Current status of alternative warming up procedure Annex 4 §7.3.4. (OIL#19) WLTP-06-25e T. Yamaguchi, Japan 19.03.2014.

Slides:



Advertisements
Similar presentations
OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
Advertisements

Status of the draft GTR 65th GRPE, January 2013
WLTP Elaborated by the WLTP downscaling issues task force OIL #5 Proposal for modifications of the calculation parameter/coefficients.
Working Paper No. WLTP-09-07e 1 Agenda item 5: Progress report on Downscaling / Gearshifting (OIL #4-9) by H. Steven th WLTP IG meeting, 14.
WLTP rev1e BMW, Christoph Lueginger WLTP Road Load Family
WLTP-11-12e Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce wind tunnel method road load.
Determination of System Equivalency – TaskForce Audi, EA-52, V4.0 WLTP-10-33e.
Default Road Load issue Initial Dutch proposal for a Update Progress report Annex 4 Open Issues: WLTP-07-07e 5. Default road load parameters (OIL.
WLTP-08-19e BMW, Christoph Lueginger WLTP Road Load Family
WLTP Road Load Family concept
WLTP Phase 1B Main Open Issues Road and Dyno Load Presentation at WLTP IG Meeting Geneva Open Issues Road and Dyno Load- K. Kolesa Working paper.
WLTP OIL #6, annex 2, sections 3.2 and 3.3 Determination of engine speeds, calculation of available power.
Progress report of e-Lab sub-group (WLTP-10-12e) 1. Proposals for Adoption 2. Proposals for Discussions 3. Next Actions.
Status report of WLTP Sub Group EV EVE 14. At WLTP IWG 10 Adopted open issues.
WLTP Annex 4 and 7, delta cd*A
Determination of System Equivalency – Starting note for WLTP IWG Meeting #8 in Pune, India Audi, EA-52, V2.0 WLTP-08-09e.
Submitted by the Chair of the WLTP Informal Group Informal document No. GRPE (68th GRPE, Jan. 2014, agenda item 3(a)) Status report of the WLTP Informal.
Working Paper No. WLTP-07-06e short 1 Agenda item 5: Status report on Downscaling / Gearshifting (OIL #4-9) Points that are resolved in the TFs are written.
Progress report of Sub Group EV (WLTP-11-19e) 1. Discussion points 2. Next Actions.
WLTP wind tunnel concept
WLTP N/v tolerance Simulation results and conclusion BMW,
Assessment Criteria for the Acceptability of Cycle and Testing Procedure Informal working document DTP Subgroup LabProcICE slide 1 Assessment Criteria.
WIND TUNNEL METHOD Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce CHASSIS DYNO PRESCRIPTION.
Representative road load test procedure Peter Smeds – Swedish Transport Administration Iddo Riemersma – Transport & Environment WLTP-DTP-LabProcICE-029,
GTR proposal for Roadload determination JAPAN June 2015 WLTP-11-13e.
WLTP ANNEX 4 AND 7, DELTA CD*A BMW, Christoph Lueginger, Thomas Schütz ALTERNATIVE DETERMINATION METHODS WLTP-10-21e.
Representative road load test procedure Peter Smeds – Swedish Transport Administration Iddo Riemersma – Transport & Environment WLTP-DTP-LabProcICE-040a.
WLTP gtr Annex 9 Determination of Method Equivalency - Progress Report
WLTP ANNEX 4, ROAD LOAD CALCULATION Proposal for calculating the road load of individual vehicles C. Lueginger, BMW; A. Feucht, Audi WLTP-DTP-LabProcICE-202.
GTR amendments Japan #14 WLTP IWG at Paris WLTP-14-08e.
Vehicle selection / Family concept - Japan - ICE lab proc mtg 2012/Sep/4-6 WLTP-DTP-LabProcICE-142.
WLTP IWG ISC Taskforce: Starting note
WLPT Phase 2 items. COP and ISC.
India’s Comments on EPPR (Part-B2)
Starting notes for Annex 4 Phase2a Issues
WLTP Informal Working Group
WLTP - GTR No. 15 WLTP-13-15e ECE-TRANS-WP29-GRPE e
Improvement of Wind tunnel Measurement Process Status report
Regulation series WLTP-24-03e_Appendix 4
Improvement of Family definitions
WLTP-DTP-LabProcICE-229
Feed-back approach on RLD
Evaluation on Maximum CO2-Delta in 2-Tests-Approach
IVECO Proposal for Revised CoP Procedure
Idea of family CO2/FC family criteria
Supplemental Test for Determination of CO2 Emissions under Regional Conditions – EU WLTP. Andreas Eder for the Working Group on the Development.
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
Proposal for handling CoP (Conformity of Production)
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
01 General requirements Road load matrix family vehicle definition 02 Annex 4 Wind tunnel for road load matrix family 03 Annex 6 CO2 interpolation range.
Interpolation family criteria OVC-HEV and NOVC-HEV (new proposal)
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Correlation Improvements
Pilot project: Analysis of the relevance of influencing factors when determining CO2 emissions and fuel consumption during type approval of passenger cars.
Lab Process Internal Combustion Engines
Full load curve proposal
Proposal to replace 3 s rule by 2 s rule
Lab Process Internal Combustion Engines
WLTP Annex 4 and 7, delta cd*A
Status report 4WD dynamometer taskforce
Reg. EC 1151/2017 Annex I subpar Annex I subpar 4.2
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 6/10/2019.
Proposal for aerodynamic options
WLTP Open Issue Phase 1B OIL #25: Chassis dynamometer calibration –
Title : Alternative warm-up procedure WLTP rev1e by Japan
Status Report of New Issues TF –CFD* sub wg
OIL# 52: End of PEV range criteria
Japan’s proposal for EPPR-16-09
UNECE WLTP COP task-Force Revision on testing Frequency
UNECE WLTP COP task-Force Revision on testing Frequency
Presentation transcript:

Current status of alternative warming up procedure Annex 4 § (OIL#19) WLTP-06-25e T. Yamaguchi, Japan

The alternative warming up procedure have a possibility to create test result variations. These variations may cause inappropriate information to customer and/or unfair competitions. Japan object to develop alternative procedure due to time shortage for sufficient discussion during phase-1a and propose family definition which can be applied for alternative procedure. Definition of alternative warming up family. What kind of engineering justifications is required. (i.e. Transmission oil temperature, tire surface temperature, R/L setting value and so on) Future application for TA (type approval), COP (conformity of production) and ISC (In-service conformity).

1.Family definition :  Proposal_1 : same as current gtr CO2 family  Proposal_2 : develop new family (Road load family) Exclude parts, which are decoupled in neutral. Increase transmission ratio tolerance, as its influence on road load is almost negligible. Additionally define maximum range for weight, rolling resistance and aerodynamics.  Next Action : Experts continue to have discussions for the initial proposal.

2.Procedure :  If the manufacturer develops the alternative warm up cycle/procedure, the evidence of equivalency shall be demonstrated by the manufacturer to the responsible authority.  Record alternative warming up procedure including detailed conditions.  Next Action : Experts discussion needed for the details of the procedures. Plan to have experts meeting ASAP after 6 th Vienna to develop the initial proposal. Then distribute it to all related CPs for acceptance, aiming for a finalization in the WLTP IG #7 as original phase1b schedule..