DELHI BRT SYSTEM ISO 9001 : 2008 ISO 14001 : 2004 BS OHSAS 18001 : 2007.

Slides:



Advertisements
Similar presentations
York Viva Bus Rapid Transit (BRT) Concept image along Davis Drive.
Advertisements

1 Update on Bicyclist & Pedestrian Data Collection and Modeling Efforts Transportation Research Board January 2010 Charlie Denney, Associate Michael Jones,
Emphasizing TDM in Transportation Planning Asher Mercer TDM Summit November 18, 2009.
Tysons Tysons Corner Circulator Study Board Transportation Committee June 12, 2012.
Warning!!! Work in Progress. Details may change before final approval WESTERN AUSTRALIA LIVEABLE NEIGHBOURHOODS CODE 2004 Review Towards a mandatory state-wide.
Innovation: User Support Terminals. Built around existing integration terminals Combine social services, shopping, banking, etc. Provide service access.
IPPR Conference - 26 October 2005 Building a consensus on national road pricing: the challenges ahead Session 3 The next steps for London Dick Halle Transport.
2008 MTA NYC Travel Survey Summary of Selected Results June 22, 2009.
The Stockholm Trials - Congestion charge in Stockholm Muriel Beser Hugosson, PhD.
POWER INTERREGIONAL PROGRAMME INTERREG IVC TransportCarbonIntenCities TraCit Merle Laager Project Manager of Viimsi Municipality.
Dharmesh Shah 07 Oct 2008 City Planning and Road Safety Dharmesh Shah Traffic and Public Transposrt Authority.
Green Mobility in Copenhagen Annette Kayser City of Copenhagen.
1 Innovative Tools October 27, 2011 Chi Mai. 2 Presentation Overview VISSIM Corridors VISSIM Protocol Hours of Congestion.
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Parking Management in Zurich: the key towards usage of private cars in the City Roberto De Tommasi, synergo, Zurich ECOMM2011 Toulouse, 18 – 20 May 2011.
TRB National Transportation Planning Applications Conference Columbus, OH May 2013 Estimating Bus and Rail Travel Times For Transit Corridor Studies Presented.
Force & Motion review.
February 12, 2010 Government Center Station Reconstruction Project Green Line / Blue Line Public Meeting December, 2012.
Overview of Network Analyst
Prague Public Transport Co. Inc. Jan Barchánek Bus operation unit, deputy manager Prague, May 2012 Basic information Metropolitan bus lines.
Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Los Angeles Bus Rapid Transit Tour Lessons Learned.
Transport for Canberra 07 November2013. Transport for NSW: Regional Transport Plan ACT, whilst not part of the region, is an important destination Transport.
CityCo, Piccadilly Hoteliers Forum
Andrew McNaughton 1 Radical Change is Entirely Possible! 2 nd November 2011.
SCATTER workshop, Milan, 24 October 2003 Testing selected solutions to control urban sprawl The Brussels case city.
Shiraz Urban Railway Organization Shiraz Traffic Studies 16 corridors and 27 scenarios in basic study 16 corridors and 27 scenarios in basic study 6.
Transportation and Air Traveler Characteristics Findings from the 2011 Washington-Baltimore Regional Air Passenger Survey Transportation Planning Board.
Riverside Community College District Free Bus Ride Program.
1 presented to Policy Steering Committee presented by AC Transit May 15, 2009 East Bay Bus Rapid Transit.
DISTANCE: (d=rt).
Coronado Transportation Commission Status Report to City Council February 21, 2012 Presented by Mike Giorgione, Commission Chairman.
1 Access Line Operation Analysis & Case Study in Beijing Metro System Zhili Liu, Ph.D. School of Traffic and Transportation Beijing Jiaotong University.
Protection notice / Copyright notice Topic 1: The Inspired Bus Company © Siemens AG All rights reserved.
BMTC : Sustainable, People-Centered and Choice mode of Travel for Everyone 1 BUS REFORMS IN BMTC Dr Ekroop Caur, IAS Managing Director BMTC, Bangalore.
Asia BRT Conference HUBLI-DHARWAD BRTS PROJECT Presented by: Commissioner, DULT.
Driving Theory Session 6 cut and paste answers
Hertfordshire Congestion Topic Group 11 June 2010.
9/7/2012 MBS UU.
Rajkot Municipal Corporation. About City  Location : 20.18N & 70.51E  Heart of Saurashtra region  Area : Sq.Kms  Population : 12,90,000 (as.
NEW YORK CITY TRAFFIC CONGESTION MITIGATION COMMISSION NYSDOT Comments on New York City Traffic Congestion Mitigation Plan Bob Zerrillo, Director, Office.
INDONESIA INFRASTRUCTURE INITIATIVE A Safe System Supporting Vulnerable Road Users Dr Dale Andrea VicRoads International.
ATAL INDORE CITY TRANSPORT SERVICES LIMITED (AICTSL) Performance Management System Madhav Pai Prajna Rao Srinivasan Vasudevan.
INNER CITY INVESTMENT SUMMIT TRANSPORT, INTEGRATED PUBLIC TRANSPORT NETWORK AND TRAFFIC MANAGEMENT Presenter: L N Mangcu SED: Transport and Roads Department.
Main Roads WA Perth Bicycle Network - Operational Overview Cycling Safety Forum 14 th May 2011.
Advanced Public Transit Systems (APTS) Transit ITS CEE582.
SUSTAINABILITY CONCEPTS IN TRANSPORT SECTOR/ OPTIONS AND BENEFITS
BETTER AIR QUALITY 2004 SPECIFIC TRANSPORT MEASURES TO REDUCE EMISSIONS IN HYDERABAD, INDIA Yash Sachdeva, RITES Ltd Viresh Goel, RITES Ltd D.S.Chari,
Prof. T. G. SITHARAM Chairman, Centre for infrastructure, Sustainable Transport and Urban Planning (CiSTUP), Indian Institute of Science, Bangalore –
School travel planning an engineer will love. School travel in Moonee Valley Need: A more planned and coordinated approach to active travel program delivery.
Making Way for Public Rapid Transit in South Asia and its Impact on Energy and Environment Bangalore, Dhaka and Colombo Ranjan Kumar Bose & Sharad Gokhale.
PUBLIC TRANSPORT ACCESS & RIDERSHIP: A CLEAN AIR ISSUE Geetam Tiwari Transportation Research and Injury prevention Programme Indian Institute of Technology.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Write down one word that comes into your thought when you read the following word: 15 Feb 2008 R. Shanthini Transport.
Bus Rapid Transit Infrastructure Design Roadway and Junctions Bus stops Shreya Gadepalli Senior Program Director Institute for transportation and.
February 2014 Bus Rapid Transit for Chennai. Chennai city bus service GOOD PATRONAGE  50 lakh daily passenger trips  3650 buses  Maximum flow of.
Roads & Traffic Department College Green Public Transport Priority measure.
1. Variety of modes (types) of transport (public and private) 2. Density of transport networks more nodes and.
MANSI V. GAGDANI.  INTRODUCTION  HISTORY  ROUTES  ROUTES UNDER CONSTRUCTION  FUTURE EXTENTIONS  OPERATIONS & SAFETY  CHOICES FOR TICKET.
Greetings from India. A Country of a billion people with 350 million in urban areas.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
GRTC Bus Rapid Transit Project July 17, Agenda 1.BRT Concept 2.Project Goals 3.Project Benefits 4.Project Corridor 5.Proposed Multimodal Access.
10 Nov Seong Yil BAE Vice President
Commission on Improving the Delivery of Transport and Pedestrian Infrastructure  Dealing with Traffic Growth &  Considering the needs of all Road Users.
Intelligent Transport System (ITS) Dr. Ekroop Caur, IAS.
SMART URBAN FUTURES PRESENTATION
(Expressway Traffic Management System)
Streets for Everyone: The Enjoy Waltham Forest Programme Mark Bland – Programme Manager LB Waltham Forest.
ROAD SAFETY AUDIT & PROPOSAL FOR CORRIDOR EXTENSION PLAN: CASE STUDY BARAPULLAH CORRIDOR, NEW DELHI (INDIA) Namit Kumar Assistant Manager (Urban Transport)
SMART URBAN FUTURES PRESENTATION
Presentation transcript:

DELHI BRT SYSTEM ISO 9001 : 2008 ISO : 2004 BS OHSAS : 2007

PREVIEW KEY FEATURES UPGRADES PERFORMANCE AUDITS LESSONS LEARNT FUTURE PLANS

KEY FEATURES

AMBEDKAR NAGAR TO DELHI GATE Corridor Detail Total Length14.5 Kms Road Right of Way35 – 50 Meters Number of Road Junctions17 Number of Bus Stations29 Bus Lanes2 X 3.3 M MV Lanes2 X 6.75 M NMV Lanes2 X 2.5 M Footpath2 X 1.5 M

TYPICAL CROSS SECTIONS AMBEDKAR NAGAR TO MOOLCHAND

Delhi BRT Dedicated Bus lane Open Bus Operation System Modern Low Floor CNG Buses

Bus shelters in Centre Level Boarding Disabled friendly Delhi BRT

Delhi BRT – Best Pedestrian Facilities in Delhi

Delh Delhi i BRT – Best Facilities for Cyclists in Delhi Delhi BRT – Best Facilities For Cyclists In Delhi

Delhi BRT – Statistics AVERAGE NUMBER OF BUSES PER DAY AVERAGE NUMBER OF PASSENGER PER DAY AVERAGE NUMBER OF CYCLISTS PER DAY – 6000 AVERAGE SPEED IN BUS LANE - 16 – 18 KMPH AVERAGE SPEED IN MV LANE - 12 –16 KMPH FOB USAGE AT AMBEDKAR NAGAR PER DAY FOB USAGE AT PUSHP VIHAR PER DAY

UPGRADES

Operation Control Centre (OCC) DIMTS has set up a Operations Control Centre To Monitor BRT Operations

Intelligent Signalling System First of its kind in India Commissioned at 18 junctions Three levels of intelligence Vehicle Actuated Radar optimizes signal cycle locally SCOOT algorithm optimized throughput over the network High resolution cameras record and display video System designed for 750 junctions – enough to cover entire city of Delhi

Automatic Vehicle Location System (AVLS) Advantages - Track any bus at any given time - Check buses for route deviation, unauthorised halts, skipping an authorised stop, overspeeding Total installation ̶ DTC – 3258 Buses ̶ Cluster Buses – 168 Buses PIS Boards : 500 Nos. ̶ Installation of boards in progress ̶ Display bus arrival at each bus que shelter

CYCLE STATIONS – KEY DETAILS No. of Bicycles50 (10 Cycles at each Station) No. of GreenBIKE Stations5 Stations Public Parking FacilitiesAvailable for 5 Bicycles No. of Registered Members80 No. of daily customers (average)50-60 No. of employees involoved15 (5 DIMTS + 10 Concessionarire) Average duration of trip (estimated) 2-3 hours Average bicycle occupancy / day1.23 Average Number of trips in a week Working Hours5:00 AM to 10:30 PM Fare Structure - First 4 hours - Each extra hour Rs. 10 Rs. 5

PERFORMANCE AUDITS

EVALUATION BY DARIO HIDALGO & MADHAV PAI IN 2009

Delhi BRT – Commuter Survey

Uiop uiuiuiopuiuiuuiuiouiuuiuiuiuuuuiuuiuiui\iuiuiuri The Bus Corridor has reduced the Average Travel Time of Bus Commuters by 35%. 19 2,078 3,186 Source: “Observations on the Bus Corridor in Delhi” - Dario Hidalgo, Submitted to the Center of Science and the Environment (February 2009) Delhi BRT – Impact on Average Travel Time

Delhi BRT – Average speeds Data Sources – study by Mr Dario. In Km/h

Delhi BRT – Passenger Movement Data Sources – study by Mr Dario. In Phpd

ROAD SAFETY AUDIT BY CONSIA DENMARK - OCT 2011 INADEQUATE MID BLOCK PEDESTRIAN CROSSING SEE THROUGH PROBLEM WITH SIGNAL HEADS OBSCURED LIGHTING AT PLACES OBSTACLES IN FOOTPATH & CYCLE LANE INAPPROPRIATE LOCATION OF MEDIANS

ISSUES AND CHALLENGES DEDICATED BUS LANE - OVERSPEEDING - OVERTAKING SIGNAL SYSTEM - QUE LENGTH - CYCLE TIMING INCIDENT MANAGEMENT - MINIMISE DISRUPTION - LIAISON WITH POLICE ENFORCEMENT - TWO WHEELERS IN CYCLE LANE - PARKING AND DUMPING CONSTRUCTION MATERIAL ON PEDESTRIAN PATH - KEEP HAWKERS IN CHECK - JAY WALKING

LESSONS LEARNT

INTEGRATE URBAN PLANNING PRESS ENCLAVE ROAD LEADS TO SHOPPING HUB, HOSPITALS, HOTELS, FAMILY COURT, TRANSPORT AUTHORITY THUS LEADING TO TRAFFIC JAMS ON THE BRT OPEN SYSTEM DIFFICULT TO MANAGE OPERATIONS IN AN OPEN SYSTEM PEDESTRIAN CROSSINGS PEDESTRIANS PREFER CROSSINGS AT GRADE. NUMBER OF FOBs HAVE BEEN CONSTRUCTED BUT THEIR UTILISATION REMAINS LOW ENFORCEMENT BUS LANE IN CENTRE OR KERBSIDE, OR AN ELEVATED BRT, ALL CAN BE SUCCESSFUL PROVIDED THERE IS WILL TO ENFORCE

FUTURE PLANS

BRT CORRIDORS – DPR UNDER PREPARATION BY DIMTS - BADARPUR – AIRPORT - DHAULA KUAN – CHHAWLA - MUKUNDPUR – KONDLI - KARKARI MOR – GOKULPURI - ISBT – DILSHAD GARDEN - KARAWAL NAGAR – CHILLA - MUNDKA – PUTHKHURD BRT CORRIDORS – DPR UNDER PREPARATIONS BY PWD - NARELA - AZADPUR - ISBT ANAND VIHAR – CANNAUGHT PLACE - ISBT KASHMERE GATE - MUNDKA - MUKUNDPUR – PALAM MOR - SARAI KALE KHAN – JOR BAGH - KIRBY PLACE – TILAK NAGAR - NATIONAL STADIUM - GHAZIPUR CYCLE SHARING BRT, Delhi University and JNU

CRRI REPORT HIGHLIGHTS 33 % INCREASE IN BUS MODAL SHARE SPEEDSAFETYCOMFORT COST CAR 35% 30% 64% 60% 2WHEELERS 55% 45% 58% 60% AUTO/TAXI 45% 20% 45% 60% SPEEDBRTS TRIAL BUS CAR