“Duty to Manage” Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd.

Slides:



Advertisements
Similar presentations
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Session 2 - Clients Version: September 07.
Advertisements

Work at Height Regulations 2005
Health and Safety Executive Health and Safety Executive Review of Approved Codes of Practice Janice Martin DERMATITIS – and you!
Duty to Manage Asbestos (an Inspectors View) David Price HM Inspector of H&S HSE Birmingham Office.
Background Presenters Work done in preparation for WHS changes
Construction (Design and Management) Regulations 2007
Asbestos Update Introduction Update on latest statistics HSE Awareness Campaign Target Audience Changes for 2009 MDHS100 Revisions Social Housing.
Steve May A H Allen Limited Asbestos: A Breath of Fresh Air?
H&S Asbestos Regulations the Basics Phil Bloomer MSc BSc PGCE Phil Bloomer MSc BSc PGCE Internal Training Manager Internal Training Manager.
Construction (Design and Management) Regulations (NI) 2007 A Client’s Perspective Pat Hannaway CMIOSH MCIWEM MIWO I.Eng.
HAZARD COMMUNICATIONS / E N V I R O N H & S T R A I N I N G P R O G R A M HAZARD COMMUNICATION PROGRAM OSHA Standard 29 CFR The OSHA hazard communication.
HSE CHANGES 2013 RATIONAL Reduction of Government Department budget.
Asbestos Legislation Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd.
W504 Risk assessment of asbestos containing materials.
Construction (Design & Management) Regulations 2007 Jim Armstrong MCIAT, RMaPS LINDUM CONSTRUCTION FOOD CONSTRUCTION SEMINAR.
CDM Regulations – 2015 Are you prepared?. Contents  Introduction and Background  Changes to 2007 Regulations  Notifiable or Not?  Roles / Duties 
By Danielle.  The provision and use of work equipment regulations was first introduced in 1992 but was replaced by a more update version in The.
Dr Zoe Robinson, Keele University, Greening Business: An online teaching resource.
Health and safety at work
NEBOSH Summary of Frequently Used Regulations in the Certificate. By
Registered in England No VAT No
Background In 2003 / 2004, the Health and Safety Executive (HSE) conducted a review of the Health and Safety (First- Aid) Regulations This was aimed.
ESSENTIAL SAFETY MEARURES IN BUILDINGS PRESENTED BY: BRUCE HOWIE.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
Asbestos: a few things that you might not have heard and some that you may already know a few things that you might not have heard and some that you may.
1 CS38010 Professional Issues Health and Safety at Work.
AsbestaPLAN 1 PRODUCT OVERVIEW.
RECORD KEEPING. AIMS OF THE TRAINING GUIDE This training guide explains:- Why we keep records Our responsibilities What records do we need to keep Penalties.
Health & Safety Risk Assessments.
Asbestos Management Retail Sector Forum 11 th March 2004.
W504 - Management of asbestos containing materials.
Managing The Risk Solutions and Options Available Utilising Technology By Mohammed Zulfiquar Chief Executive Officer Blue Datum Ltd.
1 Dr. Sean Mahar. 2 Aims and objectives of the event Aim: to provide detailed information and guidance about the introduction of a new duty to manage.
BAXI HEATING UK. Aims and objectives of the event Aim: to provide detailed information and guidance about the duty to manage asbestos in non-domestic.
April 2006 Managing Health & Safety Kevin Burniston Lisa McCaulder.
ASBESTOS RISK MANAGEMENT. u Asbestos. u The health risk. u In buildings. u Background to regulation. u Outline of duty to manage. u Review of consultation.
Legionella Risk Assessment Mike Rose. Legionella Risk Assessment Identification and evaluation of sources of potential risk Means by which exposure is.
Asbestos Legal requirements in Jersey Colin Myers Director of Health and Safety.
Blue Skies Delaware; Clean Air for Life Confidentiality Delaware Department of Natural Resources and Environmental Control Air Quality Management Section.
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
Produced 27/06/05 Seeing the Future First Tom Welland Fire Services Manager.
Childcare Development Team Welfare Requirements Update.
Chapter 3 資訊安全管理系統. 4.1 General Requirements Develop, implement, maintain and continually improve a documented ISMS Process based on PDCA.
1 HEALTH & SAFETY FIRE SAFETY SATUTORY RESPONSIBILTIES FOR MANAGERS.
HEALTH AND SAFETY IN THE HOME POLICY JULY HEALTH AND SAFETY AT HOME POLICY Why do we have this Policy? In order to make sure our properties are.
Risk Assessment At the end of this session you should be able to: Define is risk assessment Identify how to assess risks in the workplace Identify hazards.
CDM 2007 Mike Lewis 6 th February New Construction (Design and Management) Regulations Revisions to the Construction (Design and Management) (CDM)
Health & Safety Awareness - The basics. Sharon Currie Robert Fisher HWL Advisers (OH&S)
Survey & Certification Issues Judith Kari & Glenda Payne.
A guide to... Safe Systems of Work.
Health and Safety Executive Health and Safety Executive CDM 2007 Training Package Competence & training Version: September 2007.
Agenda  Safety Management in Roads Service  A review of the roles within CDM  What are the construction regulations?  What's in a H&S plan?  CDM and.
Capital Insight Pty Ltd ABN SYDNEY MELBOURNE BRISBANE Capital Insight Conference December 2007.
Asbestos: a few things that you might not have heard and some that you may already know a few things that you might not have heard and some that you may.
HCPC Registration for Biomedical Scientists
Health and Safety Executive Health and Safety Executive MANAGING CONTRACTORS Alec Ferguson HSE.
January 2015 NAT WOODSIDE.
Every employer must ensure, as far as is reasonable practicable, the health, safety and welfare of all his employees More specifically, employers must.
GREATER MANCHESTER FIRE AND RESCUE SERVICE The Fire Safety Order 2005 John O’Leary B.Eng (Hons) FIFireE Head of Risk Reduction.
On completion of the scenario, students will be able to: Learning Outcomes 1 Critically analyse and prioritise information security risks. 2 Systematically.
Sara Mason ABP Associates Limited
Temporary Works Co-ordination
Control of Asbestos Regulations 2012 & Surveys
ComPliance Essentials LTD
Asbestos Awareness Bradford Area Occupational Health and Safety Forum
Safe Systems of Work.
Health and Safety According to Keith Robinson
Definitions Hazard- the potential of a substance, activity or process to cause harm. They can take many forms such as chemicals, electricity or the use.
Investment Forum Regulatory Update Round
Effective Construction Safety Management
Presentation transcript:

“Duty to Manage” Steve Shutler BSc(Hons), MCIEH, CMIOSH, CCP(Asbestos) Director SB Asbestos Management Ltd

Duty to Manage Making sure that no one comes to any harm from asbestos while on your premises Occupants Occupants Maintenance and Trades Persons Maintenance and Trades Persons Public at Large Public at Large

The Requirement to “Manage” The Legal Framework The Control of Asbestos Regulations 2012The Control of Asbestos Regulations 2012 HSE “ACoP” – L143 (Second Edition)HSE “ACoP” – L143 (Second Edition) Two HSE “Guidance” PublicationsTwo HSE “Guidance” Publications A “Short” Guide - INDG 223 (Rev 3) A “Short” Guide - INDG 223 (Rev 3) A “Comprehensive” Guide - HSG 227 A “Comprehensive” Guide - HSG 227

L143

HSG 227

The Duty Holder Reg 4(1) (a) Contractually responsible for maintenance or repair (b) Control of the premises or means of access / egress

Regulation 4- Summary (a) Reasonable steps to find ACMs and check condition (b) Presume materials contain asbestos – unless strong evidence to suppose they do not (c) Make a written record of locations and keep record up to date (d) Assess risk of anyone being exposed (e) Prepare a written plan to manage the risk …>>>>> ACoP Para 112 ACoP Para 112

Written Plan …to ensure:  ACMS / Presumed ACMS are kept in a good state of repair  Repaired and protected if vulnerable to damage – or removed  Information on location and condition given to anyone liable to disturb the ACM or is otherwise at risk

Regulation 4- Summary (a) Reasonable steps to find ACMs and check condition (b) Presume materials contain asbestos – unless strong evidence to suppose they do not (c) Make a written record of locations and keep record up to date (d) Assess risk of anyone being exposed (e) Prepare a plan to manage the risk

Using the Guide Green boxes Clients/Dutyholders Blue boxes Surveyors

Managing Asbestos -Appointed Person (14) Duty holder to identify a person responsible for managing asbestos – clear lines of responsibility Duty holder to identify a person responsible for managing asbestos – clear lines of responsibility Resources, skills, training, authority Resources, skills, training, authority Essential if large/complex portfolio Essential if large/complex portfolio

Surveyors 1.Training, qualifications and knowledge 2.Knowledge specific to task 3.Independent, impartial, integrity 4.QM system 5.Surveys to approved standard – ie HSG Recommends Accredited/Certificated Surveyor

Part 3 – Asbestos Surveys

Survey Types 1Presumptive 2Sampling 3Full Access

Survey Types 1Management Survey 2Refurb/Demo Survey

Presumption NON ASBESTOS Non asbestos in original specNon asbestos in original spec Very unlikely eg wallpaperVery unlikely eg wallpaper Post 1985 amphibole ACMPost 1985 amphibole ACM Post 1990 “Artex”Post 1990 “Artex”

Management Surveys Survey AFARP Survey AFARP Normal occupancy and foreseeable maintenance Normal occupancy and foreseeable maintenance Minor intrusive work Minor intrusive work Includes “Material Risk Assessment” Includes “Material Risk Assessment”

Refurb/Demo Surveys Refurb/Demo Surveys Includes difficult to reach areas Includes difficult to reach areas Aggressive so appropriate precautions Aggressive so appropriate precautions May need post survey certification May need post survey certification

Duty Holder’s Responsibilities Check accuracy of report Check accuracy of report Produce the AMP Produce the AMP Keep things updated Keep things updated Make the information available Make the information available

LocationProduct Type Extent M² AccessibilityExtent of Damage Surface Treatment Asbestos Type Sampled/ Presumed/ Strongly Presumed Sample no. Material Assessment Score Priority Assessment Score Total Risk Score Unit 6 (MDL Workshop) all electrical switchgear, woven flash guards Woven Asbestos<10DifficultGoodSealedChrysotileSPSP1437 Unit 3 (Chandlery), exterior gable end above front entrance, corrugated cement sheets AC50+DifficultGoodSealedChrysotileS1577/07314 Unit 4 (Hayling sea school), exterior gable end, corrugated cement sheets AC50+DifficultGoodSealedChrysotileSPSP2314 Units 14, 13 and 10, exterior roof, cement sheets AC50+DifficultLowUnsealedChrysotileS1577/09415 Unit 10 (H.G.F.R), workshop roof, roof and gable ends, cement sheets AC50+DifficultLowUnsealedChrysotileS1577/ Unit 9 (The Contemporary home), warehouse, roof and wall, corrugated cement sheets AC50+DifficultLowUnsealedChrysotileSPSP34711 Unit 16A (ex – Piranha ribs), main office floor, floor tiles Asbestos Thermoplastic Floor Tile 50+DifficultGoodCompositeChrysotileS1577/12235

Regulation 4- Summary (a) Reasonable steps to find ACMs and check condition (b) Presume materials contain asbestos – unless strong evidence to suppose they do not (c) Make a written record of locations and keep record up to date (d) Assess risk of anyone being exposed (e) Prepare a plan to manage the risk

Assessment Assessment Material assessment - Ability to release airborne fibresMaterial assessment - Ability to release airborne fibres Priority assessment - Human risk factors – Potential for people to be exposedPriority assessment - Human risk factors – Potential for people to be exposed

Material Assessment Product type Extent of damage or deterioration Surface treatment (if any) Asbestos type

Score between 2 & high potential10 + high potential 7-9medium potential7-9medium potential 5-6low potential5-6low potential <4very low potential<4very low potential Material Assessment

Priority Assessment Normal occupant activity Likelihood of disturbance (location: accessibility: extent/amount) Human exposure potential (number of occupants: frequency of use: average time area in use) Maintenance activity (type of maintenance: frequency) ©

LocationProduct Type Extent M² AccessibilityExtent of Damage Surface Treatment Asbestos Type Sampled/ Presumed/ Strongly Presumed Sample no. Material Assessment Score Priority Assessment Score Total Risk Score Unit 6 (MDL Workshop) all electrical switchgear, woven flash guards Woven Asbestos<10DifficultGoodSealedChrysotileSPSP1437 Unit 3 (Chandlery), exterior gable end above front entrance, corrugated cement sheets AC50+DifficultGoodSealedChrysotileS1577/07314 Unit 4 (Hayling sea school), exterior gable end, corrugated cement sheets AC50+DifficultGoodSealedChrysotileSPSP2314 Units 14, 13 and 10, exterior roof, cement sheets AC50+DifficultLowUnsealedChrysotileS1577/09415 Unit 10 (H.G.F.R), workshop roof, roof and gable ends, cement sheets AC50+DifficultLowUnsealedChrysotileS1577/ Unit 9 (The Contemporary home), warehouse, roof and wall, corrugated cement sheets AC50+DifficultLowUnsealedChrysotileSPSP34711 Unit 16A (ex – Piranha ribs), main office floor, floor tiles Asbestos Thermoplastic Floor Tile 50+DifficultGoodCompositeChrysotileS1577/12235

Potential Risk Bands 1.High Medium 12 – 17 3.Low 11 – 5 4. V Low < 4

High Potential Risk 1)Complete removal.1)Complete removal. 2)Encapsulation, sealing or other protection including marking with appropriate warning labels.2)Encapsulation, sealing or other protection including marking with appropriate warning labels. 3) Decontamination works.3) Decontamination works. 4) Close monitoring of condition and potential for persons to be exposed to airborne asbestos fibres. (This may involve air sampling adjacent to the material to determine whether airborne asbestos fibres are being released).4) Close monitoring of condition and potential for persons to be exposed to airborne asbestos fibres. (This may involve air sampling adjacent to the material to determine whether airborne asbestos fibres are being released).

Medium Potential Risk The condition of any material in the 'medium' category requires regular monitoring and a programme of encapsulation or removal may well be appropriate in the medium to long term.The condition of any material in the 'medium' category requires regular monitoring and a programme of encapsulation or removal may well be appropriate in the medium to long term.

Low Potential Risk 'Low' risk category materials are generally not considered to cause any immediate concern and are unlikely to present any significant risk under reasonably foreseeable circumstances. Periodic condition monitoring is however advisable.'Low' risk category materials are generally not considered to cause any immediate concern and are unlikely to present any significant risk under reasonably foreseeable circumstances. Periodic condition monitoring is however advisable.

Very Low Potential Risk 'Very Low' risk category materials are generally of a cement, resin or plastic based material and are not considered to cause any immediate concern, as these are unlikely to present any significant risk under reasonably foreseeable circumstances. Periodic condition monitoring is however advisable'Very Low' risk category materials are generally of a cement, resin or plastic based material and are not considered to cause any immediate concern, as these are unlikely to present any significant risk under reasonably foreseeable circumstances. Periodic condition monitoring is however advisable

Example Assessments

Regulation 4- Summary (a) Reasonable steps to find ACMs and check condition (b) Presume materials contain asbestos – unless strong evidence to suppose they do not (c) Make a written record of locations and keep record up to date (d) Assess risk of anyone being exposed (e) Prepare a plan to manage the risk

Making The Management Plan “ The management plan should set out how the risks identified from asbestos will be managed. Details should include:” ACoP para 129 ACoP para 129

Details (ACoP) Identify persons responsible for managing the riskIdentify persons responsible for managing the risk Asbestos register informationAsbestos register information Instruction that work on the fabric of the building cannot start without first checking the register – including the proceduresInstruction that work on the fabric of the building cannot start without first checking the register – including the procedures Work identified from the risk assessments (repairs, protection, removal)Work identified from the risk assessments (repairs, protection, removal) Condition monitoring scheduleCondition monitoring schedule Communication arrangements for the planCommunication arrangements for the plan Contingency arrangements if responsible person unavailableContingency arrangements if responsible person unavailable

Actioning The Management Plan (ACoP) Actioning The Management Plan (ACoP) Dutyholder should ensure that the plan is implementedDutyholder should ensure that the plan is implemented Prioritise actions with high priority for damaged / potential disturbancePrioritise actions with high priority for damaged / potential disturbance Obtain specialist advice if necessaryObtain specialist advice if necessary Procedures & responsibilities to ensure information is shareProcedures & responsibilities to ensure information is share Available on site and kept up to dateAvailable on site and kept up to date Work should only start when the dutyholder is sure information is known and understood and that the information is easily accessibleWork should only start when the dutyholder is sure information is known and understood and that the information is easily accessible

Management Plan Details (HSG 227) Asbestos materials record systemAsbestos materials record system Priority assessment methodologyPriority assessment methodology Rationale for management optionsRationale for management options ACM condition monitoring arrangementsACM condition monitoring arrangements Training arrangements for employees and contractorsTraining arrangements for employees and contractors Mechanism to pass information on asbestos to contractors and othersMechanism to pass information on asbestos to contractors and others Employees and their responsibilitiesEmployees and their responsibilities Authorisations to amend the planAuthorisations to amend the plan Monitoring and review proceduresMonitoring and review procedures Timetables for each area aboveTimetables for each area above

Review and Updating (ACoP) Minimum 12 monthly review and if circumstances changeMinimum 12 monthly review and if circumstances change ACMs inspected and assessed “periodically”ACMs inspected and assessed “periodically” location location condition condition occupancy occupancy instances of failures instances of failures Periodic checks (audits)Periodic checks (audits) Communication – including to emergency servicesCommunication – including to emergency services

Bernard Coulombe, the President of Jeffery Mine Inc. “We have 200 million tonnes of proven ore reserves. It's good for the next 50 years,”