ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

© The McGraw-Hill Companies, Software Project Management 4th Edition Activity planning Chapter 6.
2/21 Project Management Roll call/ collect homework Go over homework(?) Project management: Critical Path Method Small groups Assign homework Discuss midterm.
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
PRJ566 Project Planning and Management Lecture: Dependencies and Network Diagrams.
Calculate the critical path Arrow diagram Critical Path Method Edina Nagy Lajos Kiss Szabolcs Hornyák.
Prosjektstyring A 5 WEEKS B 10 WEEKS C 12 WEEKS D 8 WEEKS E 6 WEEKS ACTIVITY (t) ESEF FL LS LF We have a network with.
Calculating Float ActivityPrecedenceDuration Start0 D 4 A 6 FD, A7 ED8 GF, E5 BF5 HG7 CH8 EndC, B0 1. What is the duration of the critical.
Manajemen Proyek Perangkat Lunak 2 sks Elisati Hulu Department of Informatics
Network Diagramming Network Analysis  The common term for network analysis is PERT  PERT stands for Program Evaluation and Review Technique  The word.
Project Management Project  A series of related jobs usually directed toward some major output and requiring a significant time to perform Project management.
CSSE Sep.2008 Constructing and Analyzing the Project Network Diagram Chapter 6.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
CEN th Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Software Project Planning.
Gantt Chart Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project schedule Slack amount.
CSSE 372 Week 6 Day 2 Constructing and Analyzing the Project Network Diagram  PERT Chart PERT was invented for the Nautilus submarine project. Ok, maybe.
Critical Path Method (CPM)
1 1 Slide © 2000 South-Western College Publishing/ITP Slides Prepared by JOHN LOUCKS.
PREPARED BY : NOR AZAH BINTI AZIZ KOLEJ MATRIKULASI TEKNIKAL KEDAH PROJECT NETWORK DIAGRAM.
MGMT 483 Week 8 Scheduling.
Project Scheduling Critical Path Method
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Project Networks. A,4 B,3 C,4 D,6 E,3 H,6 F,5 G,4 I,2 St,0 Fin,0 Example Network - terminology C,t Activity Duration of Activity (ES, LS) Early Start.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Project Management (2) Chapter 16, Part 2. EJR 2006 Review of Project Management, Part 1 What is a project? Examples of projects Project performance expectations.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Projects: Critical Paths Dr. Ron Lembke Operations Management.
Project Management. Introduction What – Project Management Where – Where the success or failure of a project will have major consequences for the company.
Projmgmt-1/14 DePaul University Project Management I - Realistic Scheduling Instructor: David A. Lash.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Project Management Chapter 3 BUSI 2106 – Operations Management.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
PROJECT BUDGETING The overall goal in the budgeting process of a project is to determine how much money is to be spent each week or each month. PERT /
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
Irwin/McGraw-Hill © The McGraw-Hill Companies, Inc., 1999 PROJECT MANAGEMENT 18-1 Project Management.
2/28: More CPM: Crashing Roll call / return exams / return homework Review: Critical Path Management –Creating the CPM diagram –Calculating the critical.
PROJECT MANAGEMENT Definitions WBS = Work Breakdown Structure
6/10/01Network Problems: DJK1 Network Problems Chapters 9 and 10.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Operations Management Project Management
5 th LectureCEN 4021: Software Engineering II Task Sequence and Effort representation  All tasks share at least two basic characteristics –Require effort.
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
Prof.Dr. Ahmet R. Özdural – Class Notes_06 - KMU417 Project Planning and Organization – Fall Semester.
Project Management – Part 1. Overview What is a project? Project management techniques Activity lists Network diagrams Critical path analysis Gant charts.
Project Management Fundamentals - Planning Tools 1.
The Network Diagram. When to Do What?  Carrying out one activity after the other may result in project completion, but it will take the longest possible.
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
Most commonly used methods for project management.
Project Management Critical Path Method Demonstration
RESOURCE SCHEDULING references:
Project Time Management.
PERT-CRITICAL PATH-DECISION MAKING PROCESS/TOOLS
Projects: Critical Paths
Project Management CPM Method Tutorial-p2
Project Management McGraw Hill “Service Management” by Fitzsimmons.
Project Management Planning Models
Probabilistic Time Estimates
Project Management CPM Method Tutorial-p1
תזמון פרויקטים.
Solution to Problem 2 Developed by: Alex J. Ruiz-Torres, Ph.D.
Solution to Problem 1 Developed by: Alex J. Ruiz-Torres, Ph.D.
BEST VIEWED IN SLIDE SHOW MODE
General Foundry Example of PERT/CPM
Slides Prepared by JOHN LOUCKS
Exercise – A small building.
Presentation transcript:

ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4 LF=10 ES=16 EF=30 ES=35 EF=39 LS=35 LF=39 ES=39 EF=41 LS=39 LF=41 D(6) E(14) H(2) B(6) Latest EF = Next ES A(4) K(2) G(2) J(4) ES=0 EF=4 LS=0 LF=4 C(3) ES=30 EF=32 LS=30 LF=32 F(5) I(3) Calculate Early Starts & Finishes ES=4 EF=7 LS=22 LF=25 ES=7 EF=12 LS=25 LF=30 ES=32 EF=35 LS=32 LF=35

ES=16 EF=30 LS=16 LF=30 ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 39-4=35 ES=35 EF=39 LS=35 LF=39 ES=39 EF=41 LS=39 LF=41 D(6) E(14) H(2) B(6) A(4) Earliest LS = Next LF K(2) G(2) J(4) ES=0 EF=4 C(3) ES=30 EF=32 LS=30 LF=32 F(5) I(3) Calculate Late Starts & Finishes ES=4 EF=7 LS=22 LF=25 ES=7 EF=12 LS=25 LF=30 ES=32 EF=35 LS=32 LF=35

What is the critical path? B(3) A4 D2 C(5) E(5) F(6) G(4) H(3) What is the critical path? A,B,E,G,H A,C,E,G,H A,C,F,G,H A,D,F,G,H

What is ES, EF for G? 14, 18 15, 19 16, 20 17, 21 E(5) B(3) H(3) G(4) D2 C(5) E(5) F(6) G(4) H(3) What is ES, EF for G? 14, 18 15, 19 16, 20 17, 21

What is LS, LF for C? 4, 9 5, 10 3, 8 6, 11 E(5) B(3) H(3) G(4) C(5) D2 C(5) E(5) F(6) G(4) H(3) What is LS, LF for C? 4, 9 5, 10 3, 8 6, 11

E(5) B(3) H(3) G(4) C(5) A4 F(6) D2 ES 9 LS 10 EF 14 LF 15 ES 4 LS 7