S.PopescuAlice DCS workshop, Colmar, 21.06.2004 Follow-up from the last DCS workshop Answers and recommendations.

Slides:



Advertisements
Similar presentations
Inktomi Confidential and Proprietary The Inktomi Climate Lab: An Integrated Environment for Analyzing and Simulating Customer Network Traffic Stephane.
Advertisements

S.PopescuAlice DCS workshop, Colmar, OPCs latest news Iseg OPC server Wiener OPC server.
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
A presentation by Werardt Systemss P Ltd An Online Machine Monitoring System.
PVSS and JCOP Framework Organization, Support & News Oliver Holme IT-CO.
© SICOM AS - Printed © SICOM AS - Printed Key to reducing interface costs Increases the operators ability to implement.
25 July, 2014 Hailiang Mei, TU/e Computer Science, System Architecture and Networking 1 Hailiang Mei Remote Terminal Management.
Security Systems BU Communication Systems Slide 1 DCNtech MPCC IO NServerPC Installing and Operating with Multi PC Control  Windows Set-up.
IPM THEORY CHALLENGE QUIZ NUMBER 3 Unit 3 Outcome 2.
44212: Web-site Development
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 7.2 Interface with Tally.ERP 9 January 2010.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
P.C. Burkimsher Alice DCS Workshop 18 March 2002 (Updated 27 March 2003) PVSS - How to get started Paul Burkimsher IT Division COntrols Group Support Services.
Alarms and interlocks handling in the FSM environment Hypernet 1.The standardization of the FSM state diagram; 2.The FSM error states and their recovering.
ALICE DCS Workshop - 15/3/2004 G. De Cataldo, A.Franco, A.Tauro - INFN Bari - 1 The SY1527 replay delay via the OPC and the ‘SY driver’ (By HMPID) The.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
Electrical distribution for ALICE experiment & Electronic Rack Control S. Philippin.
March 16, 2004Alice controls workshop, S.Popescu Low Voltage and High Voltage OPC status and plans.
S.PopescuAlice DCS workshop, Colmar, Standards for control room PVSS panels A brainstorm meeting.
Experiment Control Systems at the LHC An Overview of the System Architecture An Overview of the System Architecture JCOP Framework Overview JCOP Framework.
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Supervision of Production Computers in ALICE Peter Chochula for the ALICE DCS team.
HV for SM surface testing 2 nd Workshop on the Detector Control System for TRD University of Tsukuba Kengo Watanabe.
Network+ Guide to Networks, Fourth Edition
COMPUTER TERMS PART 1. COOKIE A cookie is a small amount of data generated by a website and saved by your web browser. Its purpose is to remember information.
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
This is the way an organisation distributes the data across its network. It uses different types of networks to communicate the information across it.
Clara Gaspar, November 2012 Experiment Control System LS1 Plans…
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
Section 11.1 Identify customer requirements Recommend appropriate network topologies Gather data about existing equipment and software Section 11.2 Demonstrate.
JAS3 + AIDA LC Simulations Workshop SLAC 19 th May 2003.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
Update on Database Issues Peter Chochula DCS Workshop, June 21, 2004 Colmar.
June 14, 2005 Alice DCS workshop, Utrecht S.Popescu Guidelines and conventions for ALICE PVSSII control software Graphical User Interface Naming and Numbering.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
What’s New in WatchGuard XCS v9.1 Update 1. WatchGuard XCS v9.1 Update 1  Enhancements that improve ease of use New Dashboard items  Mail Summary >
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
André Augustinus OPC news, versions to use on behalf of Sorina Popescu.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
INTRANETS MR ROSS UNIT 3 IT APPLICATIONS. DEFINITION An intranet is an internal, secured environment that has a similar look and feel to the Internet,
JCOP/DCS Plans for HW Upgrade A. Augustinus (ALICE), C
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
All rights reserved, property and © CAD-Computer GmbH & Co.KG 2015 All rights reserved, property and © CAD Computer GmbH & Co.KG 2009.
K.WyllieElectronics meeting 29/05/061 RICH Power Supplies & Grounding Thanks to Johan Morant Paolo Baesso Xavier Le Gouard.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Monitoring and Control using FSMs.
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
GAN: remote operation of accelerator diagnosis systems Matthias Werner, DESY MDI.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
BZUPAGES.COM WEB SERVER PRESENTED TO: SIR AHMAD KAREEM.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
ALICE Offline Week October 4 th 2006 Silvia Arcelli & Chiara Zampolli TOF Online Calibration - Strategy - TOF Detector Algorithm - TOF Preprocessor.
2: Operating Systems Networking for Home & Small Business.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
D. EliaALICE week / DCS workshop - Sept 20, SPD Power Supply System DCS status Domenico Elia INFN Bari.
JCOP Framework and PVSS News ALICE DCS Workshop 14 th March, 2006 Piotr Golonka CERN IT/CO-BE Outline PVSS status Framework: Current status and future.
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
CMS Operational Experience
JCOP Review Closeout March 13, 2003 Chip Watson, Robin Lauckner,
Presentation transcript:

S.PopescuAlice DCS workshop, Colmar, Follow-up from the last DCS workshop Answers and recommendations

S.PopescuAlice DCS workshop, Colmar, Q1:Is there any simulator of the Wiener, Iseg, CAEN? Official releases software(Wiener, Iseg, Caen..) simulating the hardware behaviors do not exist Framework does not support any kind of hardware simulator also There are different users who developed their own simulators, but the correct behavior of the hw is difficult to achieve. The general recommendation is to use the official OPC servers releases, together with the Framework implementation of the devices For local needs one can use the PVSSsim manager to generate different DP values.

S.PopescuAlice DCS workshop, Colmar, Q2: CAEN OPC loosing configuration? Clarification: CAEN OPC does not loose configuration !!! “Device simple configuration” is general to all the devices implemented in Framework So far there is no method to verify the previous configuration This is still a subject of discussions in the FWWG (Framework Working Group) A decision has not been taken yet, as the implementation is not a straightforward one

S.PopescuAlice DCS workshop, Colmar, Q3:Wiener firmware problems(1) Wiener have released several firmware. For PL500(F8)and PL6021(F8) the last release is UEP500(6021)2.12 and CAN 1.04 As mentioned many times the Wiener OPC server 1.6 works very well for this firmware Different users reported the existence of unphysical channels which reside in the current firmware These behaviors should be reported immediately to the Wiener company, as they are the only ones responsible with the firmware upgrades

S.PopescuAlice DCS workshop, Colmar, Q3:Wiener firmware problems(2) Special attention should be given to the correct connection of the CANbus to the 9D-Sub connectors The correct resistor termination should be applied for the corresponding cable length and CANBus speed Connectors with the incorporated termination can be bought from different companies (ex: ERNI) Also the OPC configuration file should agree with the configuration loaded to the micro controller of the PS (namely Canbus address, speed)

S.PopescuAlice DCS workshop, Colmar, Q3:Wiener firmware problems (3)

S.PopescuAlice DCS workshop, Colmar, Q3:Wiener firmware problems(4) More documentation can be found: – 03-1V111.pdfhttp://itcofe.web.cern.ch/itcofe/Services/Fieldbus/CAN/Cabling/documents/DR3 03-1V111.pdf –“ Standard CANBus signal cables for Alice DCS” R.V.Vlugt

S.PopescuAlice DCS workshop, Colmar, Q5: TOF Trending tool poor and inaccurate (1) PVSS trending tool is mainly an online monitoring tool Data analysis features (like average, errors…) are not implemented If these analysis are needed a simple method will be to export the data to an ascii file and analyze with other tools like root, excel… PVSS trending tool is not simple to be use by non-specialist, but the Framework trending tool was created to make things easier for users

S.PopescuAlice DCS workshop, Colmar, Q5: TOF Trending tool poor and inaccurate (2) amework/welcome.htmlhttp://itcobe.web.cern.ch/itcobe/Projects/Fr amework/welcome.html A short tutorial document can be found at the DCS web page

S.PopescuAlice DCS workshop, Colmar,

S.PopescuAlice DCS workshop, Colmar,

S.PopescuAlice DCS workshop, Colmar, Generally one have in the PVSS log view panel messages like If the manager receives an invalid message from an computer, it cuts the communication with the unknown computer and prints its action in the log viewer To avoid this type of illegal connection, for each manager one can define an “IP access list for TCP server sockets” Documentation about this topics can be found in System management section Q6:TOF PVSS security PVSS00databg (1), :05:21.796, SYS, INFO, 6, Initialization by Data Manager finished PVSS00valarch(0), :02:08.835, SYS, INFO, 0, Lost connection to c ppp.asahi-net.or.jp during initialization due to an illegal message format. PVSS00valarch(0), :19:28.914, SYS, INFO, 0,, Lost connection to pcpdpas1.cern.ch during initialization due to an illegal message format.

S.PopescuAlice DCS workshop, Colmar, Q7: SPD  Elmb, Wiener problems(1) Elmb fake problems –“Elmb ADC operational “ panel is there to make possible changes during the operation –Changes in settings are preferably to be saved in the RAM and not in the EEPROM –One can write in EEPROM maximum times, but one should not exaggerate –One should not configure the EEPROM in the [init] section of the OPCCanServer.cfg file

S.PopescuAlice DCS workshop, Colmar, Q7: SPD  Elmb, Wiener problems(2) Wiener: it is strongly recommended to use the Wiener OPC latest release. –SliC is no longer supported; couldn’t reproduce the errors in our lab –The problems regarding the Wiener firmware should be close monitored by the Wiener company

S.PopescuAlice DCS workshop, Colmar, Conclusion It is highly recommended to use the Framework components and the official OPC server releases Any bug or problem in these two should be reported to us or to IT-CO