EMU Chambers Production Supervision FNAL Supervision Line Manag. Infor. Flow G. Apollinari N. Chester L1-L2 Managers Chamber L3 Manag. Glenn Smith.

Slides:



Advertisements
Similar presentations
THAI TOKO ENGINEERING CO.,LTD.
Advertisements

11.5 Lines and Planes in Space For an animation of this topic visit:
Turn-key project Key-Personnel Organisation chart
REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) GRID CODE 3 rd Athens Forum October 24&25 Philippe RUSSE (EDF) Christian LAUNAY (EDF)33.
Econ 206(A) Tutorial 4 Theory of the Firm: Production.
Where do you go from here? There are many opportunities awaiting you – but it is all up to you! There are many opportunities awaiting you – but it is all.
Complete RPP Registration Form Approve Request to place on RPP Review Procurement Approach / Risk Accounting Officer Procurement Board Review Allocate.
Fermilab and the CMS Author List Patricia McBride Fermilab PAC meeting October 16, 2012.
1. PROCEDURE MERGE SORT (list, first, last) If (first < last) middle = (first + last) div 2 2. Merge Sort (list, first, middle) 3. Merge Sort (list, middle+1,
National Engineering Month 2009 Engineering Idol Heat Recovery Ventilators Professional Engineers Ontario Etobicoke Chapter.
Developments in the Organisational Structures of Banking and Financial Market Supervision: Aligning Organisational Solutions with the Countrys Needs National.
Capacity-building Needs in Strengthening Thai Financial System Dr. Tarisa Watanagase Deputy Governor, Financial Institutions Stability.
REDESIGNED NETWORK FOR FIRST CLASS MAIL. Duty of Managers/Assistant Superintendents/Head Sorting assistants/Supervisors at Mail Offices/First Class sorting.
Regulering av utdanning TRT. Regulation of health professions Ministry of Education and Research Ministry of Health and Care Services The Norwegian.
ESKİŞEHİR ELECTRICIANS CHAMBER. Our Chamber is established in 1954.
Proposal for HQ Coil 27 Miao Yu, Steve Krave. What to do with the coil Laser sintering end parts with accordion slits Plasma coating these end parts Demonstrate.
HIGH LEVEL PERSPECTIVE ASSESSING CEIOPS’ PROGRESS SO FAR AND IDENTIFYING FUTURE CHALLENGES IN CONJUNCTION WITH THE ASSESSMENT OF THE LAMFALUSSY MODEL Carlos.
Agenda Aug.2,2001 Chaired by Nelson Chester Welcome & Introduction Weiguo Li 10:00-10:10 CSC Management &Tooling Chunhua Jiang 10:10-10:40 Coffee Break.
US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
DVA-1 Project Management Proposal Chris Langley, NRAO 1 US SKA Consortium Meeting - DVA-1 Project Management Proposal June 3-4, 2010.
Link Board Upscope Frascati group Napoli group Warsaw group.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
Nick Hadley CMS Cosmic Slice Test Maryland DOE Review August 30, 2005.
US CMS Silicon Tracker – PAC Meeting – FNAL - Nov 3, Incandela 1 US CMS Tracker Outer Barrel (TOB) Silicon Project Joe Incandela Fermilab Level.
Company Profile.
Government of Tanzania/DFID Partnership Capacity Building.
1 Governing Board Bond Approvals April 25, 2013 Michael E Finn.
The evaluation of research units at HCERES
NoVA FNAL Engineering Needs 9 February 2009 Dave Pushka.
SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.
1 Black Hills Corporation Electric Utility Services Vice President Utility Services Last Updated President & COO Utilities Chairman, President.
1 COST ESTIMATING. 2 Time Data Cost Data Performance Data Procurement Data Owner special Data Brainstorming Process Company Needs Market Research. Feasibility.
Training Program Goals and Objectives
Collaborative Drafting Table Engineering/Design/Manufacturing Powered by Groove New Project Drawing Data Groove Clients Airline Technical Customer Representatives.
 Build a Bridge?  Make a Robot?  Work on a Computer?  Drive a Train?  Repair Car Engines?
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
Fermilab Annual DOE Program Review May 16-18, 2005 JF1 CMS M&O at FNAL Jim Freeman US CMS M&O Manager May 17, 2006.
Aug. 22, 2007 CF7S Americas EDR Kick-Off A&E Selection the Fermi Process Tom Lackowski.
11/05/2000Wire Chamber Working Group Visit to Fermilab Participants: –Giulio Auriemma, Thomas Schneider, Burkhard Schmidt General Remarks: –Visit was organized.
1 LHC-DFBX Fabrication Oversight Plan Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab.
Micromegas NSW issues Tasks list. Scope  Preparation of New Small Wheel project  Set up task sharing => proto-Collaboration (MoU)  Project leader &
Kaori Maeshima (FNAL), Alignment Workshop at CERN: May 17-18, Endcap Alignment Status of Offline Software Alignment CERN 17, 18 May 2001.
Copyright of Transcend Technical and Engineering Services (P) Ltd. ARCHITECTURAL DOCUMENTATION PORTFOLIO.
CMS Upgrade Workshop, FNAL, Nov 19-21, O.Prokofiev CMS Upgrade Workshop Updated ME4/2 chamber construction costs and prototype Status and plans.
1 You as the Supervisor and Coach Module 2 National Guard Technician Personnel Management Course.
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
W. Smith, U. Wisconsin, Upgrade MB, Sept. 9, 2011 Proposal Reviews - 1 Upgrade Peer Review Report Wesley H. Smith U. Wisconsin CMS Upgrade Peer Review.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
Production CM QA/QC Plans and Systems Production Cryomodule Final Design Review Jamie Blowers 12-May-2015.
5.1 5 Geometry for Drafting Chapter Objectives Identify geometric shapes and constructions used by drafters. Construct various geometric shapes. Solve.
Fermi Site Office Assessment of Fermilab Welding Quality Assurance June 20-24, 2016.
Internet Explorer Connection Error Tech Support Number
REUs: Technical Issues and Funding Sources
Accelerator Operations Department Readiness (Part 2)
Technical Drawing.
Science, Technology, Engineering and Mathematics
Services Group Manager SMG3 Corporate Asset Services Group Manager
Enterprise Content Management Owners Representative Contract Approval
QuickBooks Technical Support QuickBoosk Tech Support You Can Also Visit.
Job Oriented Courses after Electrical Engineering Job Oriented Courses after Electrical Engineering.
SUSTAINABLE ENERGY INDUSTRY DEVELOPMENT PROJECT (SEIDP)
Solar Design and Drafting Training Hyderabad Solar Design and Drafting Training Hyderabad.
SG4a Project Timeline Interest Group ‘a’ Activities Aug 03
Preliminary Project Execution Plan
Mechanical Drafting Unit 1
Key Management Processes
Outsourcing for the BGC
Presentation transcript:

EMU Chambers Production Supervision FNAL Supervision Line Manag. Infor. Flow G. Apollinari N. Chester L1-L2 Managers Chamber L3 Manag. Glenn Smith MP9 Supervisor TD Technicians FNAL Technical Advisor Physicists On-site Physicists Technical Board Site Managers J. Korinek Lab8 Supervisor PPD Technicians EMU Activities FNAL - PPD Technical Personnel FNAL - PPD Scientific Personnel FNAL - TD Factory Management FNAL - TD Technical Personnel Outside Institution Scientific Personnel B.Jones Electrical Group M. Crisler Tech. Infor. Flow Draft Aug

EMU Chambers Production Commitment Authorization PO Proposal G. Apollinari N. Chester >100 k$ Glenn Smith MP9 Supervisor TD Procurement J. Korinek Lab8 Supervisor Commitment Authorization PO Proposals L2-L3 Managers Outside Institutions On-site Physicists L1 Managers k$ < 10 k$

EMU Chambers Production Drawings Approval G. Apollinari N. Chester Drawing Approval Drawings Proposals L2-L3 Managers Technical Coord. Integration Engineer CMS Tech. Manag. TD Drafting and Engineers