1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) www.i-cargo.eu iCargo 1st Review Meeting Brussels 5/12/12 Technical.

Slides:



Advertisements
Similar presentations
Chapter 3 E-Strategy.
Advertisements

Corridors Herald Ruijters, Head of Unit for Trans European Network, DG Mobility and Transport Brussels, 29 November 2012.
THE CORE PROJECT Jose Jimenez (project manager). What is the Core platform?
1 st Review Meeting, Brussels 5/12/12 – WP7 (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 WP7 Business Models, Assessment.
An ecosystem for freight information services: the iCargo project
Business Architecture
Review meeting 05th December
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations.
SmartER Semantic Cloud Sevices Karuna P Joshi University of Maryland, Baltimore County Advisors: Dr. Tim Finin, Dr. Yelena Yesha.
Logistics 10 February 2012, Brussels Transport E-Freight Conference 2012 ICT for transport logistics in a White Paper context: Paperless multimodal freight.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations David Quesada Atos Thessaloniki, 14th October 2011.
Connecting People With Information DoD Net-Centric Services Strategy Frank Petroski October 31, 2006.
Freight Security and the World Economic Forum December 5, 2002.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
iCargo Business and functional introduction.
Getting Smarter with Information An Information Agenda Approach
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations Workpackage 4: iCargo Ecosystem Infrastructure iCargo 1 st Review May /12/2012.
Network of Excellence in Internet Science Network of Excellence in Internet Science (EINS) 2 nd REVIEW Brussels, 4-5 February 2014 FP7-ICT
Mantychore Oct 2010 WP 7 Andrew Mackarel. Agenda 1. Scope of the WP 2. Mm distribution 3. The WP plan 4. Objectives 5. Deliverables 6. Deadlines 7. Partners.
L EAN & G REEN R ATING F RAMEWORK (2 ND S TAR ) M EASURING A BSOLUTE P ERFORMANCE AND F OSTERING C OOPERATION AND I NNOVATION IN THE S UPPLY C HAIN -J.
© 2009 IBM Corporation Let’s Build a Smarter Planet Thongchai Watanasoponwong – Country Manager Power Systems, STG September 15 th, 2009 Green IT เทคโนโลยีสีเขียวเพื่อสิ่งแวดล้อม.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations WP5 – Open End-to-End Pilots Implementation Jose Gato Luis –
BSBIMN501A QUEENSLAND INTERNATIONAL BUSINESS ACADEMY.
Gzim Ocakoglu European Commission, DG MOVE World Bank Transport Knowledge and Learning Program on Intelligent Transportation Systems (ITS), 24/06/2010.
NCP Infoday, Brussels, 23 June 2010 NCP Infoday ICT for Mobility Future ICT Work Programmes Helen Köpman ICT for Transport European Commission Directorate-General.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations
Regional Integration Cluster Olivier Hartmann - SSATP.
Smart cities Rasmus Lindholm, Director, ERTICO – ITS
Transport Henrik Drake "Ports and Inland Navigation" European Commission, DG Mobility and Transport (DG MOVE ) Common Issues Meeting on RIS Zagreb, 13.
COFRET is co-financed by the European Commission Directorate General for Research & Innovation within the 7th Framework Programme.
Innovative ITS services thanks to Future Internet technologies ITS World Congress Orlando, SS42, 18 October 2011.
EMI INFSO-RI SA2 - Quality Assurance Alberto Aimar (CERN) SA2 Leader EMI First EC Review 22 June 2011, Brussels.
EMTA European issues: PSO and Green Paper Progress report – April 2007 EMTA General meeting.
COFRET Delft Meeting 6./ WP 2.4: Future technologies and innovations relating to freight transport which are relevant for carbon footprint calculation.
Geneva, Switzerland, April 2012 Introduction to session 7 - “Advancing e-health standards: Roles and responsibilities of stakeholders” ​ Marco Carugi.
Enterprise Systems Architectures EGN 5621 Enterprise Systems Collaboration (Professional MSEM) Fall, 2012.
JEMMA: an open platform for a connected Smart Grid Gateway GRUPPO TELECOM ITALIA MAS2TERING Smart Grid Workshop Brussels, September Strategy &
FP7 Concertation Meeting ICT for Transport Brussels 4 – 5 April 2011 Paolo Paganelli Insiel FP7 Call 4, CSA Logistics for LIFE.
Melbourne Sydney Brisbane Wellington Johannesburg Cape Town Windhoek Australia’s Supply Chains – Innovate or Fail! 18 June 2008 Liesbet Spanjaard Director,
Jose Jimenez Telefónica I+D Future Network & Mobile Summit 2011 The vision of Future Internet in the FI PPP Core Platform project.
Task NumberHarmonise, develop & implement capacity building Performance Indicators CB-07-01c Harmonise efforts by Tasks, in particular those related with.
ECOGEM Cooperative Advanced Driver Assistance System for Green Cars Burak ONUR Project Coordinator R&D Support Executive
The FI-WARE Project – Base Platform for Future Service Infrastructures FI-WARE Stefano De Panfilis (Fi-WARE PCC Member) 4 th July 2011 FInES - Samos Summit.
Independent Insight for Service Oriented Practice Summary: Service Reference Architecture and Planning David Sprott.
SocialCar a Horizon 2020 project
The Role of TAG (Transport Advisory Group) and Engagement in Future Transport Policy Dr Delia DIMITRIU TAG member.
Intelligent Cargo in Efficient and Sustainable Global Logistics Operations Workpackage 6:Pilot demonstrators iCargo 1 st Review December /12/2012.
ReFINE Research for Future Infrastructure Networks of Europe ECTP OG 10 -April 28, 2010 Brussels.
NCP Info DAY, Brussels, 23 June 2010 NCP Information Day: ICT WP Call 7 - Objective 1.3 Internet-connected Objects Alain Jaume, Deputy Head of Unit.
FHWA Update SHRP2 Implementation and Other Agency TSMO R&D Efforts Tracy Scriba, FHWA 12/8/15 1.
C4Freight. Freight Transport Corridors  Objective Demonstrate on key pan-European corridors innovative transport technologies, systems and strategies.
BALTICOM- BALTIC Transport Communication and Regional Development WP12 Spatial Evaluation of Transport Chains and General Recommendations for Baltic Sea.
TD MANAGEMENT PG PLANNING THE NETWORK Future Needs for Performance Indicators & Road Data.
SAP SUPPLY CHAIN MANAGEMENT(SCM) ONLINE TRAINING.
Page 1 The Role of Innovation for Efficient and SustainableTransport Ivan Hodac Secretary General IRU 1 December 2010, Brussels.
Orientations towards the Scoping Paper H2020 Transport Programme Committee Brussels, 22 June 2016 SMART, GREEN and INTEGRATED TRANSPORT.
ICT22 – 2016: Technologies for Learning and Skills ICT24 – 2016: Gaming and gamification Francesca Borrelli DG CONNECT, European Commission BRUXELLES.
CIM Modeling for E&U - (Short Version)
ICT PSP 2011, 5th call, Pilot Type B, Objective: 2.4 eLearning
WG1: RELIABLE, ECONOMIC AND EFFICIENT SMART GRID SYSTEM
Standards for success in city IT and construction projects
Assessing Passenger Requirements along the D2D Air Travel Chain
A Blueprint to safeguard Europe’s waters
Deployment of Intelligent Transport Systems Directive 2010/40/EU
ENabling SafE Multi-Brand Platooning for Europe
System architecture, Def.
ENabling SafE Multi-Brand Platooning for Europe
Bridging the ITSM Information Gap
Presentation transcript:

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo 1st Review Meeting Brussels 5/12/12 Technical Progress and discussion P. Paganelli (Bluegreen) 1

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) 1st Year results Key common results 2nd Year planned results Approach to cooperation Contents 2

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) First year results 3 Policy, Market and Technology survey D1.1 Consolidated high- level requirements D1.2 iCargo Vision D1.3 Common Framework Specific. D1.4 iCargo components design (version 1) D1.2 D2.1a iCargo components design (version 2) D1.2 D2.1b Orchestrated iCargo application objects D1.2 D3.1 Infrastructure archit. and design D1.2 D4.1a Business cases specification D1.2 D5.1 Pilot user requirements D1.2 D5.2 Market analysis D1.2 D7.1 Reference Business Models D1.2 D7.2 M3 M6 M12 ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔ ✔

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) WP1 – Deliverable D1.1 – Policy, Market and Technology Baseline Policies, practices and standards we will refer to – Deliverable D1.2 – Consolidated high-level requirements The overall business and functional requirements for iCargo – Deliverable D1.3 – iCargo Vision (White Paper) The Why, What and How of iCargo – Deliverable D1.4 – iCargo Common Framework Standardized processes and messages WP2 – Deliverable D2.1 – iCargo components design Overall technical architecture and components Available results (1/3) 4

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) WP3 – Deliverable D3.1 – Orchestrated iCargo application objects iCargo functions and how they are used WP4 – Deliverable D4.1 – Infrastructure architecture and design Putting together iCargo IT infrastructure (first version) WP5 – Deliverable D5.1 – Business Cases Specifications Business objectives of the Pilots – Deliverable D5.2 – Pilot user requirements What is requested to be implemented in the Pilots Available results (2/3) 5

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) WP7 – Deliverable D7.1 – Market Analysis Description of the available market (qualitative and quantitative) – Deliverable D7.2 – Reference Business Models What kind of companies will do business in the iCargo ecosystem Available results (3/3) 6

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) By 2020, efficient, low-carbon end-to-end transport and logistics services will be planned, executed and completed cooperatively in a global freight business ecosystem, based on fully interoperable cargo, vehicle, infrastructure and freight management systems, supporting optimal resources usage and real-time alignment of intermodal plans with on- going operations. The iCargo Vision 7

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) The iCargo approach Achieve the iCargo vision through an open freight management ecosystem. A business ecosystem is an “intentional community of economic actors” having in common protocols, interfaces and an overall business goal. In the case of iCargo this is the provision of door-to-door low-carbon logistic services, i.e., services that: – cover an entire supply chain or a significant portion of it, – produce less CO 2 than alternatives, – make use of the iCargo ecosystem to combine services through different transport modes and providers. 8

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) 9 Ecosystem -Inclusive -Decentralized -Based on shared rules Connected resources -Selected on the basis of the Virtual Resources Network Options -Integrated view based on common semantics -Support distributed monitoring and planning Door-to-door service Roles and resources assigned on demand Virtual Resources Network -Automated resource discovery The iCargo ecosystem 9

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) Collaborative planning, for pooling and sharing resources across the logistic chain. Logistic chain composition based on services, for integrating the different available transport and logistic services. Re-planning of logistic chains by (or on behalf of) the client, in case of goals changes or events happen during the execution time. Optimization of the use of resources of the logistic chain, allowing the Logistic Service Providers to be more situational aware and so to optimize the use of transport resources. Monitoring the environmental footprint, providing smart tools and shared methodologies for environmental data gathering and reporting. iCargo innovations 10

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) The iCargo ecosystem at work Execution Logistic Demand Logistic Service LSPLSC Cooperation X+Y Cargo Box-1234 C B Logistic network awareness Place B Trip C->A A Services BSD S x BSD D Y Transaction Order X-YYY Logistic chain composition Emission monitoring Organisation Truck 25-KGJ-8 Trip B->C 11

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo functions Logistic chain composition – Collaborative planning support (information services support to the “physical internet”, cooperation with the MODULUSHKA project). – Open logistic network based on common definition of transport and logistic services. – Taking into account 3 dimensions: cost, effectiveness, emissions. Logistic network awareness – Monitoring infrastructure based on Intelligent Cargo, vehicle and infrastructure connectivity. – Re-planning triggered by automated monitoring and deviations. – Dynamic alignment of individual service providers plans. Emissions monitoring – Monitoring infrastructure includes collection of energy consumption data. – Real-time calculation of emissions at shipment level. 12

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) iCargo reference value chain 13 Logistic Services Client (LSC) Low-carbon door-to door service Logistic resources and capabilities Freight Services Integrator (FSI) Logistic Services Provider (LSP) Needs goods delivered with lower emissions, good performance and no extra cost Needs to deliver door-to-door service by organizing logistic resources and capabilities Needs to make own resources and capabilities accessible and well utilised Needs to make own resources and capabilities accessible and well utilised Information Services Integrator (ISI) Information services infrastructure Transportation Network Manager(TNM) Transport infrastructure Regulatory Compliance Transport Regulator (TR) iCargo service providers/users iCargo jobs-to-be-done (12), with features/barriers Common high-level view for business-facing WPs (requirements, business models, assessment)

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) 2nd Year planned results 14 iCargo detailed requirements D1.5 Policy, Market and Tech. baseline upd. D1.6 Cloud resources, sematic … D1.2 D2.2 Infrastr. archit. and design (Final) D1.2 D4.1b M14M18M24 Exploitation Handbook D1.2 D7.5 Knowledge base infrastr. and tools D1.2 D2.3 Mobile infrastr., agents… D1.2 D2.4 Specification iCargo freight objects D1.2 D3.2 Specification iCargo traffic objects D1.2 D3.3 Specification iCargo plann. and CO2 obj. D1.2 D3.4 iCargo freight objects 1.0 D1.2 D3.5 iCargo traffic objects 1.0 D1.2 D3.6 iCargo plann. and CO2 obj. 1.0 D1.2 D3.7 Base IT Infrastructure D1.2 D4.2 SCAR Pilot design D1.2 D5.3 Green Corridor Pilot design D1.2 D5.4 LSP- LSC Cooper. Pilot design D1.2 D5.5 Initial Exploitation Plans D1.2 D7.6 Validation Approach & Metrics D1.2 D7.3 Initial status assessment D1.2 D7.4

1 st Review Meeting, Brussels 5/12/12 – Technical progress (P. Paganelli, Bluegreen) Technical coordination approach 15 Shared high-level results (vision, requirements, value chain, functions, architecture) Involvement of technical coordinator for strategic planning of each new task/deliverable Consensus building on main decisions – WP leaders’ meeting every 3-4 months – Discussion of high-level results. Coordination actions planned for the 2 nd year: – Continue WP leaders’ meetings to refine interfaces and provide reciprocal input for next results – Align all partners through training on released results.