1/11 FP7 Proposal Student: Marković Marko Broj indexa: 1062/2009 Kontakt:

Slides:



Advertisements
Similar presentations
ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Advertisements

Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Plan 1 st Period Instituto Pedro Nunes Co-Living.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
C2-SENSE WP2 Bojan Božić, Gerald Schimak, Refiz Duro C2-SENSE WP2 Meeting Paris
LONG: Laboratories Over Next Generation Networks. Project Description & WP1: Management.
BVSc Honours Program Agenda Why choose honours? Why choose honours? What is required? What is required? Who will be my supervisor? Who will be my.
Camellia IST Key Action IV.1.1 W. M. Kruijtzer / Philips 21 Febr 2003 Project introduction 1 st EC Review Meeting, Brussels Febr 21 st, 2003.
Chapter 11 - Project Management ME101 Dr. Nhut Tan Ho 1.
Project planning. Software project management Informal definition of management – The art of getting work done through other people Software project management.
Project Management An Overview John Mulhall MIICM; LIB International Credit & Process Management Professional.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
FP OntoGrid: Paving the way for Knowledgeable Grid Services and Systems WP8: Use case 1: Quality Analysis for Satellite Missions.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
1 Framework Programme 7 Guide for Applicants
Project Management Professor: Dr. Miguel Alonso Jr.
Jana Gudurić, 1014/2009 Slobodan Marković, 1039/2009 University of Belgrade, Faculty of Mathematics, Belgrade.
The Preparatory Phase Proposal a first draft to be discussed.
Project Sponsor Project Manager 04/24/ Major Projects Quarterly Review.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP8. Dissemination & Exploitation.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Development of a Digital Library Technology Based on Redundancy Elimination and Semantic Elevation, With Special Emphasis on Trust Management and Security.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Chapter 7 IS630. Project Design  Technical Design & Specification Network and System Architecture & Design Software System Architecture & Design  Database.
The research leading to these results has received funding from the European Community's Seventh Framework Programme (FP7/ ) under grant agreement.
Dunstaffnage Marine Laboratory Oban, Argyll, Scotland PA37 1QA ECASA Kick-off Oban 8-9, December 2004.
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
CLARIN work packages. Conference Place yyyy-mm-dd
Case study of a successful proposal Rob Davies. Parts of a proposal Part A - Proposal Administrative Overview - forms Part B- Description of objectives.
Stepping up Economic and Technological Intelligence Brussels, 18 December 2002 Germán Valcárcel European Commission DG Research - Research and SMEs.
Free Powerpoint Templates Page 1 Free Powerpoint Templates FP7 – Secure Enterprise Remote Banking System (SERBS) Small or medium scale focused research.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval Annual Review Meeting - Introduction.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP 7 – Dissemination, Exploitation Strategy and Standardization Inova+ Co-Living.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
1 reTHINK Deliverables, How To Read reThink deliverables quick starter.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
SYSTEM FOR COLLECTING AND ANALYSING SPORT STATISTICS Small or medium scale focused research project (STREP) Date of preparation : Work programme.
System for Collecting and Analysing Sport Player Physical Data Small or medium scale focused research project (STREP) Date of preparation :
Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital representation of health data to improve disease diagnosis and treatment.
1 WP7 Presentation WP7 -- Project Evaluation Computer Engineering and Networks Laboratory, ETH Zurich Prof. Dr. Bernhard Plattner.
© Services GmbH Project work plan 2/20/ St. Petersburg, May 18, 2011 Dr. Andrey Girenko
WP3 – Representation of requirements Robert Jenkins CEO CloudSigma 1 This document produced by Members of the Helix Nebula consortium is licensed under.
1 Project Management Software management is distinct and often more difficult from other engineering managements mainly because: – Software product is.
Virtual Collaborative Social Living Community for Elderly Kick Off Event WP2 Overview Instituto Pedro Nunes Co-Living 12/3/ Paulo Freitas - Instituto.
C HU H AI C OLLEGE O F H IGHER E DUCATION D EPARTMENT O F C OMPUTER S CIENCE Preparation of Final Year Project Proposal Bachelor of Science in Computer.
Marco Vieira University of Coimbra Naples, 20th December 2011.
Coordinators' day on FP7 Project Negotiation Description Of Work Annex I Griet Van Caenegem DG CNECT R5 Programme Operations May 28, 2013.
Overview of Software Project Management cont Review – Class 6 Scheduling Tasks Project Management Activities CEN 4010 Class 8 – 09/22.
HNDIT23082 Lecture 10:Software Project Management
Specialties Description
Undergrad (UG)s committee
Introduction to Project Management
UNISEC Universal Influenza Vaccines Secured
Work programme topics addressed:
Presenter name affiliation
University of Sheffield, UK
The ACM SAC, Coimbra, Portugal, March 18-22, 2013 TUTORIAL on DATA MINING from SOCIAL, KNOWLEDGE, and SENSOR NETWORKS Babovic, Zoran 1 Bajec, Marko.
Project Management.
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
Yahoo Technical Support Number
12/8/2018 Title Page.
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Proof-of-concept Project kick-off meeting
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Project Title: Host Institution: <Name of Host Institution> PI:
I Datagrid Workshop- Marseille C.Vistoli
AME Programmatic Letter-of-Intent
Presentation transcript:

1/11 FP7 Proposal Student: Marković Marko Broj indexa: 1062/2009 Kontakt:

2/11 Introduction Social educational network technology for science, technology and math (SentSTM) Problem današnjih rešenja (wikipedia) Preporuka novog modela

3/11 Partners University of Belgrade, Mathematical Faculty RR & CO. GoalEurope Szeged University University of Salerno Technische Universiteit Eindhoven Donau-Universität Krems Maximal Acceleration Company MediaPrimer, Coimbra Karlstad University

4/11 Work Description WP0: Project management, RR WP1: Development of SentSTM database, KAU WP2: Definition of SentSTM database algorithms, SALERNO WP3: Development of SentSTM GUI, UBMAT WP4: Development of SentSTM security, DUK WP5: SentSTM secured hosting, TUE WP6: Testing of the SentSTM system, SZEGED WP7: Estimating and enhancing the performance, MAXELER WP8: Application deployment, GE WP9: Informing the scientific and technical environment, investors, and market, MP

5/11 Gantt chart

6/11 Workpackage details

7/11 Milestones M0.1 Kick off meeting M0.2 Consortium agreement signed M0.3 Project shut-down – all deliverables achieved M1 Finished analysis and design specification M2 Developed prototype database architecture M3 Developed intelligent algorithms and agents M4 Developed trust management and security mechanisms M5 System tested on real life scenario M6System performance test M7 SentSTM system improved

8/11 Summary effort table

9/11 Graphical presentation of the components

10/11 Risks Delay in development

11/11 Ethical issues