1 Estimating Costs At Completion Review this tutorial and the Project Pyramid Exercise until you are fully comfortable with how to calculate an estimate.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Chapter 10 Project Monitoring and Control
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
Project Management 6e..
CPM-400: xxx Lesson B: EV Data Analysis I Instructor Ellen Udell
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Chapter 13: Progress and Performance Measurement and Evaluation
© SYBEX Inc All Rights Reserved. Session 10 Project Control.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
EARNED VALUE MANAGEMENT (EVM)
10/19/ :26 AM 1 Project Cost Control. 10/19/ :26 AM 2  Controlling involves making sure that the results achieved are in line with the planned.
EVM Home Page = = “One Book” DAU POC: (703) (DSN 655) Address: Revised.
Stage III: Project Execution and Control Earned Value Analysis B: Chapter 8: pages B: Chapter 12: the entire chapter.
1 Lecture 4.3b: Earned Value as the Cost and Schedule Metric (SEF Ch 14) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the.
Advanced Project Plan Tracking Lesson 15. Skills Matrix SkillsMatrix Skill Record actual start, finish, and duration values of tasks Enter actual start.
Mohawk Vehicle - MEGA HERZ ELEC & VEN - MOH-2 F C-0050 J:\CS40\Data Analysis\- Standard Analysis Package/Sample Standard Analysis Package.
PowerPoint Presentation by Charlie Cook Copyright © 2006 The McGraw-Hill Companies. All rights reserved. THE MANAGERIAL PROCESS Clifford F. Gray Eric W.
Mohawk Vehicle - MOH-2 - F C EVM Quick-Look Report.
1 Cost Health Checks Aug 2013 NAVY CEVM 2 Outline BCWP with no ACWP ACWP with no BAC Credibility of the Most Likely EAC Timely detail planning MR health.
Earned Value Management (EVM) Reference Card EVM Terminology ACWPActual Cost of Work Performed (Actual cost incurred for work accomplished during a given.
Project Management 6e..
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
EVM Home Page = Address: DAU POC: (703) (DSN 655) Revised December 2006 TERMINOLOGY.
Schedule Control (Earned Value)
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Measuring Progress HNC Project Management. Measuring Schedule Performance Break project tasks up into small work units. Work units that are too large.
Performance Measurement Baseline Contract Price (Project Price)
Project Monitoring
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
Budget Planning.
CHAPTER:7 Project Cost Management
Earned Value Management
IEVMC Lesson 8 FY14 Analysis Case Study Performance Management Analysis Tools Student guide page 8-5.
Performance Measurement Baseline Contract Price (Project Price)
Project Cost Management
EVM 202—Lesson 7 Tools Analysis Case Study
Contract Performance Charts
Earned Value Management & Oracle Primavera P6
Progress and Performance Measurement and Evaluation
EVM 202—Lesson 7 Tools Analysis Case Study
An Introduction to Earned Value Performance Measurement
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
Evaluating the Estimate at Completion (EAC)
Presentation transcript:

N O T E “CLICK” TO CONTINUE… If the slide show is not launched, click on View  Slide Show in the menu bar at the top of the Power Point window. When the View option is not visible, the slide show has been launched and you must click to proceed to the next slide.

E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…

Estimates at Completion (EACs) When discussing the concept of EAC, there are at least three different perspectives that can be taken: Contractor EAC – sometimes referred to as the Latest Revised Estimate (LRE) Government Program Office OSD/Higher HQ They are derived differently based on information available E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…

Estimates at Completion (EACs) Contractor EAC (aka LRE) Based on Detailed information Updated periodically “Bottoms-up” from Control Account Level Government Program Office Review Contractor EAC/LRE Formulas – Sanity Check Identify Risk Develop PMO EAC Range Not “plug and chug” – more than just EV status Add PM Perspective Analysis and incorporation of all program data OSD/Higher HQ Lack of Program Details Usually Formula-Based at top level Sometimes Related to Database (history of past programs) E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…

Formula-based EAC Concept Let’s begin by explaining the EAC Concept. Put in its simple terms, the EAC is the sum of what has already been spent plus what we need to spend to complete the work. E S T I M A T E S A T C O M P L E T I O N ( E A C s ) EAC = Cost to date + Estimate to Complete “CLICK” TO CONTINUE…

Formula-based EAC Concept Now, let’s translate that into EV terms. The “cost to date” is the Cumulative Actual Cost of Work Performed (ACWP). In order to determine the “estimate to complete” we need to determine how much work is left and how efficiently the contractor will perform it. E S T I M A T E S A T C O M P L E T I O N ( E A C s ) EAC = ACWP + Work Remaining Performance Factor ( ) “CLICK” TO CONTINUE…

Formula-based EAC Concept The “work remaining” can be calculated by subtracting the work accomplished to date, which is the Cumulative Budgeted Cost of Work Performed (BCWP), from the total work value planned, which is the Budget at Completion (BAC). E S T I M A T E S A T C O M P L E T I O N ( E A C s ) EAC = ACWP + ( BAC – BCWP) Performance Factor ( ) “CLICK” TO CONTINUE…

Formula-based EAC Concept E S T I M A T E S A T C O M P L E T I O N ( E A C s ) Now, where do we get a performance factor? EAC = Cost to date + Estimate to Complete EAC = ACWP + Work Remaining Performance Factor ( ) EAC = ACWP + ( BAC – BCWP) Performance Factor ( ) “CLICK” TO CONTINUE…

Now, where do we get a performance factor? If you review the metrics on the gold card, a couple of sources for performance factors should stand out Cost Performance Efficiency (CPI) Schedule Performance Efficiency (SPI) The basic EAC formulas shown on the GOLD CARD use Cum CPI and a composite performance factor calculated by multiplying the CPI and the SPI The chart on the following page displays these methods plus some other potential performance factors using combinations of the CPI and SPI. (Note that in some cases, current, 3-period or 6-period CPIs are used in place of the Cumulative CPI.) E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…

EAC Methods E S T I M A T E S A T C O M P L E T I O N ( E A C s ) MethodFormula 1.Cum CPI (EAC CPIc ) ACWP C + ( BAC – BCWP C ) CPI C ( ) BAC CPI C = 2. Composite EAC ACWP C + ( BAC – BCWP C ) CPI C X SPI C ( ) ACWP C + ( BAC – BCWP C ) CPI 3period ( ) ACWP C + ( BAC – BCWP C ) 0.8CPI C + 0.2SPI C ( ) ACWP C + ( BAC – BCWP C ) CPI 6period X SPI C ( ) 3. 3 Period AVG* 4. COST & SCH 5. MICOM Note: c = cumulative data * Can also use Current CPI or 6 period CPI in place of 3 period CPI “CLICK” TO CONTINUE…

Now, how do we choose a performance factor? This is where the analysis and evaluation comes into play. Based on information that the program office has regarding what is happening technically, combined with risk assessment and other programmatic information, the program office needs to determine which factor is the best predictor of contractor performance from “now” until contract completion. The CPI and SPI provide indicators of the contractor’s efficiency up to this point (with the potential of isolating more current trends if those are determined to be better indicators of future performance). E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…

Now, how do we choose a performance factor? The Program Office needs to do the following:  Assess Current Status  Technical Performance  Schedule Performance  Cost Performance  Identify Program Risks and Issues  Forecast Future  Technical Performance  Schedule Performance  Cost Performance This information should be incorporated into the determination of the PMO EAC range (Best, Worst, Most Likely) The PMO can also calculate a modified “bottoms-up” by assigning different performance factors to different WBS elements E S T I M A T E S A T C O M P L E T I O N ( E A C s ) “CLICK” TO CONTINUE…