Www.kindermorgan.com. 2 Model Comparisons NAESB Nomination Model used in PASSKEY = Pathed (threaded) – “Threaded” refers to linking a shipper’s specific.

Slides:



Advertisements
Similar presentations
NAESB WEQ/WGQ Business Practices Subcommittee Jan
Advertisements

TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
ax2 + bx + c 2x2 + 11x + 5 ac 2(5) = b =11 ( ) 2x2 + 10x + 1x
Basic accounting I recap.
A meaningful company doing meaningful work delivering meaningful results Potential enhancements to the Xpress system for CIG, WIC, and CP 2008 Customer.
Fill in missing numbers or operations
1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Multiplication X 1 1 x 1 = 1 2 x 1 = 2 3 x 1 = 3 4 x 1 = 4 5 x 1 = 5 6 x 1 = 6 7 x 1 = 7 8 x 1 = 8 9 x 1 = 9 10 x 1 = x 1 = x 1 = 12 X 2 1.
Division ÷ 1 1 ÷ 1 = 1 2 ÷ 1 = 2 3 ÷ 1 = 3 4 ÷ 1 = 4 5 ÷ 1 = 5 6 ÷ 1 = 6 7 ÷ 1 = 7 8 ÷ 1 = 8 9 ÷ 1 = 9 10 ÷ 1 = ÷ 1 = ÷ 1 = 12 ÷ 2 2 ÷ 2 =
Objectives: Generate and describe sequences. Vocabulary:
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
December 1-2, 2004 Energy Day Meetings 1 North American Energy Standards Board Wholesale Gas Quadrant Overview of Gas Day Standards December 2004.
Energy Day Timing Issues and Operational Concerns Pipeline Segment Wholesale Gas Quadrant North American Energy Standards Board Business Practices Subcommittee.
1 Intra-Day Nominations through a Posted Point of Restriction Kathryn Burch Project Manager – Standards and Regulatory Compliance Spectra Energy Transmission.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
We need a common denominator to add these fractions.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Applicable for Persons Registered under Article 10
1 Florida Gulf Coast University Small Business Development Center (SBDC) Procurement Technical Assistance Center (PTAC) FAR.
Impressive Star Softwares (P) Ltd. Presents Sent Item Box-Detail of Mails from Tally ( 1.0 )
1 Daily ATM/Debit Maintenance through CU*BASE A Preview of ATM and Debit Card Maintenance Screens Prepared June 24, 2009.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Headquarters U.S.A.F. 1 Commodity Councils 101 NAME (S) SAF/AQCDATE.
A sample problem. The cash in bank account for J. B. Lindsay Co. at May 31 of the current year indicated a balance of $14, after both the cash receipts.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
Regulations Governing the Conduct of Open Seasons for Alaska Natural Gas Transportation Projects Federal Energy Regulatory Commission February 9, 2005.
Rich Paglia Vice President
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
Look at This PowerPoint for help on you times tables
An Application of Linear Programming Lesson 12 The Transportation Model.
05/ Working Smart For You Access to multiple Midwest markets Access to multiple supply sources Access to Michigan & Ontario storage fields Flexible.
1 Considerations in Gas Contracts Using LNG Supply Texas Utility Lawyers Association October 13, 2005 Craig Enochs Jackson Walkter L.L.P.
Inventory and Warehouse Processes. Slide 2 Introduction Inventory and warehouse management are closely related to the fulfillment and production processes.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
+21 Economic Expectations Europe December 2013 Indicator > +20 Indicator 0 to +20 Indicator 0 to -20 Indicator < -20 European Union total: +14 Indicator.
Subtraction: Adding UP
NATURAL GAS ADAPTIVE SCHEDULING Peak Energy Solutions, Inc. Phone: (719)
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
PSSA Preparation.
Immunobiology: The Immune System in Health & Disease Sixth Edition
Energy Generation in Mitochondria and Chlorplasts
EXAMPLE 3 Use synthetic division
Profile. 1.Open an Internet web browser and type into the web browser address bar. 2.You will see a web page similar to the one on.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
Marketing Channels.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
1 Transco’s Post Cycle Customer Testing and Training Packet Overview scheduled implementation in 1Line: May 2, 2007 for May 1, 2007 business In response.
® July 30 th, 2014 Utah PSC Technical Conference.
1 Explanation of NAESB Request R11012 October 13, 2011 Kathryn Burch, Project Manager - Standards and Regulatory Compliance Michael Wolf, Senior Commercial.
WEBEX March 16, Tim Dorpinghaus Director West Marketing.
Nominations PEA Meeting October Why ask for Nominations? In a common carriage system gas flows must be approved in advance to keep them within pipeline.
Black Hills Dist. LLC and RMNG Natural Gas
GTAC Workshop Block 1 10 July 2018.
QPTM- Nominations.
Presentation transcript:

2 Model Comparisons NAESB Nomination Model used in PASSKEY = Pathed (threaded) – “Threaded” refers to linking a shipper’s specific commercial counterparties at receipt and delivery locations to a specific pathed transport nomination line item, and to each other. – Ranking are inputted at receipt and delivery ends of path. Ranks are used in applying scheduling cuts (of within same level of priority), balancing transactions caused by receipt and delivery reductions (both during confirmations and pipeline balancing) across all of a shippers contracts at a scheduling restriction or balancing location. – Once a path is determined to be cut the linked market (or supply) must be cut. There is no flexibility to allow shippers to unthread their transactions. NAESB Nomination Model used in DART= Pathed Non-threaded – Allows a shipper to separate commercial counterparty (buy/sell) transactions at specific locations from transportation transactions between locations. – Gives shippers more flexibility of their business via ranks. Shippers can individually rank supplies and markets, receipt and delivery locations, and paths between receipt and delivery locations. This model also inherently supports cross-contract ranking for balancing transactions caused by receipt and delivery reductions (both confirmations and pipeline balancing). Path ranks are used to apply scheduling restrictions among all the paths within a given contract. – Once a path is cut, the shippers ranks dictate which market (or supply) gets cut. There is no linked supply to market forced cuts.

3 Example of Pathed Non-threaded (DART) Shipper KT #11111 Delivery Point B Receipt Point A Up ID BBBBB Up ID AAAAA Down ID YYYYY Down ID XXXXX This activity is pathed because a specific receipt location is tied to a specific delivery location on each line item. This activity is not threaded because commercial counterparties at the either end of the path are not specifically linked to each other. For example: receipt reductions of upstream suppliers is fully in the control of the shipper via separately identified ranks all the way to the ultimate downstream markets. Up ID DDDDD Up ID CCCCC Delivery Point D Down ID YYYYY Down ID ZZZZZ Delivery Point C Shipper KT #11111 Shipper KT #22222

4 Example of Pathed Non-threaded (DART) – with Ranks Shipper KT # B: Mahwah A: BP Energy Atmos Hess Elm Gas Upstream Rank (Buy Line Items at Point A); ranking suppliers for cuts coming from delivery points Downstream Rank (Sell Line Items at each Point B, C, & D); ranking markets for cuts coming from receipt points Receipt Rank (Downstream Transport Line Item at Point A); ranking paths across contracts for cuts coming from suppliers to delivery paths across contracts. Delivery Rank (Upstream Transport Line Item at each Point B, C, & D); ranking paths across contracts for cuts coming from markets to receipt paths across contracts. KT Path rank; ranking which path within a KT for cuts arising from pipeline scheduling (within a priority of service) Elm Gas Midwest D: Rivervale Down Cherry Nat C: Mendon Shipper KT # Shipper KT # Shipper KT # Sequent

5

6

7

8

9

10 Example of Segment Scheduling Shipper KT # Mahwah BP Energy Atmos Hess Elm Gas Assumptions: Segment Cut – All SOP Total Nominated = 120 All Up/Dn Parties Nom = 30 Total Scheduled = 70 Elm Gas Midwest Rivervale Sequent Cherry Nat Mendon Shipper KT # Shipper KT # KT Path rank Nom = 30 Sch = 5 Nom = 30 Sch = 30 Nom = 30 Sch = 5 Shipper KT # Nom = 30 Sch = Sch = 30 Sch = 5 Sch = 30 Sch = 10 Sch = 0 PT A Sch = Upstream (Buy) rank