EcoMes PDA based 3D measurement software. Analysis data on site. EcoBlock G1 3D block accuracy control system Compatible with 3D design model Automatic creating check sheet EcoOTS G1 3D erection simulation system. Automatic calculating Gap and Overlap Block Insert erection simulation 2. Products – EcoMarine G1EcoMarine G1
3. Expected effects after the introduction of EcoMarine.
Case Study – Chinese Shipyard 1. The year of introduction EcoMarine to the Shipyard : Condition of the Shipyard - Location : China - Main products : 172K, 176K BC, VLCC, FPSO, Semi Rig.. - Facilities Dock 480*106 Crane 600T*2 Dock 540*76 Crane 600T*1, 800T*1 - CAD system : Tribon M3
3. Detail of Changes after adopting 3D Accuracy Control System Case Study – Chinese Shipyard YEARProduction (DWT) Dock Turnover ratio(BC) Size of Erection block Erection Number of Times , Days300~400 Ton1~2 block/Day , Days300~400 Ton1~3 block/Day ,000090~92 Days300~400 Ton2~4 block/Day ,000080~84 Days300~400 Ton4~6 block/Day YEARCrane Usage Block Margin Precision of Block accuracy Number of staff (Accuracy Control) 20073~4 times/ 1 block 50 mm±50mm ~1.5 times /1 block None Margin ± 5mm89
Year EcoMES (Measurement) EcoBLOCK (Block Analysis) EcoOTS (Erection Simulation) Total4413 Year Bottom Block Engine Block Forward Block Side Shell Block %10%15%45% %30%35%67% %45%48%79% 4. Changes of block acceptance rate (Checking completed block in Erection dept) 5. Changes of purchase EcoMarine Case Study – Chinese Shipyard
Effects -More safety. -Assembly more accurate block. -Shortening of construction time. -Prevent rework. -Achieve One Time Setting for the erection. -1~2 additional ships are able to be built per one dock(or birth) -Produce high skilled technician. - Acquire advanced technology.
Thank you.