F. Formenti - ALICE forum 16/03/2006 1 Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others.

Slides:



Advertisements
Similar presentations
Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
Advertisements

Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Front-end electronics for the LPTPC Outline of the talk:  System lay out  Mechanics for the front-end electronics  End-cap and panels  Connectors and.
April 17, 2015Jonathan Valvano EE445M/EE380L.6 Recap RTOS Debugging/verification Lab 4 Application of RTOS Input sound, analog filter Digital filter, FFT.
DCS meeting, CERN, 17 June 2002Børge Svane Nielsen, NBI1 Forward Detectors DCS Forward Detectors (FWD): T0- quartz Cherenkov V0 - plastic scintillator.
Forward Detector Meeting, 11 Mar 2003Børge Svane Nielsen, NBI1 Si-FMD status Forward Detector meeting, CERN, 11 March 2003 Børge Svane Nielsen Niels Bohr.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
ITS TGeo geometry Status and challenges By Bjørn S. Nilsen The Ohio State University.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
SSD Operations Manual March 2014 SSD: 4 th layer of vertex detector Heavy Flavor Tracker Silicon Strip Detector – Operations Manual PXL Inserted from this.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
Low Voltage Power Requirement of TOF FEEs. Maximum tray. Low Noise:  Periodic and Random Distortion (PARD) < few mV RMS Floating.
PROFIBUS wiring/installation can be done with:
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
1 Module and stave interconnect Rev. sept. 29/08.
LHCb F. Murtas Servizio elettronica G. Corradi D.Tagnani P.Ciambrone HV_GEM per LHCB M1R1 HV power supply Introduction Introduction HV_GEM Technical specification.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
Gif++ CR tracker setup G. Aielli for the RPC collaboration.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
1 Outer Tracker Front-End Layout Distribution of Signals and Bias NIKHEF/HeidelbergOctober 2002.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
W. Karpinski, Nov CMS Electronics week CMS Microstrip Tracker grounding & shielding of the CMS Tracker R. Hammarstrom (CERN EP/CMT) & W. Karpinski.
The ALICE Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr Institute for the ALICE Collaboration.
BKLM RPC Signal & Ground Schematic Gerard Visser, Indiana University (for the barrel KLM team) 10th B2GM, 11/2011 magnet structure GND 7mm FOAM 3mm GLASS.
Doug, here are some slides. FGT Electrical Integration ethernet trig/clk DDL fiber Wiener MPOD controller ISEG 8 ch HV -4 2 mA ARC module (APV Readout.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
Grounding Studies Metal box sensor SVX4/hybrid Analog cable GND(20W)
Grounding Guidelines Developed for LBNE
Pixel Endcap Power Distribution Phase 1 Upgrade Plans Fermilab, University of Mississippi, University of Iowa Lalith Perera University of Mississippi CMS.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC January 17, 2003TOTEM plenary meeting -Marco Bozzo1 CSC detectors for T1.
17/1/07 F. Formenti PH-ED1 Competence domain (PH-ED) What field of expertise ED can provide?  System electronics design  1.Front-end detector electronics.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
Front End Board (16 channels) Superlayer Cross Section Frontend Enclosure HV cap board HV cap Board Signals from chamber wires go to HV cap board to be.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
C. Lu, K.T. McDonald RPC Connections October 27, RPC Module Signal and HV Connections (October 27, 2008) Changguo Lu, Kirk T. McDonald Princeton.
Assumptions: Cockcroft-Walton photomultiplier bases are the same for all ECAL sections Digital to analog converters are installed on the distribution boards.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
Thermal Screen Grounding CERN - Dec. 10 th, 2003 Enzo Carrone The thermal screen grounding and the tracker: a scary concert Enzo Carrone.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
1 (Gerard Visser – STAR Integration Meeting 5/16/2008) STAR Forward GEM Tracker Readout/DAQ Integration G. Visser Indiana University Cyclotron Facility.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
Controls Crate. Mains Power Supply (x2) The 24 VDC generated by this module supplies all the power needed for the controls electronics. The 24 VDC generated.
Belle-II bKLM RPC Readout Power & Ground Discussion 12 th Belle II General Meeting Gerard Visser Indiana University CEEM 7/24/2012.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
EMC review for Belle II (Grounding & shielding plans) PXD system - July 2012 Dr. Fernando Arteche.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
Calorimeter Mu2e Development electronics Front-end Review
Meeting on Services and Power Supplies
DT & RPC Grounding STATUS
Overview of T1 detector T1 is composed by 2 arms
Presentation transcript:

F. Formenti - ALICE forum 16/03/ Contacted some teams for system GND discussions: cases analyzed are presented here Planned to continue with others with the same interactive and practical approach - GNDing is a common (neighborhood) issue - GND is a global (inter)system(s) issue, it should be treated with the knowledge of all possible interfaces between heterogeneous system parts What needed is a comprehensive schematic diagram with: - detector, electronics, power distribution, signal cables, patch panels, mechanics, etc. - all this for your specific system modularity Two simple feedbacks: 1) GND is not the solution to all problems: - often GNDing “difficult” because trying to correct other causes through complex GNDing scheme (ex. poor CMRR, instabilities, non linear behavior, insufficient power delivery/poor filtering, etc.) 2) GNDing effort is matter of compromise between system sensitivity and environment noise Background

F. Formenti - ALICE forum 16/03/ )Shield to provide low impedance Earth connection all the way through from ITS support to racks (both sides) (ITS cones and external alluminazed mylar foil + patch panel boxes + absorber + chariot + space frame + cable trays + racks). As many Earth points as possible 2)Shield for analog signals insulated from Earth and connected to it at racks (reference point because of FEROM) 3)Analog shield continuation provided by a number of shielded cables (signal and power) with differential lines; patch panel external box not connected to analog GND but to Earth 4)“Analog reference” continuation (consequence of FEROM common point) to protect hybrids & flex cables (max 70cm); as clean as possible and insulated from Earth 5)Symmetrical Common Bias to all half ladder modules referenced at FEROM; floating N and P supplies GNDed at End Cap Full analog r/o – analog supply (N & P) separate from digital supply (FEROM crate)  Needs special protection up to ADC  Sensitive electronics Hybrid, ALCAPONE and ALABUF Modularity of 144 half ladders (unless point (4)) Floating detector - reference points at racks  Relies on ITS support with low impedance to Earth because of points (2) + (3) + (4) left and right Silicon Strips

F. Formenti - ALICE forum 16/03/ MCM PIX CARBON SUPPORT GND FOIL (INSULATED FROM SUPPORT) DET CAEN EASY PS 2.5V CAEN EASY PS 1.8V GND CONNECTIONS OF ONE HALF STAVE HV PS DET BIAS R CR4 RACKS A & I Full binary r/o Sensitive electronics limited to half stave (compact layout)  Severe mechanical constraints Modularity of 120 half staves Floating PSs - reference point at MCM  GND foil insulated from carbon support )Common reference point for half stave; HV GND connected through a 100kOhm resistor 2)Floating LVPSs; HVPS is not completely floating by construction 3)Connection to Earth of ITS carbon support as for SSD (via cones + absorber + chariot + space frame + cable tray) 4)Twisted (but unshielded) LVPS cables (all signal connections by optical fibers) 5)Possible only one connection of ground foil to MCM GND 6)Single Earth connection of GND returns is still to be decided (closest to MCM or at LVPS) 4 5 PATCH PANEL 6 6 Silicon Pixels 3

F. Formenti - ALICE forum 16/03/ Analog electronics on FECs close to detector and ADC Modularity of ~4500 FECs / 220 RCUs Local supply regulators; separate analog and digital power  Large r/o surface does not allow “concentrated” reference point Floating PSs – reference point at each FECs RCU digital card (not shown) has also floating PSs  Data and trigger through fibers, but Ethernet slow control (transformer less) )Common reference point is FEC/SSW 2)Floating LVPSs; HVPS GND through resistor to avoid GND loop with ref GND 3)Connection to Earth of reference GND 4)Local GND (shortest) for analog circuitry (cooling plate separate GND) 5)Differential connection between analog and digital parts to avoid GND loop between analog and digital inside FEC 6)Local VRs to help filtering more noise (see also point (7)) and local capacitors 7)Untwisted, unshielded power cables (large section) 2 6 Time Projection Chamber 6 76

F. Formenti - ALICE forum 16/03/ Slow Controls based on TRD DCS cards & Ethernet 1)Connection of all the shielding (racks, cable trays, switch bodies, braids of shielded diff lines) together and in all possible Earth points to lower global impedance 2)Floating PSs 3)Definition of common GNDs at detector side 4)Definition of common GNDs at switch side 5)Separation of different GNDs assured by PHY transformer (important very good quality)  DCSs on very large surface and different systems  No transformer at DCS due to magnetic field  Switch is commercial device 3

F. Formenti - ALICE forum 16/03/ T0 detector 1a a) True reference point is at shoebox side: Preamp and TRD digital join here. Also Earth reference is provided 1b) Additional Earth point because of T0 FEE construction (no differential link, case for lowering global impedance) 2) Floating LVPSs 3) Fully shielded power lines all way through 4) Independent resistors on HV returns to avoid signal GND loop 5) HV cables must stay independent (or have their own independent return) all way through, insulated from Earth and are not fully floating at HVPS (HVPS construction) 1b 1a Analog readout; detector floating (with safety GND);  Very fast analog signal, psec resolution Modularity of 12 PMTs  Shoebox joining point of two distributed systems and independently powered Floating PSs – reference point at TRD shoebox  Warning: no differential connection between shoebox and FEE in crate O18

F. Formenti - ALICE forum 16/03/ END PLATE TPC ITS CHARIOT MUON ABSORBER SSW SPACE FRAME 1 1)ITS suspension points: better if insulated from TPC 2)Chariot directly GNDed through space frame (not SSW) 3)TPC outer cylinder in electrical contact with both side end plates 4)Heating strips (if unused) in electrical contact with TPC inner cones 5)Connect ITS carbon support to: chariot and absorber TPC/ITS mechanics Earthing SSW SPACE FRAME