: Cryo Plant Ready, Cool Ring xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff xNatalie ZaysoffxNatalie Zaysoff Cool- Down Field Shimming Install vacuum chambers, equipment in gap, align, establish vacuum Install remaining ring & detector subsystems 11 November 2013 Chris Polly All Experimenters Meeting 11