Activities in CEPT ECC/WGFM/ Project Team FM54

Slides:



Advertisements
Similar presentations
Jukka Rakkolainen / ECO Nordic-Baltic Electronic Communications Regulators Workshop Network Neutrality and Consumer Protection Vilnius, 29 August 2012.
Advertisements

ECC initiatives on spectrum for Programme Making and Special Events - PMSE Bruno Espinosa Deputy Director, ECO, Copenhagen.
3.7) On-going activities within CEPT/ECC Thomas Weilacher Vice Chairman of CEPT/ECC Working Group FM (Frequency Management)
On-Going Activities in the CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Interactive Workshop.
Geolocation databases for spectrum sharing : ECC findings and studies EC DG CONNECT Workshop, 20 March 2015 Bruno Espinosa, Deputy Director, ECO.
SPECTRUM REGULATION IN EUROPE, ECC ACTIVITIES RELEVANT FOR UTILITIES Bruno ESPINOSA, ECO
SE35presentation.ppt France Telecom R&D CEPT ERC SE35 activities on compatibility between radio services and PLT (Power Line Telecommunications) Dubrovnik,
On-going developments for Wireless Industrial Applications (WIA) in CEPT/ECC Workshop on Wireless Resources for advanced Manufacturing Brussels, 30 October.
Activities in CEPT ECC/WGFM in relation to the Evolution of the Radio Communication System Workshop on Evolution of the Radio Communication System - European.
Development of CEPT and ITU deliverables Ralf Trautmann 6 th International Seminar on Spectrum Monitoring Kyiv, 10 – 12 July 2013.
LSA in the 2.3 – 2.4 GHz band Bruno ESPINOSA, ECO Trial LSA workshop, Helsinki, 3rd September.
Coexistence challenges in the UHF band Bruno ESPINOSA European Communications Office (ECO) Overview of CEPT/ECC actions.
European Regulatory Environment (just a part!) Mark Thomas, ECO Director CEPT Workshop on European Spectrum Management and Numbering 4 th June 2014.
State Services Commission Crown Copyright 2006 RADIO COMMUNICATIONS – APCO P 25 TECHNICAL STANDARD SUITE It is recommended that the e-GIF committee Approve.
Strategy of efficient Frequency Usage in the Republic of Moldova. Digital Dividend and Transition to Digital TV Regional Meeting on Mobile Communications.
INTERIM MEETING/ VIENNA PART 1 THE STATUS of the PROJECT IMPLEMENTATION.
Activities in the WG FM SRD/MG related to Cognitive Radio Techniques Thomas Weber, SRD/MG Chairman ECC Workshop Workshop on Cognitive Radio and Software.
This project is funded by the European Union EU regulatory framework for electronic communications - Spectrum and related aspects Richard Harris Independent.
Risk assessment and interference management ADCO R&TTE Risk Assessment workshop 17th October 2013 Bruno Espinosa, ECO.
#UIC ERTMS World Conference 1. – 3. April 2014, Istanbul UIC Rail System Department UIC ERTMS World Conference Dirk Schattschneider UIC Frequency Manager.
GSM onboard aircraft : SE7 activities Joint meeting, ETSI – 09 September GSM ONBOARD AICRAFT CEPT / SEWG / PT SE7 Jean-Philippe Millet, ANFR
GSC#8 April 2003, DRAFT GSC-8, OTTAWA Slide 1 RAST 10/2-3 Generic Standards
Transition to Digital Broadcasting and Digital Dividend 6-7 October 2011, Belgrade, Serbia 1 Sub-Regional Workshop on Transition to Digital Broadcasting.
ECC: what is the current status of 5G … Stella Lyubchenko, ECO 2 nd JRC Seminar on 5G Communications, Ispra, 19 th May.
©Ofcom IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008 Andrew Gowans, Head of Exempt Technology.
CEPT/ECC-ETSI Co-operation Process
20 th EMC WP / TCAM EG 5 – CENELEC Standardization Report Publication of recast EMCD, LVD and RED CLC/TC 65X (Industrial Wireless Automation) 800 MHz Decision.
EFIS update 20 February 2014 EFISMG(14)17. EFIS s/w versions Software versions uploaded this year: 3.3 Wed Feb New version come up quite frequently.
Guidelines on Transmission Tarification ERGEG Public Hearing 30. June 2005.
Activities in CEPT (European Spectrum Regulation) for Applications in Transport and Traffic Telematics including Sensors Trends in Automotive Radar and.
WGFM PT49 BB PPDR Dublin, 26 – 27 November 2013 Peter Buttenschön Chairman WGFM PT 49
FM 54 GSM-R points ERA ERTMS Unit London, 22 February 2016.
Doc.: IEEE /12??r0 SubmissionSlide 0 IEEE 802 Plenary, Dallas, Tx RRTAG( ) meeting Consultation on Safety Related ITS 12 th November 2008.
AI MHz MHz ECC DEC (15)01 + CEPT report 53 ECC-FCC-IC Liaison Meeting Maisons Alfort, May 2015 Didier Chauveau ECC PT1 Chairman.
EUROPEAN COMMUNICATIONS OFFICE Nansensgade 19 DK-1366 Copenhagen Denmark Telephone: Telefax:
GSM-R = -85dBm I = -94dBm 9dB C/I Note 1: The I should be the sum of Rx thermal noise, co-channel, adjacent channel and Unwanted Emission. Here only UE.
Compatibility measurements UMTS/LTE/GSM -> GSM-R Thomas Hasenpusch Federal Network Agency, Germany CG-GSM-R(13)033.
GSM-R / Mobile coexistence National Cooperation/coordination Process
1210 MHz of harmonised spectrum (ECC framework)
Updates on the digital dividend and UWB in the UK and Europe
Coexistence challenges in the UHF band
EFIS update 20 February 2014 EFISMG(14)17.
Reflection Of The NJFA In The ERC Report 25 (ECA Table) And Relation To EFIS And To The RSPP Inventory CEPT/ECC Civil/Military Meeting, November.
Activities in CEPT-ECC potentially relevant for UIC
CEPT/ECC-ETSI Co-operation Process
Thomas Weilacher WG FM Chairman
Session II: System authority for ERTMS 4RP Trackside approval
Thomas Weilacher WG FM Chairman
Session 2 European Regulatory Environment (just a part!)
Status On Current DFS CEPT/ECC Civil/Military Meeting, November 2016, Prague Thomas Weber, ECO, Spectrum Management
Radio Microphone Task Force Report
CEPT ECC Vice Chairman Jaime Afonso
Wi-Fi Alliance meeting
Broadband PPDR frequency situation in Europe
Radio spectrum for present and future rail transport needs
Radio spectrum for future railway applications
Eric Fournier Chairman, Electronic Communications Committee
European Regulatory Environment (just a part!)
Liaison statement and Request for Specification and Implementation of Harmonised Pan-European Emission Limits relevant for the GSM-R Operating Range.
Updates on the 863MHz SRD band and 872MHz Award
European 5G regulatory developments
700 MHz Repository and the associated ECC Forum Group
Radio Microphone Task Force Report
EU-US-JP ITS Steering Group Annual Meeting 2018
WGSE Organisation ECC ECO External Relations STG – SEAMCAT
Relevant Activities in CEPT-ECC
Relevant Activities in CEPT-ECC
Eric Fournier Chairman, Electronic Communications Committee
ECC actions on interference from 5 GHz RLAN into meteorological radars
ETSI BRAN Update (IEEE Co-Existence Workshop)
Presentation transcript:

Activities in CEPT ECC/WGFM/ Project Team FM54 3rd Interferences Workshop - European Commission (DG Move) and the European Railway Agency (ERA), 25 November 2014 Thomas Weber, ECO, Spectrum Management

Content On-going work in Project Team FM54 Development of draft ECC Report 229 Interference Mechanisms Draft Conclusions in ECC Report 229 Coordination/cooperation process

Where does the action take place?

Interference Mechanisms (1) 925 MHz GSM-R channel Unwanted emissions from UMTS/LTE in the GSM-R channel

Interference Mechanisms (2) Max. mixer power Min. S/N Receiver blocking due to high input powers

Interference Mechanisms (3) GSM-R channel fIM fIM = 2*f1-f2 Receiver intermodulation (2 narrowband signals)

Interference Mechanisms (4) 921.2MHz 924.8MHz UMTS GSM UMTS signal IM products (all) IM frequencies involved when GSM-R frequency is 921.2 MHz IM frequencies involved when GSM-R frequency is 924.8 MHz Receiver intermodulation (1 wideband signal)

Draft ECC Report 229 It is planned to submit the draft ECC Report to the next WGFM meeting in February 2015 for public consultation approval. Draft conclusions recognise: EIRENE specifies requirements for a digital radio standard for the European railways Both GSM-R and MFCN (Mobile Fixed Communications Network) licensees use the radio spectrum in compliance with the relevant European and national regulations Realistic UMTS and LTE signals have lower unwanted emission levels (10 to 20dB) than specified Measurement campaigns performed in 2013-2014 concluded that intermodulation products due to UMTS/LTE intra-signal intermodulation and also inter-signal intermodulation with GSM are generated within the current cab radio receivers and affects their operation Wideband signals impact the whole GSM-R frequency range. UMTS, LTE/5 MHz and LTE/10 MHz have the same interference potential

Draft ECC Report 229 In order to successfully mitigate interferences due to blocking and intermodulation, the standard relevant for GSM-R radios (ETSI TS 102 933) was improved with respect to the receiver characteristics and published in August 2014. Field test clearly showed the improvements achieved by the radio module vendors. Nevertheless, improved receivers will still be impacted by unwanted emissions from nearby mobile/fixed communications networks A coordination/cooperation process should be used before, during and after the transition period towards improved GSM-R receivers The process may also be used to prevent interference from MFCN OOB emissions before, during and after the transition period taking into account the predicted GSM-R signal level then confirmed by measurement. Visibility and exchange of information shall remain to prevent any further issues

Draft ECC Report 229 A formula is included in draft ECC Report 229 to provide the maximum MFCN OOB level that should be fulfilled at 4m above the rail tracks by MFCN operators, which provide a trigger to start the coordination process The proposed generic coordination/cooperation process can be adapted to meet national needs and remain a national decision, noting that existing processes are already in use To support the technical analysis, a single agree electronic tool could be developed, based on SEAMCAT; this is currently under investigation.

Coordination/cooperation process

Roadmap Approval ECC Report 229 9-13 FEB 2015: WGFM#82 approves draft ECC Report 229 for public consultation Beginning of March – mid April 2015: public consultation process 18-22 May 2015: WGFM#83 approves ECC Report 229 for publication 25 May 2015: publication Using Seamcat as  a potential tool for GSM-R-MFCN in support of national coordination/cooperation, please note the workshop on 5-6 March 2015 that is especially covering EPP (Event Processing Plugin) customisation. http://www.cept.org/ecc/tools-and-services/cept-workshops

Thank you for you attention Questions?? Thomas.Weber@eco.cept.org www.cept.org/eco www.cept.org/ecc