Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting 1994. The site was situated.

Slides:



Advertisements
Similar presentations
Municipal Solid Waste Defined in 40 CFR Part 258.2
Advertisements

Wastewater and Stormwater Discharge from Landfills Rick Pinneo Illinois EPA.
CONSTRUCTION DRILLING INC.
CONSTRUCTION DRILLING INC. SPECIALIZING IN UNIQUE DRILLING AND CUT-OFF WALL SOLUTIONS.
WASTE DISPOSAL By Heidi Rowlands November 2003.
Home with an Underground Heating Oil Tank (UST) Solutions for your Leaking Heating Oil Tank.
Presented by Manuel Fernandez Environmental Engineer
Role of Activity & Use Limitations in Clean Energy Development at Disposal Sites Elizabeth Callahan Acting Division Director, Policy and Program Planning,
Earth Control Measures at Project Detail Site Location Marina Barrage.
A flood occurs... Any time a body of water rises to cover what is usually dry land.
Greenwich Peninsula.
Cytec Statement of Basis and Permit Modification July 16, 2012 Public Hearing Ohio Environmental Protection Agency.
 ideally the disposal methods should meet the following condition:  environment friendly  cause no health hazard  economically less demanding  maximum.
Environment Engineering I
Development of Sanitary Landfill and Capping of Existing Dump site at Mysore
PRESENTED BY S.S.GEHLOT ADEN/BR/JU G.S. GAUTAM ADEN/JND S.P.VYAS AXEN/C/JU R. MATHUR AXEN/C/JP GUIDED BY SH. A.K.GUPTA PROF.TRACK-I IRICEN-PUNE.
Foundations and basements
Project details • New headquarters for HKSB
PILING IMPLICATIONS FOR A NEW INDUSTRIAL DEVELOPMENT ON A CLOSED LANDFILL SITE By Michael Redfern.
Jasmit Bains and Jamie Laukaitis.  East Midlands - centre of the ‘Industrial revolution’  FACT : PRIDE - P artnership to R egenerate through I nnovative.
Keith Dorn Jesse Mefford Hunter Shealy ceramics.org.
Sydney Olympic Park Environmental Geotechnology By Lucien Power and Thomas Watson.
Pride Park, Derby Nick Graham and Kevin Hargreaves.
OPEN DUMPS Oldest and most common way of disposing solid waste
G3 – Environmental Geomechanics (Dr Sam Yuen)
Foundation Fundamentals GSD 6204 Building Technology Harvard Graduate School of Design.
Parking Lot 53 Hydraulic Analysis Aaron Gutierrez Aaron Libson William Ryman Alejandro Valenzuela.
1 Groundwater Pollution Containment of Pollution.
Chapter 18 Foundations.
 All organisms use resources to maintain their existence and the use of these resources has an impact on the environment  Currently, the Earth is experiencing.
 The purpose of this presentation is to elaborate and increase readers awareness on the potential solid waste (hazardous, non hazardous and mixed waste)
Other Construction Projects
Topic B2 Sub-structure groundworks
EnE 301: ENVIRONMENTAL ENGINEERING
Pavement Analysis and Design
How Landfill s affect US by hailey marr What is a landfill? F A landfill is an engineered depression in the ground used to store wastes. F Like a bathtub.
ROAD WITHOUT DRAIN A GREAT DISASTER - A case Study By Er. Nandanandan Das Ex. E.I.C cum Secretary, Works, Govt. Of Odisha 1.
E4014 Construction Surveying Pavement Setout. Road Construction Consists of a number of sequential steps –clearing –earthworks –drainage works –pavement.
MUNISPORT LANDFILL Vijay Kumar Rayabharapu. Munisport Landfill (Biscayne Landings) Landfill N N.E. 151st St., Biscayne Blvd ) Florida International University.
By: Rick Ayers Yates County Soil & Water Conservation District
The Cell Membrane The regulates what enters and leaves the cell The cell membrane regulates what enters and leaves the cell It also provides support and.
Ch 11 and 19 Final Exam Review. What has caused fresh water to become one of our most threatened resources? Pollution and misuse In what three states.
 incorporates  gas collection, storage and compressor system  leachate collection, storage and treatment facilities.  prevent leachate leakage into.
Methods of Landfilling
EXERCISE 1 GROUP : OPERATOR. Safety Case : Post Closure Of A Disposal Facility Introduction  The facility is situated in Vaalputs, South Africa.  It.
Water Pollution and Solutions Chapter 11 section 4.
GO C3Analyze and Evaluate Mechanisms Affecting the Distribution of Potentially Harmful Substances within an Environment. Transport of Materials Through.
Track Drainage CE2303 Railway Engineering. Drainage-General Drainage is the natural or artificial removal of surface and sub-surface water from an area.
Manure Storage Systems and Structures Determining environmental impacts of manure storage and storage systems on the farmstead. Joesph Kelpinski, MAEAP.
GROUND IMPROVEMENT TECHNIQUES
Mandatory Requirements of Ecological Solid Waste Management Act (RA 9003) on CLOSURE AND REHABILITATION OF DUMPSITES.
Understand foundation design and construction
FOUNDATIONS.
WATERSHEDS AND POLLUTION. What is a Watershed? A watershed is simply: an area of land where runoff collects and then is a water supply to a large lake.
Chapter 16 Landfill Liners and Geosynthetics
Chapter 20 Earth Science Our Impact on Land. Words to Know – Section 1 Population Impact on the Environment population parrying capacity pollutant.
Substructure Groundworks - Hazards
Landfills.
Lecture (5): Waste treatment and disposal
Landfill Review.
Boscastle - the most frightening flood of the decade?
Our Impact on the Land.
Numfon Eaktasang ,Ph.D Thammasat University
4th Annual Construction Law Summit
Scientific or Engineered Landfilling of Waste
Landfilling (Containment and Restoration) in Ireland
Any time a body of water rises to cover what is usually dry land.
PAPER 3: Geographical Applications
RAIN WATER HARVESTING By WESI Water and Energy Strategy Institute
WASTE DISPOSAL No matter what processing is done, there will be some residue that needs to be disposed of safely Options for disposal Modern, engineered.
Presentation transcript:

Lorong Halus Interchange Introduction: Project to build a new $26 million interchange for the Tampines Expressway starting The site was situated on a disused landfill site which had been used for approximately 10 years. Site deserted in the mid 1980’s. 20 hectare site.

Problems (1) Expressway had to be built on site due to scarcity of land. The unknown effect of leachate, landfill gas and waste material on the road pavement and structures. Leachate was perched in the landfill. The leachate itself had too high a composition for direct discharge into the sewer. Soil was in the phase where landfill gas was being formed by the decomposing products. There were some pockets of gas at relatively high pressures. This could have potentially posed a fire hazard during construction.

Perched leachate as a result of a low permeability soil layer below the waste layer. (3.0 x m/s).

Problems (2) Potential problem of settlement of fill beneath the overpass. Potential problem with piles encountering obstacles in the landfill. Need to prevent more water percolating in landfill embankment and creating further spread of leachate and waste substances. Problem of erosion of surface from heavy tropical rainfall. Risk of biofueling – (Where encrustation blocks the stones in the gas collection layer.)

Adopted Solutions (1) A 1500mm sand cut-off wall to prevent underground fire between disused and active dumping sites. Bored piles not driven piles were used for the carriageway to avoid obstacles in landfill. Concrete bored piles and substructures protected from aggressive leachate by High Density Polyethylene (HDPE) sleeves. Leachate drains were installed at the side of the carriageways to prevent pavement surface damage.

Protective Sleeve for Concrete Structures

Cross-Section of Expressway

Adopted Solutions (2) Gas in landfill was intercepted at the surface by a low permeability layer and vented under its own natural pressure to safe discharge points. (Passive Venting) Gas under carriageway was contained in a permeable venting layer of granite stones and carried to vent stacks along perforated plastic tubes. (Active Venting) Mound created from excavated landfill needed some form of capping layer. Capping layer prevents surface runoff water getting into landfill. Designed for 1 in 100 year storm event.

Cross-section of Adopted Capping Layer

Alternative Solutions Move excavated landfill to another landfill site. (Prevent the creation of mound). If contamination of leachate was higher then the use of a sodium bentonite cut-off wall would need to be considered. Use of alternative capping layers? Lack of alternatives, since contamination isn’t a direct risk to human health and the project is ‘Unique’.