Presentation is loading. Please wait.

Presentation is loading. Please wait.

I Datagrid Workshop- Marseille C.Vistoli

Similar presentations


Presentation on theme: "I Datagrid Workshop- Marseille C.Vistoli"— Presentation transcript:

1 I Datagrid Workshop- Marseille C.Vistoli
 Wide Area Workload Management Work Package DATAGRID project Cristina Vistoli - INFN - CNAF 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

2 I Datagrid Workshop- Marseille C.Vistoli
Tasks list: Job description and resource spec Job decomposition partitioning Scheduling Co-allocator+adv reservation Resource management Services and access control 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

3 I Datagrid Workshop- Marseille C.Vistoli
Scheduling Definition of scheduling policies in order to find the best match between job requirements and available resources Network Storage Cpu 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

4 Scheduling: architecture schema
JOB queue Grid Policy and admission control JOB Information Service Co - allocator+Advance Scheduler reservation Resource management GRID Resources 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

5 Co-Allocation & Advance Reservation
Co-allocation is necessary because applications need simultaneously resources of different types: CPU and DATA and NETWORK Advance Reservation of heterogeneous resources is necessary to guarantee end-to-end performance Analysis of possible strategies and paradigms for rescheduling in case of resource fault or change in allocation The different architectural approaches have to be investigated: Reserv/co-alloc done by application Reserv/co-alloc agents between appl and res. Reserv/co-alloc global broker GARA and IBP 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

6 I Datagrid Workshop- Marseille C.Vistoli
Resource Management Resource manager implements the defined scheduling policies Multiple (local) resource managers Interfaces, protocols to different Resource Managers Reources type: PC cluster GRAM evaluation 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

7 I Datagrid Workshop- Marseille C.Vistoli
Services Access Control Bookkeeping Accounting Logging 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

8 I Datagrid Workshop- Marseille C.Vistoli
Datagrid WP1 Estimated Resources: 670 mm in 3 years Funded/Unfunder resources INFN Datamat Czech Rep. 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

9 I Datagrid Workshop- Marseille C.Vistoli
Datagrid WP1- Effort/Task Breakdown Task INFN 9 PPARC 9 DATAMAT CESnet 3 Task DATAMAT 80 INFN 10 Task INFN CESnet 24 Task INFN Datamat 13 CESnet 18 Task CESnet 75 INFN 57 Task INFN 40 Task INFN 24 PPARC 9 CESnet DATAMAT 12 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

10 I Datagrid Workshop- Marseille C.Vistoli
Deliverables D1.1 (Report) month 12 Definition of architecture and technical plan for scheduling and resource management. D1.2 (Report) month 16 Definition of the resource co-allocation framework based on the evaluation of the existing research prototypes D1.3 (Report) month 24 Description of the workload management system implementing code migration D1.4 (Report) month 30: Mechanism and Methods to specify jobs flows and job parallel partitioning in the GRID 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

11 I Datagrid Workshop- Marseille C.Vistoli
Deliverables-cont D1.5 (Prototype) month 30: Job description and resource specification language, and user interface for task management D1.6 (Prototype) month 36: Services for bookkeeping, accounting, logging and security integrated in the workload management framework D1.7 (Report) month 36: Description of the workload management system implementing data migration and remote access 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

12 I Datagrid Workshop- Marseille C.Vistoli
Datagrid WP1- Effort/Deliverable Breakdown D1.1 effort 44: task 1.1 (24) + task 1.4 (20) D1.2 effort 15: task 1.4 (15) D1.3 effort 85: task 1.4 (85) D1.4 effort 141: task 1.3 +task 1,7 (9) D1.5 effort 100 : task1.2 +task 1.7 (10) DATAMat D1.6 effort 144: task task 1.7 (12)CESnet D1.7 effort 101 : task 1.4 (63) + task 1.7 (38) 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli

13 Milestones and expected result
. Milestones and expected result M1.1 Month 8: Choice of a job description language architecture based on the evaluation of existing job description languages and methods M1.2 Month 10: Choice of a security architecture based on the evaluation of existing security models M1.3 Month24: Workload management scheduling implementing code migration M1.4 Month 36: Workload management scheduling implementing data migration and remote access 4/9/ 2000 I Datagrid Workshop- Marseille C.Vistoli


Download ppt "I Datagrid Workshop- Marseille C.Vistoli"

Similar presentations


Ads by Google