PURBECK RAILWAY CIRCLE

Slides:



Advertisements
Similar presentations
Cofferdam.
Advertisements

Visit to Site. The standard of the scaffolds in this area are of varying stages of completion with unusual non-compliant openings although this scaffold.
Platform Screen Door SAI SYNERGY (India)
LAS SALINAS CONDOMINIUMS Key West Florida. Featuring A Sprayed Polyurethane Roof System Applied To Concrete.
My Life Monday What do you know about overhead crane safety? Overhead crane safety may not be relevant to all staff but dont you think it would be interesting.
Infrastructure Projects 1 FHR6 Blockade Works 12th August 2013 Network Rail & Northern Rail Co-ordination Meeting.
Laying a new pipeline A pictorial story. Where it begins: a proving slot The proving slots are small trenches dug at regular intervals so that it can.
PURBECK RAILWAY CIRCLE
PURBECK RAILWAY CIRCLE
PURBECK RAILWAY CIRCLE. Show No.6: “The Birth, Life and Death of “MOTALA” by Mike Walshaw Swanage Railway Signal & Telegraph Dept.
PURBECK RAILWAY CIRCLE. “Signalling the Link” A presentation by Mike Walshaw, Swanage Railway Signal & Telegraph Dept.
Construction Laborer Carpenters Helper Rough Carpenter Construction Carpenter Cabinetmaker/Bench Carpenter.
Robot Quick Build Session Frame Assembly Instructions Produced by Ed Latimer, Team 476 Ken York, Team 476 Ron Markum, Team 1750 Special Thanks to Oklahoma.
Also known as manufacturing industries
5.8 Project Management Chapter 37 HL - Only.
The Whitehorse Dam, 1958 By Al Lister I was employed by General Enterprises Ltd. in Whitehorse Yukon, working in a gravel pit where I learned to operate.
Andy Rowland Head of Propositions BT Global Services January 2010 IRSE Seminar - Fibre Acoustic Monitoring.
William Bell Scott, Iron and Coal 1861, Wallington National Trust.
State of Wyoming Capitol Upgrades and Renovation projects Photos of the skylight and lighting project will be shown in chronological order, followed by.
Signalling the Swanage Branch THE EVENTS OF THURSDAY 5 FEBRUARY 2015 COMMISSIONING THE NEW TOKEN SYSTEM BETWEEN NORDEN AND WORGRET JCT INTO SERVICE 1.
Shelter Operations ARC Loudoun County Chapter American Red Cross.
Yeovil Junction Yeovil Town Yeovil Pen Mill To Frome To Taunton To Exeter To Weymouth To London Waterloo Key: B&E/GWR L&SWR/SR Proposed route Trackbed.
Working Safely This presentation is designed to assist team leaders, supervisors and trainers explain and reinforce to supported employees within the.
RAILROAD OPERATIONS UPDATE ‘The Monster Arrives” 15 AUG 1969.
ATA - 42 Antenna & Zone Cost Summary Matt Fleming Part B of a two part presentation Part A Antenna & Zone Design Summary Part B Antenna & Zone.
Mike Brown – Managing Director London Underground & London Rail Maximizing rail capacity in London.
08/24/07Shutdown’07 Week 3 F.G. Garcia1 MTA beam line installation Weekly Report August 24, 2007 Period covered: August 17 th to August 24 th (Week 3)
Isisdatasolutions ltd Welcome to the UCAS Reference Tracker This brief presentation will show you how reference requests are submitted and tracked.
Division of Operation and Maintenance Engineering Division of Operation and Maintenance Engineering 1 Reliability Analysis of Switches and Crossings –
1 Satisfiability Testing in the Railway Industry Simon Chadwick Head of Research Westinghouse Rail Systems Limited, Chippenham, UK SAT2009 Twelfth International.
Talking Philosophy A lesson by Seth Dickens.
Carstairs S&C Sustainability Renewals & Enhancement Sean Malone Network Rail.
Better Health. No Hassles. Working Safety. Better Health. No Hassles. Why is working safely important?
System Analysis (Part 2) The System Development Life Cycle Problem Selection and Feasibility Study.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
Managing the Organizational Interface Three case studies. IRSC 9-13 October 2005 Managing the Organizational Interface Three case studies. IRSC 9-13 October.
Industrialization Urbanization & Immigration. Industrial Revolution Industrial Revolution: During the 1800’s farmers and city workers stopped working.
Truck Driver. How to become a truck driver First off you need to graduate from high school and have your diploma. Most of the time you will need but there.
A council’s perspective on inquiries Jennifer Wallis.
Lift Station No. 1 and 2 Force Main Replacement Ronald Wastewater District Summer 2015.
CHANNEL TUNNEL!!!!!! BY JAKE. FAB FACTS!!! 1.The channel tunnel is 31.4 miles long and it’s the 11 th longest tunnel in the world 2.The project costs.
LAS SALINAS CONDOMINIUMS Key West, Florida. Featuring: A Sprayed Polyurethane Roof System Applied To Concrete.
UNIT IV TRACK CONSTRUCTION. POINTS AND CROSSINGS Point and Crossings are peculiar arrangement used in permanent way to guide the vehicle for directional.
First name ??? ist auf Englisch. Critical Path Analysis.
Best 20 jobs jobs sites.
 According to the dynamics of traffic growth on the Kiev railway junction the existing transport capacity will be exhausted between the years
Module Three Lifting with 60 inch Pry Bars and Cribbing.
Managing the Organizational Interface
Industrial Revolution in Britain
Critical Path Analysis
Critical Path Analysis
Civil Engineering Task – Explain that civil engineering projects are:
Railway Pro Investment Summit European Railway Business in a Global Environment Bucharest 11 October 2016.
Eagle P3 Project Update RTD Board of Directors Sept. 2, 2014.
Coal Line Longitudinal
Fred Carlton Field Turf Renovation
March 2017 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: OWC Link Using Transparent Display for Automatic.
Rail Safety Summit Work Staging and Planning
INFRASTRUCTURE RENEWAL AT NEW YORK PENN STATION
Hornaday Weekend Conservation Project
NEAR TICKET.
Before Pictured is a natural log jam, at the start of the project. Depth of water is about one foot. Boulders to the left will be placed in the created.
Working Safely. Why is working safely important?
Construction Spring Training 2004 Surveying and Monuments
Steps To Prepare Site For Site Work Construction Calhoun GA.
Possessions Update Great Western Railway Andy McRae
Topic 4: Connecting and Starting Single Phase Motors
How Excavation Companies Help You In Construction Projects In Ooltewah, TN.
Life Cycle Costing.
Presentation transcript:

PURBECK RAILWAY CIRCLE

Signal & Telegraph Dept. “Signalling the Link” A presentation by Mike Walshaw, Swanage Railway Signal & Telegraph Dept.

Network Rail Partnership. “Project Wareham” will see the Swanage Railway linked with the Main Line at Worgret Junction under a Swanage Railway – Network Rail Partnership.

Signalling Solutions Ltd Show No.2 We look at the work being done by Network Rail and its contractor Signalling Solutions Ltd at Wareham and on the Swanage Branch Line.

Re-Signalling Project, As part of the Poole to Wool Re-Signalling Project, Network Rail installed new crossover points at Wareham.

These dramatic pictures show the work done on the night of 24/25 October 2012

The track train waits on the Swanage Branch

The new crossover points, pre-assembled off-site

Wareham Signal Box is to the left Old track is lifted out. Wareham Signal Box is to the left

More track is lifted

Spent ballast is dug out

The new points are lifted into position

Hordes of workers get busy

More track is lifted

More spent ballast is lifted out

New ballast is shovelled into place

The track lining and tamping machine gets to work

The finished job ready for the next day’s trains The finished job ready for the next day’s trains. But trains cannot yet cross over!

In December 2012, Network Rail renewed the points at Worgret Junction, where the Swanage Branch leaves the Main Line

Here are the points at Worgret Junction before renewal Here are the points at Worgret Junction before renewal. The Ground Lever Frame is in the tin shelter!

Engineers’ trains wait on the Main Line

Men at work at the Ground Frame

Heavy machinery at work digging out ballast

Rails are cut and lifted

Confusion reigns!

Spent ballast is dug out

Ballast is spread

Ballast is levelled.

The tamping machine at work

Just testing with a Class 66 loco!

Equipment Cabinets Swanage Railway Network Rail have also installed Signals and Equipment Cabinets on the Branch Line for the link with the Swanage Railway

This will be the new Up Distant Signal near the Bridge over the River Frome.

This is where the signal is located This is where the signal is located. The Bridge over the River Frome is in the background

At Wareham there is a Token Instrument Cabinet on each platform

On the Down Platform

And on the Up Platform

The Token Instrument Cabinet is the larger one

Photo credits: Andrew P.M. Wright, and Mike Walshaw

Token Block Signalling System between Norden and Wareham Show No.3 will highlight the work done by the Staff of the Swanage Railway to introduce the new Token Block Signalling System between Norden and Wareham