01-21-14 IDT Prep 01/20/2014. 1/21/14 IDT Reminders 1/21 IDT Call starts at 7:30 AM, 7 hour IDT begins at 8:30 AM –Tieline Drop –Regulation Pre-Selection.

Slides:



Advertisements
Similar presentations
TWO STEP EQUATIONS 1. SOLVE FOR X 2. DO THE ADDITION STEP FIRST
Advertisements

Advanced Piloting Cruise Plot.
Telling Time Part 2 Deutsch 1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
Chapter 1 The Study of Body Function Image PowerPoint
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Fractions VI Simplifying Fractions
NANPA Oversight Working Group Status Report to the NANC November 27, 2001 Chair Pat Caldwell.
How many hours have passed from 6:00 P.M. to 9:00 P.M.? C. 3 hours B. 6 hoursA. 9 hours.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
Arithmetic and Geometric Means
Gadsden City High School Construction Progress. Gadsden City High School March 30, 2005.
Multiplication Facts Review. 6 x 4 = 24 5 x 5 = 25.
Reducing Fractions. Factor A number that is multiplied by another number to find a product. Factors of 24 are (1,2, 3, 4, 6, 8, 12, 24).
1  1 =.
2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt Time Money AdditionSubtraction.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 10 second questions
School Shop. Welcome to my shop. You have 10p How much change will you get? 7p 3p change.
SOLVING EQUATIONS AND EXPANDING BRACKETS
Break Time Remaining 10:00.
Restaurant.org/Show #NRAShow How to Get the Most Leads from NRA Show Brian Moon VP Convention Sales & Allied Membership April 17,
EU market situation for eggs and poultry Management Committee 20 October 2011.
EU Market Situation for Eggs and Poultry Management Committee 21 June 2012.
1 Undirected Breadth First Search F A BCG DE H 2 F A BCG DE H Queue: A get Undiscovered Fringe Finished Active 0 distance from A visit(A)
2 |SharePoint Saturday New York City
VOORBLAD.
15. Oktober Oktober Oktober 2012.
1. 2 No lecture on Wed February 8th Thursday 9 th Feb 14: :00 Thursday 9 th Feb 14: :00.
“Start-to-End” Simulations Imaging of Single Molecules at the European XFEL Igor Zagorodnov S2E Meeting DESY 10. February 2014.
Mathe III Lecture 2 Mathe III Lecture 2. 2 _____________________________________ Montag 8.00 – 9.30 Uhr – HS H Montag Uhr – HS H Mittwoch.
BIOLOGY AUGUST 2013 OPENING ASSIGNMENTS. AUGUST 7, 2013  Question goes here!
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
We are learning how to read the 24 hour clock
1..
CMPT 275 Software Engineering
© 2012 National Heart Foundation of Australia. Slide 2.
Research Design- Hypothesis The problem that we are researching is that students do not apply comprehension skills or strategies while reading traditional.
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
Multiply Binomials (ax + b)(cx +d) (ax + by)(cx +dy)
Your 30 second introduction This PowerPoint presentation will guide you thru your 30 second introduction. To move to the next slide, click the enter key,
25 seconds left…...
My Holiday Economic Choices! Using your budget, choose an item to buy for each significant person in your life. Explain any opportunity costs.
Januar MDMDFSSMDMDFSSS
Week 1.
Systems with No Solution or Infinitely Many Solutions
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Bell Schedules Club Time is available from 8:05-8:20  1 st 8:20 – 9:15  2 nd 9:20 – 10:10  3 rd 10:15 – 11:05  4 th 11:10 – 12:50 A(11:10)
Clock will move after 1 minute
Bottoms Up Factoring. Start with the X-box 3-9 Product Sum
PSSA Preparation.
Weekly Attendance by Class w/e 6 th September 2013.
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Page 1 of 30 This process involves authorizing a company to act on behalf of the designated representative for a Crown petroleum and natural gas licence.
IJT Transaction Timelines and Scheduling – NISL and CMSC.
Web Time Entry Hours Entry in ESS 04/26/12 1 Banner.
7x7=.
IDT Prep 02/27/2014. IDT 2/28 Reminders 2/28 IDT Call starts at 7:30 PM, 3.5 hour IDT begins at 8:30 PM IDT Debrief will be sometime between.
IDT Prep 01/24/2014. Announcement IDT 1/21 Preliminary Debrief Presentation on spp.org updated with Regulation Pre-selection data and graphs.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting January 17, 2014.
Integrated Marketplace: Parallel Operations CWG – January 2014.
Preliminary IDT Debrief 02/26/ Deployment Test Debrief Overall the Fourteenth Deployment test was a great success All of the BAs.
Parallel Ops / Go-Live Checkpoint Weekly Update – Friday Meeting December 20, 2013.
Presentation transcript:

IDT Prep 01/20/2014

1/21/14 IDT Reminders 1/21 IDT Call starts at 7:30 AM, 7 hour IDT begins at 8:30 AM –Tieline Drop –Regulation Pre-Selection – RegUp, RegDown, Spin and Supp all submitted as “Market” –EDR Scenario: Applicable MPs are in contact with SPP  This scenario will demonstrate the clearing and dispatch of an EDR resource for all qualified products. –BAAL control will be tested again –TARRFs set at 1 –Ramp Sharing “Off” 2

1/21/14 IDT Reminders webMirroring will continue to be off –EIS and IM Schedules need to be submitted –Please submit dual schedules for all hours of the IDT  HE 0900 through

4

Upcoming IDT Schedule and Conditions 5 IDT DateIDT TimesConditionsNotes 1/21/14 Originally: 3:30P-8:30P 2hr IDT begins at 5:30P Now: 7:30A-4:30P 7hr IDT begins at 8:30A Regulation Pre- selection Tieline Drop SPP loses select tie-line measurements. SPP will simulate the loss of real-time data with significant tie-line data providers. MPs will not need to take any action; this is an internal process for our operators. EDR Testing with specific MPs will occur during this IDT 1/27/14 Originally: 4:30P-10:30P 4hr IDT begins at 5:30P Now: 7:30A-4:30P 7hr IDT begins at 8:30A Tieline Checkout ADI Regulation Pre-selection 2/25/148:30A-12:30P 2hr IDT begins at 9:30A Regulation Pre-selection 2/28/147:00P 4hr IDT begins at 8:00P Cutover for March 1 Go-Live