Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.

Slides:



Advertisements
Similar presentations
1 Update on Bicyclist & Pedestrian Data Collection and Modeling Efforts Transportation Research Board January 2010 Charlie Denney, Associate Michael Jones,
Advertisements

Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
County of Fairfax, Virginia Department of Transportation Tysons Transportation: Planning, Analysis, and Design Projects Presented to: Transportation Committee,
Innovation: User Support Terminals. Built around existing integration terminals Combine social services, shopping, banking, etc. Provide service access.
General Update March Background As the region grows, increased travel demand on our aging Metro Highway System will continue to create additional.
Monterey Branch Line Association of Environmental Professionals and American Planning Association July 28, 2010.
Prague Public Transport Co. Inc. Jan Barchánek Bus operation unit, deputy manager Prague, May 2012 Basic information Metropolitan bus lines.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Emerging California Passenger Rail Corridors A Comparative Look at the Future For Enhanced Passenger Rail in Coachella Valley/Banning Pass and the Delmarva.
CityCo, Piccadilly Hoteliers Forum
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
MAC -- Update on CTfastrak October 16, What is CTfastrak? Bus Rapid Transit (BRT) Bus Rapid Transit (BRT) –Fast, frequent, reliable service throughout.
INTEGRATED LAND USE AND TRANSPORT PLANNING
Summary of Conference Proceedings Prof H. M. Shivanand Swamy CEPT University September 8, 2012 Ahmedabad Management Association.
Noor E Alam, Ministry of Road Transport and Bridges, Bangladesh 2 nd ASIA BRTS, Ahmedabad, India BRTS IN D HAKA : D ESIGNING UNDER C ONSTRAINTS.
Ashwin Mahesh IIM Bangalore Mobility in Bangalore: The journey so far, and the road ahead.
India Sustainable Urban Transport Program (SUTP) – BRTS Experience
9/7/2012 MBS UU.
SR 50/UCF Connector Alternatives Analysis Orange County Board of County Commissioners January 13, 2015.
An Integral Perspective on the S.E. 17 Corridor October 29, 2013 Calgary.
Lecture 6 Bus Rapid Transit, design elements and operational issues Dr. Muhammad Adnan.
Rajkot Municipal Corporation. About City  Location : 20.18N & 70.51E  Heart of Saurashtra region  Area : Sq.Kms  Population : 12,90,000 (as.
SPUTNIC – Strategies for Public Transport in Cities Strategies for Public Transport in Cities Funded by the EU Project introduction.
Monitoring Centre for Road Safety and Accident Prevention in Krakow 13 September 2011 Brussels, Belgium Lukasz Franek, Krakow University of Technology.
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Coimbatore, Tiruppur and Tiruchirappalli transport proposal Sustainable Cities through Transport February 2014 Commissionerate of Municipal Administration.
Curitiba, Brazil 40 Years of Careful Planning TravelBlog.
Urban Transport Benchmarking Initiative Paris and the Urban Transport Benchmarking Initiative Isabelle Bachmann- RATP- Paris.
BUS RAPID TRANSIT (AS PART OF ENHANCED SERVICE PROVISION) Workshop 2 1.
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
Managing Director/CEO
Presentation by: Permanent Secretary - PMORALG Mr. Jumanne Sagini 3 rd June 2014.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
RapidRide Briefing Growing Transit Communities East Corridor Task Force January 31 th, 2012 Ron Posthuma, Assistant Director King County Dept. of Transportation.
1 Metrolinx delivers The Big Move Regional Transportation Plan: Transforming Transportation in the Greater Toronto and Hamilton Area November 5, 2012 Bruce.
Key Transport Policy Issues for 2010 Stephen Clark Deputy Clerk to the Authority 18 January 2010.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Auroville, 22 March 2011 Slide 1 Managing mobility for a better future.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
 City of Hamilton – Transportation Sustainable Mobility Summit – October 27, 2013.
PUBLIC TRANSPORT IN SKOPJE: NEW APROACH FOR BETTER QUALITY OF SERVICE
Green Transport Dr Lina Shbeeb Minister of Transport. Jordan.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Sustainable mobility in Lviv mobility.lviv.ua. Sustainable mobility – any type of transportation that can help reduce environmental impact. This may include.
NEW STRATEGY FOR TRANSPORT GOVERNANCE IN MONTREAL March EMTA Meeting, Madrid.
10 May 2015 Planning for BRT in Giza and New Cairo.
Cal y Mayor y Asociados, S.C. Atizapan – El Rosario Light Rail Transit Demand Study October th International EMME/2 UGM.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
Shreya Gadepalli Regional Director (India) August 2015 The BRT Standard Bus Rapid Transit Best Practices.
1/14 Next Steps for Participating Economies to Develop EE Urban Passenger Transportation 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team.
TRANSMILENIO ENRIQUE LILLO EMME/2 UGM May Bogotá n 7 million people n Mean annual population growth of 4,5 % over the last 10 years n 25 % of Colombian.
Public Transportation Planning: Rapid transit solutions for adequate mass movement Mobility.
Targeting to achieve competitiveness and attractiveness of its territory, new network opportunities, sustainable urban and community development efforts,
Greetings from India. A Country of a billion people with 350 million in urban areas.
Update to Dublin Chamber of Commerce Network Direct Paddy Doherty Thursday 18 th November 2010.
The case studies of Mexico City and Belo Horizonte Carbon Expo Cologne, 28 May 2010.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
COMPREHENSIVE PLAN UPDATE MEETING 2 – TRANSPORTATION ELEMENT 12/12/2013.
The Gauteng Economic Indaba Transport and Logistics Mr Piet Sebola Group Executive Strategic Asset Development Date: 09 th June 2016.
A Presentation to: River to Sea TPO Board October 26, 2016.
A Presentation to: River to Sea TPO BPAC November 9, 2016.
River to Sea TPO - CAC/TCC
Bus Rapid Transit (BRT) ACEC Presentation May 25, 2017
Bus Rapid Transit Study
Status Report on Rochester’s DMC Transportation Plan
PUBLIC TRANSPORT INDUSTRY
Presentation transcript:

Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT

Growth direction: along the corridor between the two cities. NAVANAGAR DHARWAD NAVALGUND HUBLI KALGHATGI KUNDGOL INDIA KARNATAKA DHARWAD DISTRICT  Twin cities separated by about 20 km.  Single municipal area: 202 sqkm  Population : 0.94 million(2011)  Density: 4678 persons per sq.km.  Hubli: commercial centre and business hub of the region.  Dharwad: administrative seat of the District and Educational hub of the region. SOME FACTS

Travel Characteristics Two lane road. Average time taken: Peak period : 64 mins Public transport: main mode million use PT every day. PT operator: NWKRTC, a state government undertaking PHPDT. Buses comprises 7 % of total traffic along the corridor; carry 70 % of the passengers.

Context  Project sanctioned for widening of two lanes to four lanes.  Overall PT mode share for the twin cities: 30%  Two-wheelers: 67% of total vehicles.  Vehicle growth rate: 9.5 %  Mobility plan projected drop in PT share to 25% by Concerns for PT 45% of fleet over-aged, Congested buses, poor infrastructure, lack of last mile connectivity.

ISSUES Wouldn’t widening to four lanes be enough? Is BRT required at this point of time? BRT-land acquisition costs, resettlement issues.

Present V/C : 1.3 Even with 4 laning : V/C > 1 before With BRTS, V/C : 0.84 in Wouldn’t widening to four lanes be enough?

Is BRT required at all? BRT-land acquisition; costs, resettlement issues. High EIRR( 29.5%) Benefits: savings in vehicle operating costs, commuter time, benefits due to accident reduction, savings due to reduction in carbon emissions etc. Total benefits valued at US $ 611 million in present value terms. Makeover of PT required to retain present share; to attract more commuters. Public transport needs focus - NOW not LATER.

OPERATING COSTS NEED NOT BE SUBSIDIZED.

Proposed BRTS Corridor Dharwad CBT Hubli CBT Hubli Rly Station Airport Tarihal Industrial area Karnataka University NWKRTC terminal BRT Corridor Terminal LEGEND N Gopankoppa Electricity Grid FEEDER Navanagar Hosur cross Rani Chennamma circle (OCBS) Jubilee circle PROPOSED BRT CORRIDOR: Km FEEDER SERVICE: 19.7 km Dedicated corridor:21.35 km Mixed traffic: 0.9 km BRT - NETWORK DHARWAD HUBLI

Elements of HDBRTS  Dedicated corridor for km. In mixed traffic : 0.9km.  Central bus lanes with Median bus stops; Closed system.  Regular/Express services. Passing lanes.  At-level boarding & alighting; Off-board fare collection system ; Fare structure: Increase by 16-20% over prevalent fares.  Rolling stock: 160 : 12m, 900 mm floor buses; articulated buses(30)  Access to the corridor: At-grade pedestrian crossings; FOBs, Pelican signals.

 Comprehensive development of the city transport infrastructure:  Depots, workshops, terminals both for BRT and feeder buses.  Integration, physical, service, fare, information.  ITS for BRT, Depot/workshop management, feeder services and traffic management.  Last-mile connectivity.  Integrated Land use and transport planning.  Communications and outreach. Elements of HDBRTS

Project financing Total project Cost including Land acquisition: $133.6 million.

INSTITUTIONAL ARRANGEMENT Special purpose vehicle created for implementing the project: Hubli-Dharwad BRTS Company Limited – Company registered under the Companies act. – Stakeholders represented on the Board of Directors. BRT bus operations by NWKRTC. – Service level agreement between NWKRTC and SPV.

WHERE ARE WE TODAY DFR prepared by CEPT University, consultants for the project. Physical Design : Design of Corridor and Transit Infrastructure completed. Preparation of RFPs, Bid Documents under way. Land Acquisition under progress. BRT Corridor work under progress. BRT Project completion date: January, 2015.

HDBRTS - SNAPSHOTS BRT STATION

BRT Workshop, Gokul road, Hubli Divisional workshop, Airport road, HubliBRT depot, Dharwad OCBS Hubli