NCHRP 20-07 Task 254 Project Vehicle Size & Weight Management Technology Transfer/Best Practices.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Strategy for the development of an African Science and Technology Policy framework By Dr. Abdul-Hakim Rajab Elwaer Director of HRST AUC AFRICAN UNION.
Work Plan Development Guidelines and Schedule.
Work Plan Development Guidelines and Schedule.
1 Looking at the TPBs Draft Participation Plan Presentation to the Transportation Planning Board July 18, 2007 Sarah Crawford Transportation Planner Department.
Mississippi Special Education Advisory Panel Annual Report to the State Board of Education July 2009.
World Meteorological Organization Working together in weather, climate and water Fellowships Nomination and Selection procedures Presented at the 18th.
Implementation Council Meeting Structure and Resources Background: The Implementation Council (Council) roles and responsibilities are described in the.
TPB Human Service Transportation Coordination Program 1 Key Elements of the Update to the Coordinated Human Service Transportation Plan Human Service Transportation.
TINA G. BUTCHER NATIONAL INSTITUTE OF STANDARDS & TECHNOLOGY (NIST) WEIGHTS & MEASURES DIVISION (WMD) SEPTEMBER 2011 TALKING FREIGHT SEMINAR Developing.
Federal Highway Administration Size and Weight Technologies ITS America Conference - May 2006 Session #35 Office of Freight Management and Operations Mike.
PSRC’s Project Selection Process February 6,
INTEGRATION OF WEIGH-IN-MOTION TECHNOLOGY INTO NIST’S HANDBOOK 44 Webinar: Talking Freight September 21, 2011 Dan Middleton Texas Transportation Institute.
Designated by US DOT Publication of Draft PFN for Comments - Spring 2013 Initial Designation of the PFN – Fall 2013 National Freight Network Primary Freight.
“RAC 101” An Introduction to the AASHTO Research Advisory Committee 26 July 2010.
Empowering Staff Through Institute Planning (ESTIP) Executive Workshop Institute Name: XXXXXX Presenter: XXXXXX Date: XXXXXX.
Orientation to the Accreditation Internal Evaluation (Self-Study) Flex Activity March 1, 2012 Lassen Community College.
Presented to presented by Cambridge Systematics, Inc. Transportation leadership you can trust. Freight and Land Use New FHWA Handbook and Workshops FHWA.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Presented to presented by Truck Size and Weight Wisconsin’s Legislative Process AASHTO Subcommittee on Highway Transport 2013 July 10 th Wilmington, NC.
Best Practices Related to Research Problem Identification, Scoping, and Programming: A Researcher’s View Martin Pietrucha, Director The Thomas D. Larson.
PILOT PROJECT: External audit of quality assurance system on HEIs Agency for Science and Higher Education Zagreb, October 2007.
CAPACITY DEVELOPMENT for the CLEAN DEVELOPMENT MECHANISM for CAMBODIA (CD4CDM-CAM) National Workshop on Capacity Development for the Clean Development.
Robert M. Worley II Director, Education Service VETERANS BENEFITS ADMINISTRATION Department of Veterans Affairs 2013 CCME Annual Symposium February 26,
Sub-regional Workshop for GEF Focal Points Eastern and Southern Africa Sandton, South Africa, 3-4 November 2010 Sub-Regional Workshop for GEF Focal Points.
Mid-States Highway-Rail Grade Crossing Safety Conference Guan Xu, P.E. Federal Highway Administration Office of Safety Design.
WVDOT/MPO/FHWA Transportation Planning Conference WVDOT Traffic Data Collection, Processing and Analysis Handbook Presented to September 16, 2015 Presented.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
FUNDING A PROJECT STEPS IN DEVELOPING A PROPOSAL.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
AASHTO SCOHTS SUB COMMITTEE ON SAFETY MANAGEMENT STATUS UPDATE APRIL 29, 2009 Chicago, Illinois.
Matthew Udenenwu Waste Permits Division 2015 TCEQ Environmental Trade Fair.
Manage by Measure: Just Do It AASHTO SCOPM Annual Meeting October 23, 2009 Steve Simmons TxDOT Deputy Executive Director.
Transportation Research Board National Cooperative Research Programs RAC 101 July 26, 2010 Kansas City.
MD Digital Government Summit, June 26, Maryland Project Management Oversight & System Development Life Cycle (SDLC) Robert Krauss MD Digital Government.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1 Briefing on Draft Safety Element for the 2007 CLRP Michael J. Farrell Andrew J. Meese, AICP COG/TPB Staff TPB Technical Committee November 2, 2007 Item.
NIHB 2015 Annual Consumer Conference Native Health 2015: Policy, Advocacy and the Business of Medicine Wednesday, September 23, 2015 Kim Russell, Executive.
Towards Zero Deaths: A National Strategy on Highway Safety Tony Kane Director, Engineering and Technical Services AASHTO Strategic Highway Safety Plan.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
TRB SAFETY ACTIVITIES TRB SAFETY ACTIVITIES A BRIEF SUMMARY.
Working Smart for the Customer’s Benefit Pam Hutton AASHTO SHRP2 Implementation Manager June 11, 2013.
TRB SAFETY ACTIVITIES TRB SAFETY ACTIVITIES A BRIEF SUMMARY.
A Strategic Plan for Pavement Engineering NCHRP 20-7(223) AASHTO Joint Technical Committee on Pavements Dan Dawood, P.E. Pennsylvania Department of Transportation.
Reusable Launch Vehicle Working Group Commercial Space Transportation Advisory Committee Presented to COMSTAC Meeting George Whitesides, RLVWG Chairman.
TRB’s Cooperative Research Programs Crawford Jencks Manager, National Cooperative Highway Research Program ECTRI/TRB International Research.
NCHRP National Cooperative Highway Research Program Project 20-07: Research for AASHTO Standing Committee on Highways.
Development of Guide Developed through two Cooperative Research Program (NCHRP and TCRP) projects over the past several years. Resulting research report.
NSDI Strategic Plan Update National Geospatial Advisory Committee Meeting December 11, 2013.
NSDI Strategic Plan Update January 14, NSDI Strategic Plan High-level Timeline 2 Timeframe Activity Dec - Feb Project Start-up – COMPLETED Feb -
Gordon State College Office of Institutional Effectiveness Faculty Meeting August 5, 2015.
1 Community-Based Care Readiness Assessment and Peer Review Overview Department of Children and Families And Florida Mental Health Institute.
NSDI Strategic Plan Update August NSDI Strategic Plan – Purpose/Scope Purpose: Develop a concise, updated strategic plan to guide the Federal government’s.
IRP Update IFTA 2006 Annual Business Meeting Las Vegas, NV Dave Saddler Presented by: Dave Saddler Executive Director IRP, Inc.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Greta Smith, P.E. Associate Program Director, Project Delivery AASHTO Subcommittee on Design June 5, 2013.
Middle Fork Project Relicensing Process Plan April 25, 2006.
For Presentation at 28 th APEC Transportation Working Group Meeting Vancouver, Canada Walter Kulyk Director, Office of Mobility Innovation Federal Transit.
AASHTO CV/AV RESEARCH NCHRP (98) NCHRP
Goals and ObjectivesFeb. 20, 2014 TEXAS FREIGHT MOBILITY PLAN: FACILITATING TEXAS’ ECONOMIC GROWTH AND GLOBAL COMPETIVENESS Regional Freight Advisory Council.
Status Report to the President under EO EPA ACTIONS 1 Executive Order: Improving Chemical Facility Safety & Security.
Principal Investigator ESTCP Selection Meeting
Oversize/Overweight Vehicle Permitting
Principal Investigator ESTCP Selection Meeting
Pilot/Escort Vehicle Operators Training Materials Publications & Federal Highway Administration (FHWA) Update John Berg, FHWA American Association of State.
The TPB’s Draft Participation Plan
Cost of Service Analysis & Rate Design
Overview of the FEPAC Accreditation Process
Accreditation: Working towards the self-study
Presentation transcript:

NCHRP Task 254 Project Vehicle Size & Weight Management Technology Transfer/Best Practices

NCHRP 20-07; Task 254 Project The National Cooperative Highway Research Program (NCHRP) project is designed to support AASHTO’s Subcommittee on Highway Transport (SCOHT) research needs. The SCOHT identifies areas requiring further investigation and/or research and submit requests for funding to NCHRP through the project. Following the 2006 Commercial Vehicle Size and Weight Enforcement in Europe Scan, the SCOHT submitted a proposal, Task 254, for funding the development of informational material targeting State DOT Executives.

NCHRP 20-07; Task 254 Project The goal of this initiative is to:  Identify “best practice” approaches to truck size and weight enforcement identified as part of the Scan;  Include “best practices” currently employed by various States;  Document these approaches and uses of technology;  Make this information available to State DOT Executives and to Enforcement Agency representatives. Task 254 was identified for funding by NCHRP in FFY09. A seven member Panel made, up of five State and two Federal officials, is overseeing the Project work generated under this task.

NCHRP 20-07; Task 254 Project A problem statement was developed and submitted to NCHRP by SCOHT addressing the work needed to be completed. A proposal was received and accepted from Dr. Jodi Carson, Texas Transportation Institute. Dr. Carson served as the Report Writer on the 2006 European Truck S&W Scan. Dr. Carson’s proposal was approved by the Panel and work is underway. Eight work task activities are included under the project; a sixteen month time horizon for completion of the project is scheduled.

NCHRP 20-07; Task 254 Project The eight work tasks, and their status, included in the project are:  Work Task I – Develop a Menu of Supporting Technologies for VSW Management Approach – Information toward State “best practices” in using hardware and software tools for detecting truck size and weight measurements to support enforcement will be identified. Status – completed in July, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task II – Summarize Relevant European VSW Management Policies and Procedures Approach – Using a sufficient level of detail to enhance technology transfer opportunities, summarize and assimilate essential information gained through the 2006 European Scan. Status – Completed in July, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task III – Identify and Summarize Relevant U.S. VSW Management Policies and Procedures. Approach – Research of published literature material and contact with key U.S. points of contact will be summarized and assimilated to support technology transfer throughout the U.S. Status – Completed in August, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task IV – Produce an Interim Report. Approach – An Interim Report presenting the findings generated under Tasks I-III will be prepared including sections on : i. Introduction; ii. Supporting Technologies; iii. Applicable U.S. Functional Areas; and iv. Next Steps Status – The Interim Report was completed at the end of July and distributed to the Panel for review and comments in August, Included in the delivery of the Interim Report are five “Informational Briefs” as an Appendix.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task IV, continued – The “Informational Briefs” included as the Appendix A. to the Interim Report are designed to facilitate vital information sharing. The subjects included in the “Briefs” are: Overview of Commercial Vehicle Size & Weight Enforcement; Weigh-in-Motion System Calibration; Oversize/Overweight Vehicle Permitting, Routing, and Monitoring; Bridge Infrastructure Preservation; Agency-Wide Benefits of CMV Size & Weight Management. Status – Drafts of each of the “Briefs” were distributed to the Panel for review and comment in August, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Task V – Develop US Implementation Process for Comprehensive VSW Management. Approach – Describe the role and requirements for targeted technologies accompanied by: operational activity and capability of each and implications for data management and data sharing. Status – Scheduled for Fall, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task VI – Develop Outreach Material Approach – Using the information developed in Work Tasks I- III and V, prepare the following outreach material: Final Versions of “Informational Briefs” for distribution on:  Various technologies for VSW management;  European and U.S. management policies developed for each “Informational Brief”; and  Recommended comprehensive approach to VSW management for U.S. Modular presentation materials tailored to specific stakeholder groups targeted for presentations. Status – Informational Briefs and Presentation Materials to be finalized by end of September and available for AASHTO Annual Meeting in October, 2008.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task VII – Conduct Outreach Approach – Presentations at large-scale meetings and workshops will be coordinated with AASHTO; presentations at: The Annual AASHTO in October, 2008; The Washington, DC, SCOHT Meeting in February, 2009; and Up to four State-level visits to conduct on-site outreach presentations. Status – The project is on schedule to have the appropriate tools and materials available to for the October, 2008, and February, 2009, meetings, at a minimum.

NCHRP 20-07; Task 254 Project Task 254 Activities (continued)  Work Task VIII – Produce Final Report Approach – Prepare and submit a Final Report that includes copies of the “Informational Briefs” and Presentation Materials. The Final Report will include: Introduction; Supporting Technologies for VSW Management; Relevant European VSW Policies and Procedures; Relevant U.S. VSW Policies and Procedures; Recommended Approach to VSW Management in U.S.; Methods and Results for Outreach Activities; Next Steps. Status – The project is on schedule for delivery of the Final Report in the Summer, 2009.

NCHRP 20-07; Task 254 Project Questions?