Maintenance Utilization TECH 58100 Project Measure Phase Chris Gray 10/2/2013.

Slides:



Advertisements
Similar presentations
Name: Date: Understand multiplication as jumps of Independent / Some adult support / A lot of adult support 1) 2) 3) 4) 5) 6) 7) 8) 9) ©
Advertisements

CEN WS/BII The uptake of new technologies and the challenge for standardization ; the case of e-procurement and e-invoice Presentation at the 2 nd Conference.
For DBEs You Are the Message Speaker: Larry Sunday Altorfer.
Meeting Customer Expectations Through Performance Measurement in New Hampshire Christopher D. Clement, Sr. June 10,
MAINTENANCE PLANNING AND SCHEDULING
Best Fleet Practices Award Winning Tips General Services Conference April
Monarch Park Collegiate The Future Shop Co-op Education Placement Presented by Jia Di & Andrei.
Maintenance Utilization TECH Project Champion/Define Phase Chris Gray 10/2/2013.
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
 Crashes at rural STOP controlled Intersections  Primary cause where drivers stopped before entering:
A Strategic Overview James Cawley / Pat Palmer Use of Resources.
Maintenance Utilization TECH Project Analyze Phase Chris Gray 11/14/2013.
BSAD 102 Mike’s Bikes Business Simulation
Quality Function Deployment
Phase Difference = Phase Difference = 0.05.
ANALYSIS REQUIREMENT ANALYSIS DESIGN IMPLEMENTATION TEST.
NEED EQUIPMENT SERVICE?. What is CFESA? The Commercial Food Equipment Service Association is the trade organization of professional service.
Every student. every classroom. every day. Creating a Service Culture MSDF Impact Assessment.
W. BentzEMBA 8021 Agenda for October 27, 1999 Comments on Copeland Wellesley Paint Co. Case On measuring capacity Standards for Toledo Tool.
Financial Statements Presented by: Leo Ashley Tony David Sungtae.
Data of Agricultural Services Mukesh K.Srivastava FAO.
Top 10 TOP 10 REASONS TO OUTSOURCE STATEMENT PRINTING/MAILING David Yates, VP Sales Southeast Region.
0 CHAPTER 3 Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows © 2009 Cengage Learning.
Systems Engineering Conceptual System Design. Systems Engineering and Analysis, B.S. Blanchard and W. J. Fabrycky, 3 rd edition, Prentice-Hall, 1998.
Re-Engineering and Re-Organisation of the Revenue Management Function Project Overview August 2007.
Making Conservation Work for You Chris Brown Chris Brown Consulting for Office of Rural Community Affairs December 2, 2003.
Value Chain Analysis Group 12 – 3. Primary Activities Analysis Primary Activities Support Activities Support Activities Analysis Primary Activity ☑ Core.
Customer Relationships
Abel Electric Repair Income Statement, CH1, AP2 Jeff Tsui Wilson Chien Annie Huang Sun Yangiu.
1 CHAPTER 4 Audit Evidence and Programs. 2 financial statements financial statement cycles management assertions general audit objectives specific audit.
| Onderstepoort Biological Products © |22nd February 2013Page 63 Regulatory Compliance Revolution.
Water Utility General Overview Revenues Overall Revenue Increase 2.6% Expenditures. Overall Expenditure decrease of 1.3% Reservoirs Supplies 203.6% Hydrant.
Do you Have a Problem For- For-. Techiezoncall.com Techiezoncall.com Offers Online Technical Support To Global Customers, Just
Bitdefender Support Number for Help
MS Office Help Support Toll Free :
Future Rail and Road developments
Process Layout Chapter #6.
Building & Housing Codes
QUICKEN CUSTOMER SERVICE PHONE NUMBER CONTACT US QUICKEN CUSTOMER SERVICE PHONE NUMBER
Three-Phase Lesson Plan Model
Gmail tech 1~ support Number. Gmail Tech Support Number.
Jerry-Ann L. Oluya BEN-32.   Scheduling is to establish the timing of the use of equipment, facilities, and human activities in an organization. The.
Acer Technical Support NZ Number

Quicken Support Phone Number More info :
Thomas MAZOUR IAEA, Div of Nuclear Power/NPES
+61. Avira Tech Avira customer support.
Welcome. Oki data Printer Support( ) Xerox Printer Support.
Customer Support for Hotmail Problems. About Callpcexperts Independent technical support service provider World Class Service Experienced technicians.
Are You having trouble with Any Printer error?.Here is the quick solution for every Errors in Lexmark Printer Tech Support Number to connect.
Are You having trouble with Any Printer error?.Here is the quick solution for every Errors in Lexmark Printer Tech Support Number to connect.
Are You having trouble with Any Printer error?.Here is the quick solution for every Errors in Lexmark Printer Tech Support Number to connect.
Are You having trouble with Any Printer error?.Here is the quick solution for every Errors in Olivetti Printer Tech Support Number to.
Roadrunner Customer Service. About Callpcexperts Independent technical support service provider World Class Service Experienced technicians Quick.
WELCOME T0 CANON PRINTER SUPPORT Helpline Number
Distributed water recycling
Energy Tracking, Monitoring and Reporting
5.08 ASSET MANAGEMENT AND DECISION SUPPORT IN A COST-CUTTING REGIME
HP Printer
Problem Huge amount of old furniture. Utilization of old furniture.

Elevator-Escalator Reliability Failure notification
Seven Utilization Lessons

Used to help design comfortable efficient products
The Basis of Inventory Control
Request Inactive Date The Request Inactive Date signifies the last active date for an equipment request. The Request Inactive Date, which is displayed.
Dial: Setup and Install Epson Printer in Windows.
Public Works 2020 Budget and CIP Review.
We are independent provider of technical support services. All the trademarks, names and logos on this site are the properties of their respective owners and are shown for reference purposes only. We disclaims any association or ownership of such third pa
Presentation transcript:

Maintenance Utilization TECH Project Measure Phase Chris Gray 10/2/2013

Project Review Maintenance organizations must operate as an independent entity within a business. Their focus must be customer service and attention on equipment up-time, equipment availability, timeliness of repairs; along with cost. The opening statement of the business case was reiterated to re-enforce the point of maintenance efficiency and cost reduction. Utilizing your system and resources is essential to providing your customer with timely repairs at a low cost.  Reduced time for general repairs –repairs made <2 weeks  Increased customer satisfaction  Increased maintenance utilization –measure total work orders completed – necessary measurement since no baseline is established.  Reduced maintenance backlog –reduce work order backlog by 50%

SIPOC SupplierInputProcessOutcomeCustomer WO RequestorWork Order - General Work Order Execution Work Completed Requestor WO RequestorWork Order- Safety Work Completed Requestor/Plant WO RequestorWork Order- Emergency Work Completed Requestor

CTQ Tree CustomerCTQKPOVs KPIVs Maint Backlog Levels WORK ORDER REQUESTORWork Orders Completion Time to completion Work Order Execution # of Craft per WO Emergency/Safety WO Increased Maint Personnel Usage Craft Utilization Time

VoC - SWOT STRENGTHS-WEAKNESS-OPPORTUNITIES-THREATS StrengthsOpportunities Experienced Maint. Department Willing to work Higher maintenance utilization rates Work order completion Reduce cost for secondary eq. failures Reduce backlog levels WeaknessThreats New leadership Excessive time to WO completion Excessive number of people per WO Focused on PM work only Departmental power struggle Reluctant to move to full scheduling Decreased moral Crafts not completing backlog work Requestors not putting in work orders

Process Map

Process Observation Worksheet Process Observation Worksheet and Checksheets have been combine for the project. The measure will be the time to completion of the work order and metric the project is setting is work order completion less than 2 weeks from creation. The qualitative data has been combined on one slide and measures work order completion time and if the work order was completed <2 weeks. In collecting data, it was found data must be collected manually. Only work orders with closing notes had a completion date. Therefore, the acceptance criteria was moved to work orders completed <4weeks or within the month. Additionally, data was collected on open work orders and labor utilization.

Process Observation Worksheet/Checksheet Name: Maintenance Utilization Process Observed: Work Order Completion Date: 10/22/13 #Description of Step Work Order Req ApprovalDurationCompletionDurationCompletion <4 Weeks Work Orders: /4/13 05/22/1378No /29/13 04/9/1310yes /11/13 010/1/13170No /1/13 08/1/1390No /2/13 05/30/1328Yes /7/13 05/21/1314Yes /20/13 06/17/1327Yes /21/13 06/28/1337No /28/13 0 0Yes /30/13 06/20/1320Yes /5/13 0 0Yes /14/13 06/25/1311Yes /17/13 06/25/138Yes /8/13 09/12/1364No /24/13 010/17/1383No

Additional Information Backlog Information  Present Work Order Backlog 450+  Oldest Work Order Created 8/09 (Still Open)  10/1/13 to 10/21/13 – Created 238 work orders – 133 still open/105 closed Maintenance Utilization  Found accounting for # of maintenance personnel per work order is not tracked on work orders – no data

Spaghetti Diagram Spaghetti Diagram is not essential in this project. The work order is generated electronically and delivered to maintenance personnel electronically. The only step in the work order process which is critical the execution step. Based on the data presented in the checksheet slide, the work orders are created and approved on the same day. Looking deeper, the work orders are normally created by the Operations or Maintenance Lead and approved at the same time. This puts the work order in a pseudo “awaiting execution” step until the maintenance craft completes the work order. Based on the data presented the spaghetti diagram would not present any value since it is mapping the actual steps and distance of the work order flow path.

Data Collection Plan Data collection was changed from reviewing every work order’s creation date versus completion date, to creation date versus completion within the specified month. Basically, the work order system does not list a completion date on the actual work order. The work order is marked as completed in the system once the work is done, however there is no way to know what the actual date of the completion. Therefore, using database search criteria of “created” for a specific month versus “closed” will show if the work order was completed within 30 days of creation. This will be a follow up item with the System Architect to get the dates included. Additionally, maintenance will be required to add completion notes to all work orders.

Data Collection Cont…

Graphic Representation of Data Collected

Graphical Analysis  Data shows average months completion at 80% - therefore 20% of the work orders generated will not be completed within a 30 day period.  This data is a subjective due to no completion date being posted on the work orders  July showed an increase in work orders created and completed, while work orders not completed within 30 days decreased compared to the other months.  The number of work orders not completed within 30 days increases starting in January and decreases in July.  Production personnel explained the peak business season is December through July. This explains the amount of work orders completed and the decreased in work orders greater than 30 days. July had decreased production demands with high employee head count.